Elevator apt, fireproof with stores
177 EAST 75 STREET
MANHATTAN · BIN 1043149
💬 Discuss this project
1962Year Built
20.5Stories
D6Building Class
C1-9Zoning
186,802 sfGross Floor Area
103Units
LL97 CoveredRent Stabilized3 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: JOSHUA BAILY SHIPPING COMPANY LLC · 12,260 sf lot · 15.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Floor 1Under Construction13p · 7 filings · 20 docs
CellarUnder Construction10p · 7 filings · 20 docs
1 job · most recent 04/04/2023
Air Conditioning Systems Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/04/2023Permit IssuedCLUNE CONSTRUCTION CO LPAir Conditioning Systems, Associated Ducts and Piping, Ventilation Systems
Cooling
Alliance BAA-036-H3-NC 3 tons · Condensing Unit ×2
Ventilation
Greenheck CSP-A510 435 CFM · Exhaust Fan ×1
Ducts & Piping
N/A N/A Ductwork ×1
11 jobs · most recent 05/01/2025
General Wiring
FiledStatusContractorScope
05/01/2025Permit IssuedTruephase Electrical ContractorsGeneral Wiring
06/27/2024CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
06/11/2024CompleteBOROWIDE ELECT'L CONTR'S—
10/27/2021Permit IssuedSIGNS CAD CORP—
10/27/2021Permit IssuedSIGNS CAD CORP—
05/12/2021CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
03/24/2021CompleteM.C. ELECTRICAL NY INCGeneral Wiring
07/25/2019Permit IssuedRICHARD NEU—
06/17/2019CompleteALTEC E & M, INC. ELEC'LGeneral Wiring
07/22/2018CompleteDAVEN ELECTRIC CORPGeneral Wiring
06/28/2018Permit IssuedAWESOME ELECTL CONTNG INC1 meters, 1 new_meters
1 job · most recent 03/23/2026
Steel Concrete
FiledStatusContractorScope
03/23/2026Permit IssuedSTRUCTURAL PRESERV SYSTEMSteel, Concrete
Building Lifecycle
All (217)Filed (32)Permit Issued (36)Signed Off (24)Facade (FISP) (25)Violation (60)Inspection (10)Special Inspection (30)
06/24/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
06/22/2026
Permit issued — Structural
M01366821-I1-ST
06/17/2026
Cycle 10 facade report submitted
06/17/2026
Cycle 10 facade report signed — SWARMP
05/09/2026
Cycle 10 facade inspection completed
04/29/2026
Violation issued (HPD, open)
A
04/21/2026
Signed off — Alteration
M01197173-I1
03/23/2026
Filed — Alteration
Structural modifications taking place on garage ramp from 1st to cellar level for repairs. No change in use, egress or occupancy.
M01366821-I1
08/11/2025
Permit issued — Sign
M01197173-S1-SG
08/11/2025
Permit issued — Sign
M01197173-I1-SG
06/10/2025
Cycle 9 facade report signed — SAFE
06/04/2025
Cycle 9 facade report submitted
06/04/2025
Violation issued (HPD, closed)
A
04/25/2025
Signed off — Alteration
FACADE REPAIR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01012057-I1
04/17/2025
Cycle 9 facade inspection completed
04/08/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M01061123-I1
04/08/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01061117-I1
03/24/2025
Filed — Alteration
M01197173-I1
03/24/2025
Filed — Alteration
M01197173-S1
03/20/2025
Special inspection requirement — Final
Ari Kamo
03/20/2025
Special inspection requirement — Final
Ari Kamo
03/20/2025
Special inspection requirement — Post-installed Anchors
Ari Kamo
12/11/2024
Violation issued (FDNY_ORDER, closed)
07/18/2024
Permit issued — General Construction
M01012057-I1-GC
07/08/2024
Permit issued — Suspended Scaffold
M01072529-I1-SC
07/02/2024
Filed — Alteration
M01072529-I1
06/26/2024
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
06/26/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
06/21/2024
Signed off — Alteration
M00918478-I1
06/06/2024
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M01061123-I1
06/06/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01061117-I1
06/06/2024
Permit issued — Protection and Mechanical Methods
M01061123-I1-PMM
06/06/2024
Permit issued — Sidewalk Shed
M01061117-I1-SH
04/01/2024
Violation issued (HPD, closed)
A
02/29/2024
Filed — Alteration
FACADE REPAIR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01012057-I1
02/14/2024
Signed off — Alteration
M00852244-I1
02/08/2024
Signed off — Alteration
M00867785-I1
01/24/2024
Signed off — Alteration
