← Back
Limited service hotel, often national chain
Night Theater District
132 WEST 45 STREET · Name © OpenStreetMap contributors · Midtown-Times Square · BIN 1022632
💬 Discuss this project
1900Year Built
8Stories
H3Building Class
C6-5.5Zoning
22,880 sfGross Floor Area
1Units
Rent Stabilized26 Open Violations 20 unresolved · 6 paperwork only ▸FISP: SWARMP
Limited service hotel, often national chain · Owner of record: B.K.B.W. REALTY CORP. · 3,518 sf lot · 6.5 FAR built · Flood zone X
Locations of Work
Architecture
Floor 11p · 1 filing · 11 docs
Cellar2p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
B.K.B.W. REALTY CORP.2003/22/2026
HOTEL SCOTT CORP203/21/2026
SURREY HOTEL ASSOCIATES2703/21/2026
HAMPSHIRE HOTELS & RESORTS LLC803/21/2026
HAMPSHIRE303/21/2026
BKB WEST REALTY203/21/2026
KENSINGTON203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MM ARCHITECT PC205/12/2025
RICHARD KOENIGSBERG101/04/2023
FL&M ENGINEERING DESIGN &INSPECTION112/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GEORGE E BERGER ASS403/21/2026
AE DESIGN SOLUTION203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor603/21/2026
BUILD UP RESTORATION LLCGeneral Contractor203/21/2026
JOSEPH SORTINOElectrical103/21/2026
OLIVER CHRISTOPHERElectrical103/21/2026
DK BUILDERS INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MM ARCHITECT PC3934105/12/2025
SANDEEP GUNNALA ENGINEERI8482105/12/2025
KOENIGSBERG ENGINEERING,2247101/04/2023
Building Lifecycle
All (131)Filed (5)Permit Issued (5)Signed Off (4)Facade (FISP) (9)Violation (60)Objection (29)Special Inspection (19)
08/11/2026
Violation issued (ECB, open)
Elevators
08/11/2026
Violation issued (ECB, open)
Construction
08/11/2026
Violation issued (ECB, open)
Construction
08/11/2026
Violation issued (ECB, open)
Unknown
08/11/2026
Violation issued (ECB, open)
Unknown
08/11/2026
Violation issued (ECB, open)
Unknown
08/11/2026
Violation issued (ECB, open)
Unknown
08/11/2026
Violation issued (ECB, open)
Elevators
07/06/2026
Objection resolved — Addressed
06/25/2026
Violation issued (ECB, open)
Construction
04/03/2026
Objection raised — Admin
04/03/2026
Objection raised — Cost
03/10/2026
Objection resolved — Addressed
03/10/2026
Objection resolved — Resolved
03/10/2026
Objection resolved — Resolved
03/10/2026
Objection resolved — Resolved
03/10/2026
Objection resolved — Resolved
03/10/2026
Objection resolved — Addressed
03/10/2026
Objection resolved — Addressed
03/10/2026
Objection resolved — Resolved
03/10/2026
Objection resolved — Addressed
03/10/2026
Objection resolved — Addressed
08/26/2025
Signed off — Alteration
IT IS PROPOSED TO INSTALL FRESH AIR INTAKE IN GAS METER ROOM LOCATED IN CELLAR. APPLICATION FILED TO ADDRESS ECB VIOLATION 39121631K. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01211196-I1
08/06/2025
Violation issued (ECB, closed)
Construction
08/06/2025
Violation issued (ECB, closed)
Construction
08/06/2025
Violation issued (ECB, closed)
Construction
08/06/2025
Violation issued (ECB, closed)
Construction
08/05/2025
Permit issued — General Construction
M01211196-I1-GC
05/12/2025
Filed — Alteration
IT IS PROPOSED TO INSTALL FRESH AIR INTAKE IN GAS METER ROOM LOCATED IN CELLAR. APPLICATION FILED TO ADDRESS ECB VIOLATION 39121631K. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01211196-I1
05/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
Sandeep Gunnala
04/15/2025
Special inspection requirement — Final
Matt Markowitz
04/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
Matt Markowitz
04/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matt Markowitz
03/17/2025
