1901Year Built
2Stories
B2Building Class
R7-1Zoning
2,032 sfGross Floor Area
2Units
Rent Stabilized6 Open Violations 5 unresolved · 1 paperwork only ▸
Two family frame · 2,000 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/31/2020$700K—— → —$344/sf building
01/03/2020$395K—Private party → Private party$194/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE A. SANTOS P.E.P.C303/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOP DOG PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292303/10/2022
Building Lifecycle
All (44)Filed (3)Permit Issued (1)Signed Off (1)Violation (6)Inspection (3)Objection (14)Special Inspection (16)
06/01/2026
Violation issued (HPD, open)
B
10/15/2025
Violation issued (HPD, open)
B
10/15/2025
Violation issued (HPD, open)
B
09/26/2025
Violation issued (HPD, open)
B
09/26/2025
Violation issued (HPD, open)
B
04/01/2024
Violation issued (ECB, open)
Construction
03/28/2022
Signed off — Alteration
PROPOSE TO INSTALL PLUMBING FIXTURES AS PER PLANS SUBMITTED HEREWITH. THERE SHALL BE NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS UNDER THIS APPLICATION. RESTORING GAS SERVICE AT FIRST FLOOR.
X00459125-I1
03/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
03/17/2022
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
03/17/2022
Special inspection requirement — Energy Code Compliance
Jose Santos
03/17/2022
Special inspection requirement — Metering
Jose Santos
03/17/2022
Special inspection requirement — HVAC-R and service water heating equipment
Jose Santos
03/17/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Jose Santos
03/17/2022
Special inspection requirement — Maintenance information
Jose Santos
03/17/2022
Special inspection requirement — HVAC-R and service water heating system controls
Jose Santos
03/10/2022
Filed — Alteration
PROPOSE TO INSTALL PLUMBING FIXTURES AS PER PLANS SUBMITTED HEREWITH. THERE SHALL BE NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS UNDER THIS APPLICATION. RESTORING GAS SERVICE AT FIRST FLOOR.
X00459125-P2
03/03/2022
Objection raised — Admin
03/03/2022
Objection resolved — Addressed
02/24/2022
Objection resolved — Addressed
02/01/2022
Objection raised — Scope
01/21/2022
Filed — Alteration
PROPOSE TO INSTALL PLUMBING FIXTURES AS PER PLANS SUBMITTED HEREWITH. THERE SHALL BE NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS UNDER THIS APPLICATION. RESTORING GAS SERVICE AT FIRST FLOOR.
X00459125-P1
01/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
01/14/2022
Special inspection requirement — Energy Code Compliance
Jose Santos
01/14/2022
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
01/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
Jose Santos
01/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
Jose Santos
01/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Jose Santos
01/14/2022
Special inspection requirement — Maintenance information
Jose Santos
01/14/2022
Special inspection requirement — Metering
Jose Santos
11/04/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/22/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/15/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/15/2021
Permit issued — Plumbing
X00459125-I1-PL
02/17/2021
Objection raised — Other
02/17/2021
Objection resolved — Addressed
02/02/2021
Objection raised — Scope
02/02/2021
Objection resolved — Addressed
02/02/2021
Objection raised — Fire_Protection
02/02/2021
Objection resolved — Addressed
02/02/2021
Objection raised — Fire_Protection
02/02/2021
Objection resolved — Addressed
02/02/2021
Objection raised — Inspections
02/02/2021
Objection resolved — Addressed
01/26/2021
Filed — Alteration
PROPOSE TO INSTALL PLUMBING FIXTURES AS PER PLANS SUBMITTED HEREWITH. THERE SHALL BE NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS UNDER THIS APPLICATION. RESTORING GAS SERVICE AT FIRST FLOOR.
X00459125-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP07/15/2021
2 projects · most recent 11/01/2020
General Wiring
FiledStatusContractorScope
11/01/2020CompleteVOLTRON ELECTRIC LLCGeneral Wiring
06/24/2020CompleteVOLTRON ELECTRIC LLC3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/04/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/22/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/15/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
03/17/2022Fire-Resistant Penetrations and JointsJose Santosspecial
03/17/2022Energy Code Compliance InspectionsJose Santosprogress
03/17/2022Energy Code ComplianceJose Santosprogress
03/17/2022MeteringJose Santosenergy_progress
03/17/2022HVAC-R and service water heating equipmentJose Santosenergy_progress
03/17/2022HVAC-R and service water piping design and insulationJose Santosenergy_progress
03/17/2022Maintenance informationJose Santosenergy_progress
03/17/2022HVAC-R and service water heating system controlsJose Santosenergy_progress
01/14/2022Fire-Resistant Penetrations and JointsJose Santosspecial
01/14/2022Energy Code ComplianceJose Santosprogress
01/14/2022Energy Code Compliance InspectionsJose Santosprogress
01/14/2022HVAC-R and service water heating system controlsJose Santosenergy_progress
01/14/2022HVAC-R and service water heating equipmentJose Santosenergy_progress
01/14/2022HVAC-R and service water piping design and insulationJose Santosenergy_progress
01/14/2022Maintenance informationJose Santosenergy_progress
01/14/2022MeteringJose Santosenergy_progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing3
08/25/2026X00459125-P2Request digital key ↗
08/15/2026X00459125-P1Request digital key ↗
08/15/2026X00459125-I1Request digital key ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature14
08/28/2026X00459125-P1Open ↗
08/28/2026X00459125-P1Open ↗
08/28/2026X00459125-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026X00459125-I1Open ↗
08/25/2026X00459125-P1Open ↗
08/13/2026X00459125-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026X00459125-P1Open ↗
08/28/2026X00459125-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan3
08/15/2026X00459125-P1Open ↗
08/15/2026X00459125-I1Open ↗
08/13/2026X00459125-P2Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/15/2026X00459125-P1Open ↗
08/15/2026X00459125-I1Open ↗
08/13/2026X00459125-P2Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00459125-I1Open ↗