Department of Sanitation
1323 WEST SERVICE ROAD
STATEN ISLAND · BIN 5130986
💬 Discuss this project
1969Year Built
2Stories
Y6Building Class
M3-1Zoning
80,875 sfGross Floor Area
71Units
0 Open ViolationsFDNY Report ↗
Department of Sanitation · Owner of record: NYC DEPARTMENT OF SANITATION · 12,369,565 sf lot · 0.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction99p · 7 filings · 20 docs
Floor 2Under Construction100p · 8 filings · 20 docs
Floor 1Under Construction97p · 9 filings · 20 docs
CellarUnder Construction57p · 3 filings · 20 docs
Site & exterior18p · 5 filings · 20 docs
Filed — no permit issued36p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CITY OF NEW YORK DDC2903/21/2026
CITY OF NEW YORK DDC BY GLENN BRUE907/08/2026
N Y C DEPT OF DESIGN CONST803/21/2026
NYC DEPT DESIGN CONSTRUCTION603/21/2026
NYC DEPARTMENT OF SANITATION603/21/2026
DEPARTMENT OF DESIGN & CONSTRUCTION407/08/2026
DDC403/21/2026
DCAS203/21/2026
DSNY103/21/2026
DOC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
W J PROFESSIONAL EXPEDITING8503/21/2026
JAM CONSULTANTS, INC.803/21/2026
P WOLFE CONSULTANTS203/21/2026
DESIGN CONCEPTS103/21/2026
BERZAK SCHOEN CONSULTANTS LTD.203/21/2026
WALTER T. GORMAN, PE, PC103/21/2026
AK CONSULTING SERVICES403/21/2026
WALTER T GORMAN PE103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WELKIN MECHANICAL, LLCGeneral Contractor2407/08/2026
GRINNELL LLCFire Protection1907/08/2026
PRISMATIC DEVELOPMENT CORGeneral Contractor1604/09/2026
PERFETTO CONTRACTING CO,IGeneral Contractor1507/08/2026
WMP PLUMBING LLCPlumbing1307/08/2026
DELRIC CONSTRUCTION CO INGeneral Contractor1207/08/2026
AURORA CONTRACTORS INCGeneral Contractor807/08/2026
PHILCO PLUMBING CORPPlumbing507/08/2026
CHAMP PLUMBING & HTG CORPPlumbing207/08/2026
TULLY CONSTRUCTION CO INCGeneral Contractor107/08/2026
CURCIO COSIMOElectrical103/21/2026
WM PLUMBINGPlumbing108/08/2026
E H FIRE SUPPRESSION CO IFire Protection107/08/2026
COSIMO CURCIOElectrical103/21/2026
MONTI, WILLIAMElectrical103/21/2026
HATZEL AND BUEHLER, INCElectrical103/22/2026
THE FRANKLIN COMANY CONT*General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS1062401/20/2026
DISTINCT ENGINEERING SOLU2641106/06/2024
Building Lifecycle
All (296)Filed (48)Permit Issued (80)Signed Off (6)Violation (40)Inspection (22)Objection (70)Special Inspection (30)
08/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/07/2026
Permit issued — Plumbing
S00310343-I1-PL
06/23/2026
Filed — Alteration
FILING HEREWITH CONSTRUCTION OF WASTEWATER EFFLUENT MONITORING EQUIPMENT PAD AT FRESH KILLS LANDFILL. THIS WORK IS ACCESSORY TO EXISTING GARAGE BUILDING ON LOT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01414487-I1
06/09/2026
Special inspection requirement — Final
06/09/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
06/09/2026
Special inspection requirement — Concrete - Cast-In-Place
06/09/2026
Special inspection requirement — Subgrade Inspections
06/09/2026
Special inspection requirement — Footing and Foundation
06/09/2026
Special inspection requirement — Post-installed Anchors
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/03/2026
Violation issued (FDNY_ORDER, closed)
03/26/2026
Violation issued (FDNY_ORDER, closed)
03/23/2026
Violation issued (FDNY_NOV, closed)
03/02/2026
Violation issued (FDNY_NOV, closed)
02/17/2026
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
02/17/2026
Special inspection requirement — Electrical energy consumption
GEORGE GHEBRYAL
02/17/2026
Special inspection requirement — HVAC and service water heating equipment
GEORGE GHEBRYAL
02/17/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
02/17/2026
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
02/17/2026
Special inspection requirement — HVAC insulation and sealing
GEORGE GHEBRYAL
02/17/2026
Special inspection requirement — HVAC and service water heating system controls
GEORGE GHEBRYAL
02/17/2026
Special inspection requirement — Electrical motors
GEORGE GHEBRYAL
02/11/2026
Violation issued (FDNY_NOV, closed)
02/11/2026
Objection resolved — Addressed
02/05/2026
Objection raised — Scope
01/20/2026
Filed — Alteration
Installation of Emergency Generator on 2nd Floor in conjunction with New Building Job Number 510113315
S00413175-P3
01/20/2026
Filed — Alteration
Installation of Mechanical Systems in conjunction with New Building application # 510113315.
