← Back
Two family frame
132 WEST 165 STREET
BRONX · Highbridge · BIN 2003212
💬 Discuss this project
1901Year Built
2Stories
B2Building Class
R7-1Zoning
1,540 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation ▸
Two family frame · Owner of record: HANCOCK BEDFORD LLC · 1,297 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 29p · 2 filings · 20 docs
Floor 19p · 2 filings · 20 docs
Cellar10p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED DEVELOPERS1107/08/2026
HANCOCK BEDFORD LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/18/2025$815K—— → —$529/sf building
10/31/2024$330K—— → —$214/sf building
12/22/2017$443K—Private party → 132 W 165 IMPROVEMENT CORP$288/sf building
12/02/2015$439K—132 W 165TH ST INC. → Private party$285/sf building
02/27/2014$155K—Private party → 132 W 165TH ST INC.$101/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRIME ZONE BUILDING CONSULTING410/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor107/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM AND CO CONSULTING LLC8864209/12/2025
Building Lifecycle
All (93)Filed (4)Permit Issued (2)Signed Off (2)Violation (60)Inspection (5)Special Inspection (20)
12/24/2025
Signed off — Alteration
PLUMBING WORK, AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION
X01139308-I1
12/24/2025
Signed off — Alteration
RECTIFY ECB VIOLATIONS #35531035K,35527098X,35524417K,35521822K,35519517L,35518317X,35516116R,39011376P,39011375N.INTERIOR RENOVATION IN EXISTING 2-FAM 2-STY.RESIDENTIAL BUILDING WITH& CEL .NO CHANGE IN USE,MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION
X01134052-I1
12/14/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/08/2025
Filed — Alteration
PLUMBING WORK, AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION
X01139308-P1
09/30/2025
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
09/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
JICHEN SUN
09/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JICHEN SUN
09/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
JICHEN SUN
09/25/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JICHEN SUN
09/15/2025
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
09/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JICHEN SUN
09/15/2025
Special inspection requirement — Interior lighting power
JICHEN SUN
09/15/2025
Special inspection requirement — Insulation placement and R values
JICHEN SUN
09/15/2025
Special inspection requirement — Fenestration areas
JICHEN SUN
09/15/2025
Special inspection requirement — Air barrier - visual inspection
JICHEN SUN
09/15/2025
Special inspection requirement — Fenestration air leakage
JICHEN SUN
09/12/2025
Filed — Alteration
RECTIFY ECB VIOLATIONS #35531035K,35527098X,35524417K,35521822K,35519517L,35518317X,35516116R,39011376P,39011375N.INTERIOR RENOVATION IN EXISTING 2-FAM 2-STY.RESIDENTIAL BUILDING WITH& CEL .NO CHANGE IN USE,MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION
X01134052-P1
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JICHEN SUN
09/11/2025
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
09/11/2025
Special inspection requirement — Fenestration air leakage
JICHEN SUN
09/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JICHEN SUN
09/11/2025
Special inspection requirement — Air barrier - visual inspection
JICHEN SUN
09/11/2025
Special inspection requirement — Interior lighting power
JICHEN SUN
09/11/2025
Special inspection requirement — Insulation placement and R values
JICHEN SUN
09/11/2025
Special inspection requirement — Fenestration areas
JICHEN SUN
05/29/2025
Violation issued (HPD, open)
C
05/29/2025
Violation issued (HPD, closed)
C
02/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/06/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/31/2024
Permit issued — Plumbing
X01139308-I1-PL
12/18/2024
Permit issued — General Construction
X01134052-I1-GC
12/03/2024
Violation issued (HPD, closed)
I
11/11/2024