Application filed for Interior renovation of non-load bearing partitions, ceilings and finishes for Cellar and 1st floor Store (JECT) as per plans filed herewith. No change in use, egress or occupancy
M00852242-I1
01/23/2024
Permit issued — Mechanical Systems
M00852243-I1-MS
01/02/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/02/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/08/2023
Signed off — Alteration
APPLICATION FILED FOR INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE ON THE 1ST FLOOR EXTERIOR FOR STORE (JECT) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00873085-I1
10/24/2023
Filed — Alteration
Application filed for Interior renovation of non-load bearing partitions, ceilings and finishes for Cellar and 1st floor Store (JECT) as per plans filed herewith. No change in use, egress or occupancy
M00852242-P1
10/17/2023
Special inspection requirement — Tenant Protection Plan Compliance
10/17/2023
Special inspection requirement — Lighting controls
Ari Kamo
10/17/2023
Special inspection requirement — Interior lighting power
Ari Kamo
10/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
Ari Kamo
10/17/2023
Special inspection requirement — Final
JEREMY SINGER
10/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
09/18/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00195641-I1
09/11/2023
Permit issued — Mechanical Systems
M00918478-I1-MS
08/30/2023
Filed — Alteration
M00918478-I1
07/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/31/2023
Permit issued — General Construction
M00867785-I1-GC
05/23/2023
Permit issued — Construction Fence
M00873085-I1-FN
05/18/2023
Filed — Alteration
APPLICATION FILED FOR INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE ON THE 1ST FLOOR EXTERIOR FOR STORE (JECT) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00873085-I1
05/16/2023
Filed — Alteration
M00867785-I1
05/02/2023
Permit issued — Plumbing
M00852244-I1-PL
04/28/2023
Permit issued — General Construction
M00852242-I1-GC
04/04/2023
Filed — Alteration
M00852244-I1
Latest 60 of 217 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RODNEY14609/13/2026
KINGS GROUP NY CORP903/22/2026
JOSHUA BAILY SHIPPING COMPANY2703/22/2026
A W R GROUP103/22/2026
DYNE COMPANY CORP103/22/2026
PYNE COMPANY CORPORATI203/22/2026
CHICO'S203/21/2026
RODIER203/21/2026
SEAGRAVE303/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS103/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
EA DESIGN GROUP1803/21/2026
SEAY-YARBROUGH1003/21/2026
RIZZO GROUP603/21/2026
JP EXPEDITE603/21/2026
BUILDING BROTHERS203/21/2026
LOMBARDO BUILDING CONSULTANTS203/21/2026
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CLUNE CONSTRUCTION CO LPGeneral Contractor1707/08/2026
KINGS GROUP NY CORPGeneral Contractor903/21/2026
DOMINICK CATELLOElectrical503/21/2026
BLUEHILL CONST.INCGeneral Contractor507/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor407/08/2026
PRO STAR PLBG,HTG&MECH INPlumbing307/08/2026
GSK CONTRACTING CORPGeneral Contractor303/21/2026
GMD SHIPYARD CORPElectrical203/21/2026
P & D MECHANICAL CORPFire Protection207/08/2026
A W R GROUP INCGeneral Contractor203/21/2026
VALLESIGNS AWNINGSScaffold207/08/2026
GENOVESE, JOSEPHElectrical203/21/2026
OMARA ORGANIZATION INCGeneral Contractor203/21/2026
SIGNS CADScaffold207/08/2026
HOWARD ZAMKOFFElectrical203/21/2026
N Y SIGN ARTScaffold107/08/2026
SIGNS CAD CORPGeneral Contractor107/08/2026
FIVE BORO ASSOCIATES INCFire Protection107/08/2026
STRUCTURAL PRESERV SYSTEMGeneral Contractor106/28/2026
MACREDDIN PLBG & HTG INCPlumbing107/08/2026
NATIONAL MAINTENANCE INCElectrical103/21/2026
RUSS FLAUMElectrical103/21/2026
EDUARDO PAREDESElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803103/23/2026
MEP INSPECTIONS, INC1102603/23/2026
AK ENGINEERING PC6781103/24/2025
KZ ENGINEERING, P.C.4665107/02/2024
CITY SAFETY COMPLIANCE CO8919102/29/2024
SCOPE ENGINEERING CONSULT7894102/29/2024
BEYOND ARCH LLC3600109/08/2021
GILSANZ MURRAY STEFICEK240102/23/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedSTRUCTURAL PRESERV SYSTEM06/22/2026
DOB NOWSignSigned-offVALLESIGNS & AWNINGS INC08/11/2025
DOB NOWSignSigned-offVALLESIGNS & AWNINGS INC08/11/2025
DOB NOWGeneral ConstructionSigned-offA W R GROUP INC07/18/2024
