| Owner | Filings | Most Recent |
|---|---|---|
| VBGO PENN PLAZA | 345 | 09/16/2026 |
| VBGO 31 PENN PLAZA | 51 | 07/08/2026 |
| ASTOR RETAIL STRATEGIC VENTURE | 38 | 07/08/2026 |
| PLATINUM SERVICES NY | 7 | 03/22/2026 |
| VBGO PENN PLAZA FEE LLC | 2 | 03/22/2026 |
| 132 W 31ST ST BLDG INVEST | 1 | 03/22/2026 |
| SHALBRO CONSTRUCTION GROUP | 10 | 03/22/2026 |
| PENN TOWER | 74 | 03/22/2026 |
| B. GELLER RESTORATION,INC | 1 | 03/22/2026 |
| GREELAY ACQUISTION LLC | 5 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 01/11/2018 | $31.0M | — | 132 WEST 31ST STREET REALTY CORPORATION → VBGO PENN PLAZA FEE LLC | $81/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| TPG ARCHITECTURE, LLP | 17 | 08/19/2026 |
| MG ENGINEERING D.P.C. | 51 | 08/18/2026 |
| GENSLER | 1 | 03/27/2026 |
| SURFACE DESIGN | 3 | 10/06/2025 |
| SERDAR CEYLAN ARCHITECT, PC | 3 | 04/17/2025 |
| MSM ENGINEERING SERVICES, PLLC | 2 | 03/07/2025 |
| PCS ENGINEERING | 2 | 01/22/2025 |
| DAVID TURNER ARCHITECT PC | 2 | 03/14/2024 |
| THREE STUDIO ARCHITECTURE, D.P.C. | 1 | 08/01/2023 |
| BRUNSWICK ENGINEERING LLC | 3 | 07/28/2023 |
| CUSTODIO CONSULTING, LLC | 2 | 12/22/2022 |
| EP ENGINEERING LLC | 4 | 12/20/2021 |
| LORING CONSULTING ENGINEERS, INC. | 2 | 05/12/2020 |
| ROBERT GERMAIN JR. PE | 2 | 01/27/2020 |
| NIEGO ASSOCIATES | 2 | 04/25/2019 |
| DOOLING & COMPANY ARCHITECTS | 1 | 12/03/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| RIZZO GROUP | 54 | 03/21/2026 |
| OUTSOURCE CONSULTANTS, INC. | 16 | 03/21/2026 |
| NEW YORK SIGN CONSULTANTS | 4 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 3 | 03/21/2026 |
| DOMANI CONSULTING | 4 | 03/21/2026 |
| DAVID TURNER ARCHITECT PC | 4 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 1 | 03/21/2026 |
| RIGGING CONSULTANTS | 4 | 03/21/2026 |
| CORNERSTONE CONSULTING | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| DK CONSTRUCTION ONE, CORP | General Contractor | 20 | 07/08/2026 |
| CJS INDUSTRIES INC | General Contractor | 9 | 07/08/2026 |
| BUILD-SOURCE CORP | General Contractor | 7 | 07/08/2026 |
| A&H EXPRESS PLBG&HTG CORP | Plumbing | 7 | 07/08/2026 |
| RADB CONTRACTING INC | General Contractor | 6 | 03/21/2026 |
| DEPENDABLE MECHANICAL COR | Fire Protection | 5 | 07/08/2026 |
| ACCORD CONTR AND MGMT COR | General Contractor | 4 | 09/16/2026 |
| THE SCI CONSTRUCTION | General Contractor | 4 | 07/08/2026 |
| ROYAL CONCRETE AND MASON* | General Contractor | 3 | 07/08/2026 |
| PLATINUM SERVICES NY LLC | General Contractor | 3 | 03/21/2026 |
| BYPASS MECHANICAL CORP | Plumbing | 3 | 07/08/2026 |
| ICON INTERIORS INC | General Contractor | 3 | 07/08/2026 |
| MAUCERI SIGN | Scaffold | 2 | 07/08/2026 |
| UNIVERSAL MGMT & CONT COR | General Contractor | 2 | 03/21/2026 |
| CC CONTROLLED PLBG CO.,IN | Plumbing | 2 | 07/08/2026 |
| CC CONTROLLED PLBG CO INC | Plumbing | 2 | 07/08/2026 |
| AMERICON CONSTRUCTION INC. | General Contractor | 2 | 04/09/2026 |
| BARRY SAXE | Electrical | 2 | 03/21/2026 |
| A&A PLUMBING CORP | Plumbing | 1 | 07/08/2026 |
| COPPER PLUMBING INC | Plumbing | 1 | 07/08/2026 |
| G.P. MECHANICAL CORP | Plumbing | 1 | 07/08/2026 |
| JAM SERVICE CO., INC | Plumbing | 1 | 07/08/2026 |
| L&J PLG & HTG CO OF NY IN | Plumbing | 1 | 07/08/2026 |
| P.S.I. MECHANICAL | Plumbing | 1 | 07/08/2026 |
| STANDARD PLBG SVS LLC | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ALAN MARGOLIN & ASSOC | 423 | 49 | 08/19/2026 |
| WB ENGINEERING | 533 | 4 | 03/27/2026 |
| SURFACE DESIGN PROFESSION | 3968 | 3 | 10/06/2025 |
| MTD GROUP INSPECTIONS,INC | 9388 | 4 | 05/21/2025 |
| CEYLAN DESIGN AND CONSULT | 8422 | 3 | 04/17/2025 |
| CROSSCHECK INSPECTION SER | 544 | 1 | 04/15/2025 |
| PCS ENGINEERING | 3745 | 2 | 01/22/2025 |
| DAVID TURNER ARCHITECT PC | 3829 | 1 | 04/20/2023 |
| MILROSE CONSULTANTS LLC | 2003 | 1 | 06/10/2022 |
| OUTSOURCE SPECIAL INSPECT | 2827 | 5 | 12/20/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | ACCORD CONTR AND MGMT COR | 09/15/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | ACCORD CONTR AND MGMT COR | 09/15/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | DK CONSTRUCTION ONE, CORP | 04/30/2026 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 04/29/2026 |