Filed — Alteration
PLUMBING WORK, AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION
X01139308-I1
11/11/2024
Filed — Alteration
RECTIFY ECB VIOLATIONS #35531035K,35527098X,35524417K,35521822K,35519517L,35518317X,35516116R,39011376P,39011375N.INTERIOR RENOVATION IN EXISTING 2-FAM 2-STY.RESIDENTIAL BUILDING WITH& CEL .NO CHANGE IN USE,MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION
X01134052-I1
02/13/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/27/2023
Violation issued (HPD, closed)
I
01/04/2023
Violation issued (HPD, closed)
C
01/04/2023
Violation issued (HPD, closed)
B
01/04/2023
Violation issued (HPD, closed)
C
01/04/2023
Violation issued (HPD, closed)
B
11/16/2022
Violation issued (HPD, closed)
I
11/03/2022
Violation issued (HPD, closed)
B
11/03/2022
Violation issued (HPD, closed)
B
08/31/2022
Violation issued (HPD, closed)
B
08/31/2022
Violation issued (HPD, closed)
C
08/31/2022
Violation issued (HPD, closed)
C
07/13/2022
Violation issued (HPD, closed)
B
07/13/2022
Violation issued (HPD, closed)
C
07/13/2022
Violation issued (HPD, closed)
B
07/13/2022
Violation issued (HPD, closed)
B
06/12/2022
Violation issued (HPD, closed)
C
06/12/2022
Violation issued (HPD, closed)
B
06/12/2022
Violation issued (HPD, closed)
C
06/12/2022
Violation issued (HPD, closed)
B
03/16/2022
Violation issued (HPD, closed)
I
05/18/2021
Violation issued (ECB, closed)
Construction
04/21/2021
Violation issued (HPD, closed)
I
02/17/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR12/31/2024
DOB NOWGeneral ConstructionSigned-offPRECISION HOME DEV INC12/18/2024
1 project · most recent 10/20/2025
General Wiring
FiledStatusContractorScope
10/20/2025CompleteSKY ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/25/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
09/30/2025Energy Code Compliance InspectionsJICHEN SUNprogress
09/30/2025HVAC-R and service water heating system controlsJICHEN SUNenergy_progress
09/30/2025HVAC-R and service water piping design and insulationJICHEN SUNenergy_progress
09/30/2025HVAC-R and service water heating equipmentJICHEN SUNenergy_progress
09/15/2025Fire-Resistant Penetrations and JointsJICHEN SUNspecial
09/15/2025Energy Code Compliance InspectionsJICHEN SUNprogress
09/15/2025Fenestration and door U-factor and product ratingsJICHEN SUNenergy_progress
09/15/2025Interior lighting powerJICHEN SUNenergy_progress
09/15/2025Insulation placement and R valuesJICHEN SUNenergy_progress
09/15/2025Fenestration areasJICHEN SUNenergy_progress
09/15/2025Air barrier - visual inspectionJICHEN SUNenergy_progress
09/15/2025Fenestration air leakageJICHEN SUNenergy_progress
09/11/2025Fire-Resistant Penetrations and JointsJICHEN SUNspecial
09/11/2025Energy Code Compliance InspectionsJICHEN SUNprogress
09/11/2025Fenestration air leakageJICHEN SUNenergy_progress
09/11/2025Fenestration and door U-factor and product ratingsJICHEN SUNenergy_progress
09/11/2025Air barrier - visual inspectionJICHEN SUNenergy_progress
09/11/2025Interior lighting powerJICHEN SUNenergy_progress
09/11/2025Insulation placement and R valuesJICHEN SUNenergy_progress
09/11/2025Fenestration areasJICHEN SUNenergy_progress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026X01134052-I1Request digital key ↗
08/20/2026X01134052-P1Request digital key ↗
08/18/2026X01139308-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026X01139308-P1Open ↗
08/13/2026X01134052-P1Open ↗
08/13/2026X01134052-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026X01134052-I1Open ↗
09/01/2026X01134052-I1Open ↗
08/31/2026X01139308-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/18/2026X01139308-I1Open ↗
08/18/2026X01139308-P1Open ↗
08/13/2026X01134052-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026X01134052-I1Open ↗
08/27/2026X01134052-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/18/2026X01139308-I1Open ↗
08/18/2026X01139308-P1Open ↗
08/13/2026X01134052-P1Open ↗
Showing 3 of 4 on file for this type