DOB NOWSuspended ScaffoldPermit IssuedA W R GROUP INC07/08/2024
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC06/06/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC06/06/2024
DOB NOWMechanical SystemsPermit IssuedCLUNE CONSTRUCTION CO LP01/23/2024
DOB NOWMechanical SystemsSigned-offCLUNE CONSTRUCTION CO LP09/11/2023
DOB NOWGeneral ConstructionSigned-offCLUNE CONSTRUCTION CO LP05/31/2023
DOB NOWConstruction FenceSigned-offCLUNE CONSTRUCTION CO LP05/23/2023
DOB NOWPlumbingSigned-offPRO STAR PLBG,HTG&MECH IN05/02/2023
DOB NOWGeneral ConstructionSigned-offCLUNE CONSTRUCTION CO LP04/28/2023
DOB NOWGeneral ConstructionPermit IssuedBLUEHILL CONST.INC02/18/2022
DOB NOWSprinklersSigned-offP & D MECHANICAL CORP12/03/2021
DOB NOWStructuralSigned-offSIGNS CAD CORP09/27/2021
DOB NOWSignSigned-offSIGNS CAD CORP09/10/2021
DOB NOWSignSigned-offSIGNS CAD CORP09/09/2021
DOB NOWGeneral ConstructionSigned-offCLUNE CONSTRUCTION CO LP08/18/2021
DOB NOWMechanical SystemsSigned-offCLUNE CONSTRUCTION CO LP08/18/2021
DOB NOWPlumbingSigned-offPRO STAR PLBG,HTG&MECH IN07/15/2021
DOB NOWSprinklersSigned-offFIVE BORO ASSOCIATES INC05/28/2021
DOB NOWConstruction FenceSigned-offOMARA ORGANIZATION INC05/26/2021
DOB NOWMechanical SystemsSigned-offCLUNE CONSTRUCTION CO LP05/13/2021
DOB NOWGeneral ConstructionSigned-offCLUNE CONSTRUCTION CO LP05/13/2021
DOB NOWPlumbingSigned-offPRO STAR PLBG,HTG&MECH IN05/11/2021
DOB NOWPlumbingSigned-offP & D MECHANICAL CORP04/08/2021
DOB NOWStructuralSigned-offBLUEHILL CONST.INC04/07/2021
DOB NOWMechanical SystemsSigned-offBLUEHILL CONST.INC04/06/2021
DOB NOWPlumbingSigned-offMACREDDIN PLBG & HTG INC04/06/2021
DOB NOWGeneral ConstructionSigned-offBLUEHILL CONST.INC04/06/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP09/22/2020
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP09/23/2019
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP07/25/2019
DOB NOWConstruction FenceSigned-offGSK CONTRACTING CORP03/28/2018
DOB NOWSignSigned-offVALLESIGNS & AWNINGS INC03/02/2018
BISOTISSUEDA W R GROUP INC03/25/2020
BIS—ISSUEDGSK CONTRACTING CORP09/10/2018
BISPLISSUEDAUTHENTIC PLBG CORP04/26/2018
BIS—ISSUEDGSK CONTRACTING CORP04/24/2018
+ 45 more permits on file
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
06/24/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
01/02/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/08/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/07/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/01/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/25/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/18/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/16/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
03/20/2025FinalAri Kamoprogress
03/20/2025FinalAri Kamoprogress
03/20/2025Post-installed AnchorsAri Kamospecial
06/26/2024Post-installed AnchorsKarol Zdancewiczspecial
06/26/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
10/17/2023Tenant Protection Plan Compliance—special
10/17/2023Lighting controlsAri Kamoenergy_progress
10/17/2023Interior lighting powerAri Kamoenergy_progress
10/17/2023Fire-Resistance Rated ConstructionAri Kamoprogress
10/17/2023FinalJEREMY SINGERprogress
10/17/2023Fire-Resistant Penetrations and JointsAri Kamospecial
04/03/2023Tenant Protection Plan ComplianceAri Kamospecial
03/31/2023Shutoff dampersAri Kamoenergy_progress
03/31/2023Fire-Resistant Penetrations and JointsAri Kamospecial
03/31/2023Maintenance informationAri Kamoenergy_progress
03/31/2023Energy Code Compliance InspectionsAri Kamoprogress
03/31/2023HVAC-R and service water heating equipmentAri Kamoenergy_progress
03/31/2023HVAC-R and service water piping design and insulationAri Kamoenergy_progress
03/31/2023HVAC-R and service water heating system controlsAri Kamoenergy_progress
03/31/2023Duct leakage testing, insulation and designAri Kamoenergy_progress
03/29/2023Mechanical SystemsAri Kamospecial
03/29/2023FinalAri Kamoprogress
12/23/2021Post-installed AnchorsNicolas Crosettospecial
12/16/2021Fire-Resistant Penetrations and JointsNicolas Crosettospecial
12/16/2021FinalThomas Hughesprogress
Latest 25 of 55.