| DOB NOW | Mechanical Systems | Signed-off | DK CONSTRUCTION ONE, CORP | 04/27/2026 |
| DOB NOW | Sprinklers | Permit Issued | CMA PLUMBING & HEATING IN | 04/27/2026 |
| DOB NOW | Sprinklers | Permit Issued | DEPENDABLE MECHANICAL COR | 04/15/2026 |
| DOB NOW | General Construction | Permit Issued | DK CONSTRUCTION ONE, CORP | 04/15/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 04/13/2026 |
| DOB NOW | General Construction | Permit Issued | AMERICON CONSTRUCTION INC. | 04/03/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | AMERICON CONSTRUCTION INC. | 04/02/2026 |
| DOB NOW | General Construction | Signed-off | ACCORD CONTR MGMT COR | 08/06/2025 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 07/29/2025 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 07/29/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | M & L SIGNS, INC | 07/23/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | M & L SIGNS, INC | 07/22/2025 |
| DOB NOW | General Construction | Signed-off | THE SCI CONSTRUCTION | 05/22/2025 |
| DOB NOW | Mechanical Systems | Signed-off | THE SCI CONSTRUCTION | 05/22/2025 |
| DOB NOW | General Construction | Signed-off | BUILD-SOURCE CORP | 05/07/2025 |
| DOB NOW | Mechanical Systems | Signed-off | ICON INTERIORS INC | 04/15/2025 |
| DOB NOW | General Construction | Signed-off | ROYAL CONCRETE AND MASON* | 03/05/2025 |
| DOB NOW | General Construction | Signed-off | ROYAL CONCRETE AND MASON* | 02/10/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | M & L SIGNS, INC | 01/23/2025 |
| DOB NOW | General Construction | Signed-off | ROYAL CONCRETE AND MASON* | 01/06/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | M & L SIGNS, INC | 12/20/2024 |
| DOB NOW | Plumbing | Permit Issued | COPPER MECHANICAL INC | 12/12/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | JEPOL CONSTRUCTION INC | 10/30/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | PLATINUM SERVICES NY LLC | 10/28/2024 |
| DOB NOW | General Construction | Permit Issued | MEDCON SERVICES, LLC | 10/01/2024 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 07/24/2024 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 06/04/2024 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 05/23/2024 |
| DOB NOW | Mechanical Systems | Signed-off | DK CONSTRUCTION ONE, CORP | 05/17/2024 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 05/16/2024 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 05/16/2024 |
| DOB NOW | General Construction | Signed-off | DK CONSTRUCTION ONE, CORP | 05/10/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | CJS INDUSTRIES INC | 05/09/2024 |
| DOB NOW | Sprinklers | Signed-off | MORA FIRE PROTECTION LLC | 04/18/2024 |
| DOB NOW | Plumbing | Signed-off | A&H PLUMBING,LLC | 04/17/2024 |
| DOB NOW | General Construction | Signed-off | ICON INTERIORS INC | 04/16/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/26/2026 | Permit Issued | AMERICON CONSTRUCTION INC | Air Conditioning Systems | Cooling Task TYS203VAV-HE 231,700 BTU ×3 |
| 03/20/2025 | Permit Issued | CJS INDUSTRIES INC | Air Conditioning Systems | Cooling Sigma SDSV-C.2-180-2-C-2-DS-H-A-G-A-2-S-A-S-0 185,000 BTU ×2 SDSV-C.2-240-2-C-1-DS-H-A-G-A-1-S-A-S-0 251,000 BTU ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/18/2026 | — | — | 15 heads |
| 03/26/2026 | Permit Issued | CMA PLUMBING & HEATING IN | 257 heads |
| 03/25/2026 | — | — | — |
| 05/21/2025 | Signed-off | A&H EXPRESS PLBG&HTG CORP | 76 heads |
| 05/12/2020 | — | — | 182 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/18/2026 | — | — | — |
| 04/22/2026 | Signed-off | DEPENDABLE MECH CORP | Water/Sanitary |
| 03/26/2026 | — | — | — |
| 03/26/2026 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 03/25/2026 | — | — | Water/Sanitary |
| 06/25/2024 | Signed-off | DEPENDABLE MECH CORP | Water/Sanitary |
| 04/20/2023 | — | — | Water/Sanitary |
| 05/12/2020 | — | — | Water/Sanitary |
| 11/20/2019 | Permit Issued | CC CONTROLLED PLBG CO.,IN | Gas |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/10/2026 | Permit Issued | A.S.K. ELECTRICAL CORP | General Wiring |
