← Back
BuildNYC
Elevator apt, miscellaneous
Grant (NYCHA)
1320 AMSTERDAM AVENUE · Morningside Heights · BIN 1084116
💬 Discuss this project
1955Year Built
21Stories
D9Building Class
R7-2Zoning
1,083,012 sfGross Floor Area
1,128Units
LL97 Covered23 Active Violations 17 unresolved · 6 paperwork only ▸FISP: SWARMP
Elevator apt, miscellaneous · Owner of record: NYC Housing Authority · 315,121 sf lot · 3.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofGrant Houses Bldg #5 Scaffold11p · 3 filings · 20 docs
CellarNew York City Housing Authority3p · 2 filings · 20 docs
Site & exteriorNew York City Housing Authority11p · 3 filings · 10 docs
Filed — no permit issuedRe-building Vertical Expansion Joint - One Side8p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority4707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZI Engineering106/12/2025
Liro Engineers102/28/2024
The Liro Group402/27/2024
Liro Architects + Planners102/22/2024
Gamill Engineering108/28/2023
Joel Phagoo P.E302/28/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design Approve Build1203/21/2026
Gamill Engineering203/21/2026
Kingston203/21/2026
Joel Phagoo P.E403/21/2026
Joel Phagoo P E403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Skyworx ContractingScaffold1007/08/2026
Neelam ConstructionScaffold403/21/2026
Gilston Electrical ContngElectrical103/22/2026
N.Y.C. Housing AuthorityElectrical103/21/2026
Thompson Electrical Main ServiceElectrical103/21/2026
Selectric Electrical Cont Co IElectrical103/21/2026
The Maintenance CoElectrical103/21/2026
YD Electrical ContElectrical103/21/2026
AL Foy ElectricElectrical103/21/2026
JCC ConstructionPlumbing107/08/2026
Raymor ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Joel Phagoo, PE2416108/12/2025
20/20 Inspections1471106/12/2025
RI Consulting Services8904110/21/2024
Gamill Engineering1773108/28/2023
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 10, sub-cycle B)
The filing window opened 02/21/2026. 1 Cycle 10 filing on record, latest 12/23/2025, status Swarmp
10/07/2026
Elevator Category 1 inspection report filed
06/08/2026
Signed off — Alteration
M01268420-I1
04/29/2026
Found cleaver brook cbw-400 dual fuel boiler, with exposed wiring, safety interlock switch not mounted properly, corroded water column, body drains…
ECB violation · open
04/29/2026
Found cleaver brook cbw-400 dual fuel boiler with interlock switch not properly mounted, corroded low water cut off, corroded blow down valve,…
ECB violation · open
175 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offZoria Housing08/18/2025
DOB NOWSuspended ScaffoldSigned-offZircon Group10/29/2024
DOB NOWPlumbingSigned-offJCC Construction09/14/2023
DOB NOWSidewalk ShedSigned-offSkyworx Contracting04/03/2020
DOB NOWSupported ScaffoldSigned-offSkyworx Contracting04/03/2020
DOB NOWConstruction FenceSigned-offNeelam Construction01/27/2020
DOB NOWSidewalk ShedSigned-offSkyworx Contracting04/08/2019
DOB NOWSupported ScaffoldSigned-offSkyworx Contracting04/05/2019
DOB NOWSupported ScaffoldSigned-offSkyworx Contracting03/01/2019
DOB NOWSidewalk ShedSigned-offSkyworx Contracting02/08/2019
DOB NOWConstruction FenceSigned-offNeelam Construction02/08/2019
BISPLISSUEDRichards P and H Co08/19/2025
BISPLISSUEDRichards P and H Co02/14/2024
BISPLISSUEDRichards P and H Co05/19/2022
BISPLISSUEDRichards P and H Co03/23/2021
BISOTISSUEDNeelam Construction03/27/2020
BISOTISSUEDNeelam Construction07/26/2019
BISPLISSUEDRichards P and H Co06/11/2019
BISOTISSUEDNeelam Construction05/02/2019
BISEQISSUEDAMC United11/18/2009
BISOTISSUEDBhumi Construction10/26/2009
BISEQISSUEDBhumi Construction10/06/2009
BISEQISSUEDAMC United04/20/2009
BISEQISSUEDSafeway Steel Products10/08/2003
BISEQISSUEDHI Tech Bridging10/17/2002
BISEQISSUEDSafeway Steel Products10/08/2002
BISOTISSUEDNap Construction Co12/19/2001
BISOTISSUEDNap Construction Co09/19/2000
BISOTISSUEDNap Construction Co07/28/2000
BISEQISSUEDAim Construction & Contracting03/06/2000
BISEQISSUEDAim Construction & Contracting09/03/1999
BISFSISSUEDDouglas Simmons07/15/1999
BISBLISSUEDR.D. Mortman & Company06/05/1995
1 project · most recent 02/28/2024
Heating Systems Ventilation Systems
FiledStatusContractorScope
02/28/2024——Heating Systems, Ventilation Systems
2 projects · most recent 02/28/2024
Water/Sanitary Gas
FiledStatusContractorScope
02/28/2024——Gas, Water/Sanitary
08/28/2023Signed-offJCC ConstructionWater/Sanitary
5 projects · most recent 01/11/2023
General Wiring
FiledStatusContractorScope
01/11/2023CompleteGilston Electrical ContngGeneral Wiring
12/02/2020CompleteWebsite Electric—
02/11/2019CompleteAmin Electrical—
02/06/2019CompleteAmin Electrical—
06/14/2018CompleteMac Fhionnghaile & SonsGeneral Wiring
1 project · most recent 02/28/2024
Steel Concrete
FiledStatusContractorScope
02/28/2024——Steel, Concrete
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
06/12/2025Tenant Protection Plan ComplianceJACOB HAASspecial
06/12/2025Structural Stability – Alterations of existing buildingsJACOB HAASspecial
06/12/2025MasonryJACOB HAASspecial
06/12/2025Post-installed AnchorsJACOB HAASspecial
06/12/2025FinalJACOB HAASprogress
10/16/2024Post-installed AnchorsMd Istiaque Hasanspecial
10/16/2024Alternative Materials - OTCR Buildings Bulletin NumberMd Istiaque Hasanspecial
03/27/2024High-Pressure Fuel-Gas Piping (Welding)—special
02/22/2024Permanent certificate—energy_progress
02/22/2024Tenant Protection Plan Compliance—special
02/22/2024Maintenance information—energy_progress
02/22/2024Tenant Protection Plan Compliance—special
02/22/2024Heating Systems—special
02/14/2024HVAC-R and service water heating equipment—energy_progress
02/14/2024HVAC-R and service water heating system controls—energy_progress
02/13/2024Post-installed Anchors—special
02/13/2024Tenant Protection Plan Compliance—special
02/13/2024Post-installed Anchors—special
02/07/2024HVAC-R and service water piping design and insulation—energy_progress
02/07/2024Heating Systems—special
02/07/2024Chimneys and vents—special
02/07/2024Fire-Resistant Penetrations and Joints—special
02/07/2024Tenant Protection Plan Compliance—special
02/07/2024Energy Code Compliance Inspections—progress
02/07/2024HVAC-R and service water heating equipment—energy_progress
Latest 25 of 46.
171 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account