S00313952-P3
01/20/2026
Special inspection requirement — Electrical motors
GEORGE GHEBRYAL
01/20/2026
Special inspection requirement — HVAC and service water heating system controls
GEORGE GHEBRYAL
01/20/2026
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
01/20/2026
Special inspection requirement — Electrical energy consumption
GEORGE GHEBRYAL
01/20/2026
Special inspection requirement — HVAC insulation and sealing
GEORGE GHEBRYAL
01/20/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
01/20/2026
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
01/20/2026
Special inspection requirement — HVAC and service water heating equipment
GEORGE GHEBRYAL
01/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/06/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
GEORGE GHEBRYAL
01/06/2026
Special inspection requirement — HVAC and service water heating equipment
GEORGE GHEBRYAL
01/06/2026
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
01/06/2026
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
01/06/2026
Special inspection requirement — Electrical motors
GEORGE GHEBRYAL
01/06/2026
Special inspection requirement — Heating Systems
GEORGE GHEBRYAL
01/06/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
01/06/2026
Special inspection requirement — Shutoff dampers
GEORGE GHEBRYAL
12/17/2025
Permit issued — Mechanical Systems
S00413175-I1-MS
12/16/2025
Permit issued — Mechanical Systems
S00313952-I1-MS
12/16/2025
Violation issued (FDNY_ORDER, closed)
11/26/2025
Permit issued — Plumbing
S00310343-I1-PL
11/26/2025
Permit issued — Plumbing
S00355434-I1-PL
11/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2025
Signed off — Alteration
FILING TO REMOVE EXISTING FILL PORT SPILL CONTAINER OF ONE(1)4,000-GAL RENEWABLE DIESEL & ONE(1) 4,000-GAL GASOLINE USTS. FURNISH & INSTALL DOUBLE WALL FILL PORT SPILL CONTAINERS WITH IEM SENSORS, HEAVY-DUTY MANHOLE COVERS, ALL ACCESSORIES & APPURTENANCES
S01019078-I1
11/05/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/04/2025
Signed off — Alteration
Construction fence at A-3, A-4 and A-5 sites for DSNY New Buildings.
S00490341-I1
11/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/20/2025
Permit issued — General Construction
S00888210-I1-GC
10/16/2025
Violation issued (FDNY_NOV, closed)
10/15/2025
Violation issued (FDNY_ORDER, closed)
10/14/2025
Permit issued — Plumbing
S00355434-I1-PL
10/10/2025
Permit issued — Plumbing
S00310343-I1-PL
Latest 60 of 296 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedWM PLUMBING08/07/2026
DOB NOWMechanical SystemsSigned-offWELKIN MECHANICAL, LLC12/17/2025
DOB NOWMechanical SystemsSigned-offWELKIN MECHANICAL, LLC12/16/2025
DOB NOWPlumbingPermit IssuedWMP PLUMBING LLC11/26/2025
DOB NOWPlumbingSigned-offWMP PLUMBING LLC11/26/2025
DOB NOWGeneral ConstructionSigned-offPRISMATIC DEVELOPMENT COR10/20/2025
DOB NOWPlumbingSigned-offWMP PLUMBING LLC10/14/2025
DOB NOWPlumbingPermit IssuedWMP PLUMBING LLC10/10/2025
DOB NOWStandpipeSigned-offGRINNELL LLC07/09/2025
DOB NOWStandpipeSigned-offGRINNELL LLC07/09/2025
DOB NOWStandpipeSigned-offGRINNELL LLC07/09/2025
DOB NOWPlumbingSigned-offALL ABOUT P & H OF NY INC06/09/2025