Objection raised — Other
03/17/2025
Objection raised — Structural
03/17/2025
Objection raised — Other
03/17/2025
Objection raised — Fire_Protection
03/17/2025
Objection raised — Structural
03/17/2025
Objection raised — Fire_Protection
03/17/2025
Objection raised — Zoning
03/14/2025
Objection raised — Zoning
03/14/2025
Objection raised — Structural
03/14/2025
Objection raised — Structural
03/14/2025
Objection raised — Structural
03/14/2025
Objection raised — Admin
03/14/2025
Objection raised — Scope
03/14/2025
Objection raised — Inspections
03/14/2025
Objection raised — Other
03/14/2025
Objection raised — Fire_Protection
03/05/2025
Signed off — Alteration
Renewal of 23/2164
M00985401-I1
02/28/2025
Filed — Alteration CO
M01000749-I1
02/28/2025
Special inspection requirement — Lighting controls
02/28/2025
Special inspection requirement — Interior lighting power
02/28/2025
Special inspection requirement — Fenestration air leakage
02/28/2025
Special inspection requirement — Electrical motors and elevators
02/28/2025
Special inspection requirement — Exterior lighting power
02/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
02/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
02/28/2025
Special inspection requirement — Insulation placement and R values
Latest 60 of 131 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBUILD UP RESTORATION LLC08/05/2025
DOB NOWSuspended ScaffoldPermit IssuedRK CONTRACTING INC01/12/2024
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC12/21/2023
DOB NOWGeneral ConstructionSigned-offDK BUILDERS INC07/21/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC12/26/2022
BISFPISSUEDMASTER FIRE SYSTEMS, INC03/20/2014
BISEQISSUEDEVEREST SCAFFOLDING INC07/25/2012
BISPLISSUEDTHE RIGHT CONNECTION P&H11/28/2006
BISFPISSUEDCHIEF FIRE PREVENTION & MECHANI05/23/2006
BISMHISSUEDALPHA RENOVATIONS MANGAGEMENT CO04/19/2006
BISPLISSUEDTHE RIGHT CONNECTION P&H03/01/2006
BISMHISSUEDTHE RIGHT CONNECTIONP & H INC03/01/2006
BISPLISSUEDTHE RIGHT CONNECTION P&H02/27/2006
BISOTISSUEDCONNECTION CONT'G CORP. CORP.12/16/2005
BISOTISSUEDCONNECTION CONT'G CORP11/21/2005
BISOTISSUEDCONNECTION CONT'Q CORP08/25/2005
BIS—ISSUEDCONNECTION CONT'Q CORP08/25/2005
BISEQISSUEDOUTDOOR INSTALLATIONS LLC08/16/2005
BISOTISSUEDCONNECTON CONTR. CORP08/12/2005
BISOTISSUEDCONNECTION CONT CORP08/09/2005
BISMHISSUEDCONN. CONTR.08/09/2005
BISOTISSUEDCONNECTIN CONTR. CORP.07/18/2005
BISMHISSUEDCONNECTION CONTRACTING CORP07/08/2005
BISSPISSUEDTHE RIGHT CONNECTION P&H06/03/2005
BISOTISSUEDCONNECTIN CONTR. CORP.02/28/2005
BISBLISSUEDTHE RIGHT CONNECTION P&H02/09/2005
BISPLISSUEDTHE RIGHT CONNECTION P&H02/09/2005
BISOTISSUEDCONNN. CONTR.01/31/2005
BISEQISSUEDCONNECT CONTR.01/21/2005
BISEQISSUEDSPRING SCAFF.12/21/2004
BISSPISSUEDTHE RIGHT CONNECTION P&H06/03/2004
BISFPISSUEDCHIEF FIRE PREV MECH.11/18/2003
BISPLISSUEDTHE RIGHT CONNECTION P&H11/05/2003
BISMHISSUEDCONN. CONTR.10/31/2003
BISSPISSUEDTHE RIGHT CONNECTION P&H05/23/2003
BISEQISSUEDSPRING ENTERPRIS INC.03/29/2002
BISOTISSUEDTROJAN CONSTRUCTION CORP`11/14/2001
BISSPISSUEDTHE RIGHT CONNECTION P&H06/22/2000
BISPLISSUEDTHE RIGHT CONNECTION P&H03/30/2000
BISPLISSUEDTHE RIGHT CONNECTION P&H03/15/2000
+ 6 more permits on file
4 projects · most recent 10/10/2024
FiledStatusContractorScope
10/10/2024Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
12/27/2022CompleteTOP SHELF ELECTRIC CORP—
10/15/2021CompleteBOROWIDE ELECT'L CONTR'S—
10/15/2021CompleteBOROWIDE ELECT'L CONTR'S—
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
05/12/2025Tenant Protection Plan ComplianceSandeep Gunnalaspecial