▾Documents — 515 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch27
09/06/2026M00020039-I1Request digital key ↗
09/06/2026M00029373-I1Request digital key ↗
09/03/2026M00499904-P1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00195641-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00461944-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00461973-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00471231-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00471190-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00471231-I1Request digital key ↗
▸Applications & Permits90
▸BISPLAN / WORK APPROVAL APPLICATION52
06/07/2021123189272Open ↗
05/06/2021123189272Open ↗
08/16/2019140864955Open ↗
Showing 3 of 52 on file for this type
▸BISWORK PERMIT APPLICATION36
03/27/2020123753991Open ↗
09/16/2019123753991Open ↗
09/10/2018123189272Open ↗
Showing 3 of 36 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/15/2018123189272Open ↗
▸BISPLACE OF ASSEMBLY SIGN OFF1
05/18/2018123218320Open ↗
▸Seals & Professional Certifications165
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION55
11/26/2019123387584Open ↗
11/26/2019123387584Open ↗
08/06/2019123753991Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature32
09/06/2026M00020039-I1Open ↗
09/06/2026M00029373-I1Open ↗
09/04/2026M00471190-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/01/2026M00852243-I1Open ↗
09/01/2026M00852243-I1Open ↗
09/01/2026M00526637-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/18/2026M00499948-I1Open ↗
09/18/2026M00499948-I1Open ↗
09/02/2026M01072529-I1Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
08/16/2019140864955Open ↗
03/15/2018123387584Open ↗
03/15/2018123387593Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
03/15/2018123387584Open ↗
03/15/2018123387593Open ↗
01/23/2018123189272Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/16/2019140864955Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/16/2019140864955Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment30
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
08/08/2018123189272Open ↗
08/03/2018123189272Open ↗
07/03/2018123189272Open ↗
Showing 3 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
07/31/2025121831269Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes4
06/19/2019123753991Open ↗
04/16/2018123189272Open ↗
03/15/2018123387593Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
04/24/2018123189272Open ↗
01/23/2018123189272Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00195641-I1Open ↗
▸Environmental & Asbestos36
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
09/04/2026M00471190-I1Open ↗
09/04/2026M00471231-I1Open ↗
09/03/2026M00499823-I1Open ↗
Showing 3 of 21 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
06/19/2019123753991Open ↗
03/16/2018123218320Open ↗
03/15/2018123387593Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
06/19/2019123753991Open ↗
12/18/2018123189272Open ↗
03/15/2018123387593Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
01/29/2021123753991Open ↗
12/18/2018123189272Open ↗
05/11/2017123008164Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00499823-I1Open ↗
08/13/2026M00499881-I1Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/14/2022123197030Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/29/2021123753991Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
01/29/2021123753991Open ↗
01/28/2021103258573Open ↗
01/28/2021103258582Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
06/14/2022123197030Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
06/14/2022123197030Open ↗
▸Approvals, Objections & Sign-offs28
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
01/29/2021123753991Open ↗
01/28/2021103258573Open ↗
01/28/2021103258582Open ↗
Showing 3 of 15 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
05/06/2021123189272Open ↗
08/27/2018123189272Open ↗
08/14/2018123189272Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/06/2019123753991Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
06/14/2022123197030Open ↗
▸Cost, Insurance & Ownership33
▸BISCOST AFFIDAVIT32
01/29/2021123753991Open ↗
08/16/2019140864955Open ↗
06/19/2019123753991Open ↗
Showing 3 of 32 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/14/2022123197030Open ↗
▸Filing & Intake Forms50
▸BISEFILING COVER SHEET23
06/19/2019123753991Open ↗
03/16/2018123218320Open ↗
03/15/2018123387584Open ↗
Showing 3 of 23 on file for this type
▸BISBOROUGH INTAKE FORM17
02/19/2020123189272Open ↗
11/25/2019123189272Open ↗
08/30/2019123189272Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION8
07/29/2020140864955Open ↗
12/18/2019140864955Open ↗
03/08/2019123189272Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
08/16/2019140864955Open ↗
Showing 1 of 2 on file for this type
▸Other Documents15
▸DOB NOWDHCR Document6
09/03/2026M00499823-I1Open ↗
09/03/2026M00499948-I1Open ↗
09/03/2026M00499948-P1Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
12/18/2018123189272Open ↗
05/18/2018123218320Open ↗
Showing 2 of 4 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
09/10/2018123189272Open ↗
▸BISPLOT DIAGRAM1
01/23/2018123189272Open ↗
▸BISLOCAL LAW - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01072529-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01072529-I1Open ↗