DOB NOWGeneral ConstructionSigned-offTHE FRANKLIN COMANY CONT*05/19/2025
DOB NOWMechanical SystemsSigned-offWELKIN MECHANICAL, LLC03/07/2025
DOB NOWMechanical SystemsSigned-offWELKIN MECHANICAL, LLC03/07/2025
DOB NOWMechanical SystemsSigned-offWELKIN MECHANICAL, LLC03/07/2025
DOB NOWConstruction FenceSigned-offYABOO FENCE CO INC02/28/2025
DOB NOWStandpipeSigned-offGRINNELL LLC01/31/2025
DOB NOWStandpipeSigned-offGRINNELL LLC01/30/2025
DOB NOWGeneral ConstructionSigned-offPRISMATIC DEVELOPMENT COR01/09/2025
DOB NOWSprinklersSigned-offGRINNELL LLC12/16/2024
DOB NOWBoiler EquipmentSigned-offCHAMP PLUMBING & HTG CORP12/12/2024
DOB NOWPlumbingPermit IssuedWMP PLUMBING LLC11/08/2024
DOB NOWPlumbingSigned-offWMP PLUMBING LLC11/08/2024
DOB NOWStandpipeSigned-offGRINNELL LLC10/18/2024
DOB NOWSprinklersSigned-offGRINNELL LLC10/17/2024
DOB NOWSprinklersSigned-offGRINNELL LLC10/11/2024
DOB NOWPlumbingSigned-offALL ABOUT P & H OF NY INC09/10/2024
DOB NOWStandpipeSigned-offGRINNELL LLC07/12/2024
DOB NOWSprinklersSigned-offGRINNELL LLC07/12/2024
DOB NOWStandpipeSigned-offYA MALLIKU INC06/18/2024
DOB NOWSidewalk ShedSigned-offDELRIC CONSTRUCTION CO IN04/29/2024
DOB NOWConstruction FenceSigned-offDELRIC CONSTRUCTION CO IN04/22/2024
DOB NOWConstruction FenceSigned-offYABOO FENCE CO INC04/04/2024
DOB NOWPlumbingSigned-offALL ABOUT P & H OF NY INC03/13/2024
DOB NOWMechanical SystemsSigned-offWELKIN MECHANICAL, LLC03/07/2024
DOB NOWMechanical SystemsSigned-offWELKIN MECHANICAL, LLC03/07/2024
DOB NOWMechanical SystemsSigned-offWELKIN MECHANICAL, LLC03/07/2024
DOB NOWPlumbingSigned-offWMP PLUMBING LLC02/06/2024
DOB NOWPlumbingPermit IssuedWMP PLUMBING LLC12/28/2023
+ 60 more permits on file
4 projects · most recent 01/20/2026
Generators Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/20/2026Signed-offWELKIN MECHANICAL, LLCGenerators
Generators
Kohler 100REZK 100 CFM · Generator ×3
01/20/2026Signed-offWELKIN MECHANICAL, LLCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin AM168BXVGJH/AA 158,300 CFM ×4
Samsung AC024JXADCH/AA, AC024JXADCH/AA & AC024JXADCH/AA 23,800 CFM · Vrf Indoor ×6
AM072BXVGJR/AA, AM120BXVGJR/AA & AM072BXVGJR/AA 65,400 CFM · Vrf Outdoor ×6
AM072BXVGJH/AA 90,300 CFM · Vrf Outdoor ×4
AM072BXVGJH/AA & AM072BXVGJH/AA 67,600 CFM · Vrf Outdoor ×4
AM384BXVGJR/AA & AM360BXVGJR/AA 393,800 CFM · Vrf Outdoor ×4
M144BXVGJH/AA 136,100 CFM · Vrf Outdoor ×4
AC024JXADCH/AA 11,000 CFM · Vrf Indoor ×2
AM192BXVGJR/AA 180,000 CFM · Vrf Outdoor ×2
Heating
Modine ×54
Airedale WSC165SB01SA 130,900 BTU · Unit Heater ×44
WSC 86SB01SA 60,200 CFM · Unit Heater ×10
Ventilation
Xetex ×20
Renewaire HE3XIN 2,225 CFM · Erv ×8
HE1XJIN 550 CFM · Erv ×2
HE2XIN 1,236 CFM · Erv ×2
HE2XRT 640 CFM · Erv ×2
HE3XRT 2,000 CFM · Erv ×2
Petra PAH-320 26,700 CFM ×12
PPH-115 22,500 CFM · Rooftop Unit ×4
PAH-180 17,000 CFM ×2
PAH-40 3,600 CFM ×2
10/24/2022Signed-offWELKIN MECHANICAL, LLCAir Conditioning Systems
Cooling
Amana khs12a33a 375 CFM ×4
Friedrich KHVS12B33A 375 CFM · Ptac ×1
11/20/2020——Generators
Generators
Cummins CN500 500 CFM · Generator ×5
2 projects · most recent 08/28/2025
FiledStatusContractorScope