04/15/2025FinalMatt Markowitzprogress
04/15/2025Fire-Resistance Rated ConstructionMatt Markowitzprogress
04/15/2025Fire-Resistant Penetrations and JointsMatt Markowitzspecial
02/28/2025Lighting controls—energy_progress
02/28/2025Interior lighting power—energy_progress
02/28/2025Fenestration air leakage—energy_progress
02/28/2025Electrical motors and elevators—energy_progress
02/28/2025Exterior lighting power—energy_progress
02/28/2025Fenestration and door U-factor and product ratings—energy_progress
02/28/2025Fire-Resistant Penetrations and Joints—special
02/28/2025Fire-Resistance Rated Construction—progress
02/28/2025Insulation placement and R values—energy_progress
02/28/2025Air barrier - visual inspection—energy_progress
02/27/2025Tenant Protection Plan Compliance—special
02/05/2024Structural Stability – Alterations of existing buildings—special
12/07/2022MasonryRICHARD KOENIGSBERGspecial
12/07/2022Post-installed AnchorsRICHARD KOENIGSBERGspecial
12/07/2022FinalRICHARD KOENIGSBERGprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Night HotelOtherFloor 9, Penthouse
Project M01000749 Alteration CO · Objections · 02/28/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026M00800696-I1Request digital key ↗
09/01/2026M08050979-I1Request digital key ↗
08/28/2026M00985401-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
03/28/2014121942595Open ↗
07/27/2012121164364Open ↗
▸BISWORK PERMIT APPLICATION2
03/27/2014121942595Open ↗
07/27/2012121164364Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026M01000749-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026M01000749-I1Open ↗
▸Seals & Professional Certifications19
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
06/24/2014121942595Open ↗
03/27/2014121942595Open ↗
07/27/2012121164364Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026M08050979-I1Open ↗
08/26/2026M08050979-I1Open ↗
08/23/2026M01211196-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026M00800696-I1Open ↗
08/13/2026M08050979-I1Open ↗
08/13/2026M01000749-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026M08050979-I1Open ↗
08/23/2026M01211196-I1Open ↗
08/23/2026M01211196-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/28/2014121942595Open ↗
07/27/2012121164364Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
03/28/2014121942595Open ↗
07/27/2012121164364Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
06/24/2014121942595Open ↗
▸Safety & Tenant Protection6
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist4
08/13/2026M01000749-I1Open ↗
08/13/2026M01211196-I1Open ↗
08/13/2026M08050979-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
07/27/2012121164364Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M01000749-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026M01000749-I1Open ↗
08/13/2026M08050979-I1Open ↗
08/13/2026M01211196-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
07/27/2012121164364Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/24/2014121942595Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/24/2014121942595Open ↗
03/28/2014121942595Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
03/28/2014121942595Open ↗
07/27/2012121164364Open ↗
▸Other Documents6
▸DOB NOWManufacturer's Specifications1
08/13/2026M00985401-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026M01000749-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M00985401-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M01000749-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026M01000749-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026M01000749-I1Open ↗