← Back
BuildNYC
Elevator apt, semi-fireproof without stores
1323 CHISHOLM STREET
BRONX · BIN 2130526
💬 Discuss this project
2020Year Built
7Stories
D1Building Class
R7-1Zoning
18,965 sfGross Floor Area
23Units
Rent Stabilized21 Active Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 1321-1323 Chisholm · 4,600 sf lot · 4.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofThe Vaja Group49p · 4 filings · 20 docs
BulkheadThe Vaja Group3p · 2 filings · 20 docs
Floor 7The Vaja Group51p · 4 filings · 20 docs
Floor 6The Vaja Group49p · 4 filings · 20 docs
Floor 5The Vaja Group49p · 4 filings · 20 docs
Floor 4The Vaja Group49p · 4 filings · 20 docs
Floor 3The Vaja Group49p · 4 filings · 20 docs
Floor 2The Vaja Group51p · 4 filings · 20 docs
Floor 1The Vaja Group52p · 5 filings · 20 docs
CellarThe Vaja Group2p · 1 filing · 9 docs
Site & exteriorThe Vaja Group22p · 4 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HMF1607/08/2026
1321-1323 Chisholm St803/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediting 4 U803/21/2026
Green Studio603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
City Wide Builders GroupGeneral Contractor707/08/2026
City Wide Builders Groupspecialty_contractor303/21/2026
Star Electrical ContractorsElectrical103/22/2026
Prime Piping & HeatingFire Protection107/08/2026
Mohammad AslamGeneral Contractor103/21/2026
SP Plumbing and HeatingPlumbing211/30/2017
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Big Apple Group NY A Rma9168709/02/2021
Building Lifecycle
06/01/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE AT PUBLIC HALL, 1st STORY
HPD violation · closed
06/01/2026
§ 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE REAR YARD , 1st STORY
HPD violation · closed
06/01/2026
§ 27-2021 ADM code provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and…
HPD violation · closed
05/05/2026
Elevator Category 1 inspection report filed
05/05/2026
Elevator Category 5 inspection report filed
117 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offCity Wide Builders Group01/21/2021
DOB NOWMechanical SystemsSigned-offCity Wide Builders Group11/20/2020
DOB NOWSprinklersSigned-offAmb Mechanical11/18/2020
DOB NOWStructuralSigned-offCity Wide Builders Group11/17/2020
BIS—ISSUEDCity Wide Builders Group03/16/2021
BIS—ISSUEDCity Wide Builders Group02/23/2021
BIS—ISSUEDCity Wide Builders Group02/23/2021
BIS—ISSUEDCity Wide Builders Group09/25/2020
BIS—ISSUEDCity Wide Builders Group09/25/2020
BIS—ISSUEDCity Wide Builders Group09/17/2020
BISPLISSUEDSP Plumbing and Heating11/30/2017
BISPLISSUEDSP Plumbing and Heating07/14/2015
BISOTISSUEDMohammad Aslam03/11/2015
3 projects · most recent 05/13/2021
General Wiring
FiledStatusContractorScope
05/13/2021CompleteAccurate ElectricalGeneral Wiring
10/22/2020CompleteStar Electrical Contractors—
08/03/2020CompleteAccurate Electrical—
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
09/23/2021Maintenance informationSoorjbally Harilallenergy_progress
09/23/2021HVAC and service water heating system controls Soorjbally Harilallenergy_progress
09/23/2021Mechanical SystemsSOORJBALLY HARILALLspecial
09/23/2021Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
09/23/2021Heating SystemsSOORJBALLY HARILALLspecial
09/23/2021Energy Code Compliance InspectionsSoorjbally Harilallprogress
09/23/2021Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
09/23/2021FinalSoorjbally Harilallprogress
09/23/2021Shutoff dampersSoorjbally Harilallenergy_progress
09/23/2021HVAC insulation and sealing Soorjbally Harilallenergy_progress
09/23/2021HVAC and service water heating equipment Soorjbally Harilallenergy_progress
06/21/2021HVAC insulation and sealing Soorjbally Harilallenergy_progress
06/21/2021HVAC and service water heating system controls Soorjbally Harilallenergy_progress
06/21/2021Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
06/21/2021Heating SystemsSOORJBALLY HARILALLspecial
06/21/2021Mechanical SystemsSOORJBALLY HARILALLspecial
06/21/2021Energy Code Compliance InspectionsSoorjbally Harilallprogress
06/21/2021FinalSoorjbally Harilallprogress
06/21/2021Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
06/21/2021Maintenance informationSoorjbally Harilallenergy_progress
06/21/2021Shutoff dampersSoorjbally Harilallenergy_progress
06/21/2021HVAC and service water heating equipment Soorjbally Harilallenergy_progress
06/01/2021Post-installed AnchorsSOORJBALLY HARILALLspecial
06/01/2021Sprinkler SystemsSOORJBALLY HARILALLspecial
06/01/2021Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
Latest 25 of 36.
187 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account