| 01/20/2026 | Complete | TITAN ELEC'L & ELEV CONTR | General Wiring |
| 06/10/2025 | Permit Issued | CRESCO ELECTRICAL CORP | General Wiring |
| 10/25/2024 | Complete | TITAN ELEC'L & ELEV CONTR | General Wiring |
| 10/25/2024 | Complete | RICHARD NEU | — |
| 04/08/2024 | Complete | ALBA ELECTRIC CORP | General Wiring |
| 11/08/2023 | Permit Issued | ROBERT CHIMENTI | 3 meters, 1 new_meters |
| 09/12/2023 | Permit Issued | ALL CITY ELECTRICAL INC | General Wiring |
| 02/07/2023 | Complete | UNITED ELEC'L CONT'G CORP | General Wiring |
| 12/11/2020 | Permit Issued | ADVANCED ELECTL CONCPS IN | General Wiring |
| 10/21/2020 | Permit Issued | HV ELECTRIC CORP | — |
| 06/10/2020 | Complete | ALBA ELECTRIC CORP | General Wiring |
| 03/26/2020 | Permit Issued | NOVA ELECTRIC LLC | General Wiring |
| 10/02/2019 | Permit Issued | BRANDL ELECTRIC INC. | General Wiring |
| 04/03/2019 | Complete | NOVA ELECTRIC LLC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/22/2025 | Permit Issued | M & L SIGNS, INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/14/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/14/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/21/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/28/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/28/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/16/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/29/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/20/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/06/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/17/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 11/13/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/10/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/10/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/13/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/21/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/16/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/02/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 02/18/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/11/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/15/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/15/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/17/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/03/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/27/2026 | Duct leakage testing, insulation and design | Young Suh | energy_progress |
| 07/27/2026 | Maintenance information | Young Suh | energy_progress |
| 07/23/2026 | Mechanical Systems | Young Suh | special |
| 07/23/2026 | Energy Code Compliance Inspections | Young Suh | progress |
| 07/23/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 07/23/2026 | Final | Young Suh | progress |
| 07/23/2026 | Interior lighting power | Young Suh | energy_progress |
| 07/23/2026 | Fire-Resistance Rated Construction | Young Suh | progress |
| 07/23/2026 | Final | JAMES DOHERTY | progress |
| 07/23/2026 | Lighting controls | Young Suh | energy_progress |
| 03/27/2026 | HVAC-R and service water heating system controls | Young Suh | energy_progress |
| 03/27/2026 | HVAC-R and service water heating equipment | Young Suh | energy_progress |
| 03/27/2026 | HVAC-R and service water piping design and insulation | Young Suh | energy_progress |
| 03/26/2026 | Duct leakage testing, insulation and design | Young Suh | energy_progress |
| 03/26/2026 | Energy Code Compliance Inspections | Young Suh | progress |
| 03/25/2026 | Lighting controls | Young Suh | energy_progress |
| 03/25/2026 | Post-installed Anchors | Young Suh | special |
| 03/25/2026 | Mechanical Systems | Young Suh | special |
| 03/25/2026 | Energy Code Compliance Inspections | Young Suh | progress |
| 03/25/2026 | Final | Young Suh | progress |
| 03/25/2026 | Interior lighting power | Young Suh | energy_progress |
| 03/25/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 03/25/2026 | Post-installed Anchors | Young Suh | special |
| 03/25/2026 | Sprinkler Systems | Young Suh | special |
| 03/17/2026 | Lighting controls | David Bonifacic | energy_progress |