08/28/2025Signed-offGRINNELL LLC1,770 heads, 2 outlets
10/13/2020——511 heads
5 projects · most recent 09/09/2025
Storm Water/Sanitary Gas
FiledStatusContractorScope
09/09/2025Signed-offWMP PLUMBING LLCGas
08/28/2025———
08/26/2025Signed-offPHILCO PLUMBING CORPStorm, Water/Sanitary
08/21/2025Permit IssuedWM PLUMBINGGas, Storm, Water/Sanitary
09/07/2022Signed-offWMP PLUMBING LLCStorm, Water/Sanitary
13 projects · most recent 12/02/2025
General Wiring
FiledStatusContractorScope
12/02/2025CompleteJAM ELECTRICAL CORP—
12/02/2025CancelledJAM ELECTRICAL CORP—
09/24/2024CompleteTRU-VAL ELECTRIC CORP.General Wiring
06/26/2024CompleteTOTAL ELEC'L CONST. CO IN—
06/26/2024CompleteFIVE STAR ELECTRIC CORP.1 meters, 1 new_meters
03/07/2024CompleteHATZEL AND BUEHLER, INCGeneral Wiring
01/23/2024CompleteHATZEL AND BUEHLER, INC—
05/11/2023CompleteHATZEL AND BUEHLER, INC—
05/05/2023CompleteTRU-VAL ELECTRIC CORP.—
04/18/2023CompleteHIGH QUALITY ELECTRIC OF—
12/02/2021CompleteWINDSOR ELEC CONT'G INC.General Wiring
05/13/2021CompleteFIVE STAR ELECTRIC CORP.General Wiring
05/13/2021CompleteFIVE STAR ELECTRIC CORP.General Wiring
2 projects · most recent 06/23/2026
Concrete Steel Masonry
FiledStatusContractorScope
06/23/2026——Concrete
12/15/2020——Steel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
08/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/05/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/24/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/17/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/07/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/24/2024Fail-Final PL - UndergroundFailView ↗
04/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/25/2024Fail-Final PL - UndergroundFailView ↗
04/12/2023Pass-Final PL - UndergroundPassView ↗
02/07/2023Pass-Final PL - UndergroundPassView ↗
10/31/2022Pass-Final PL - UndergroundPassView ↗
10/21/2022Pass-Final PL - UndergroundPassView ↗
01/20/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/30/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/30/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/30/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 101
DateRequirementInspectorRole
06/09/2026Final—progress
06/09/2026Footing and Foundation—progress
06/09/2026Subsurface Conditions – Fill Placement & In-Place Density—special
06/09/2026Subgrade Inspections—special
06/09/2026Post-installed Anchors—special
06/09/2026Concrete - Cast-In-Place—special
02/17/2026Maintenance informationGEORGE GHEBRYALenergy_progress
02/17/2026HVAC insulation and sealing GEORGE GHEBRYALenergy_progress
02/17/2026Electrical energy consumptionGEORGE GHEBRYALenergy_progress
02/17/2026Electrical motorsGEORGE GHEBRYALenergy_progress
02/17/2026Mechanical SystemsGEORGE GHEBRYALspecial
02/17/2026FinalGEORGE GHEBRYALprogress
02/17/2026HVAC and service water heating system controls GEORGE GHEBRYALenergy_progress
02/17/2026HVAC and service water heating equipment GEORGE GHEBRYALenergy_progress
01/20/2026HVAC and service water heating system controls GEORGE GHEBRYALenergy_progress
01/20/2026Electrical motorsGEORGE GHEBRYALenergy_progress
01/20/2026Mechanical SystemsGEORGE GHEBRYALspecial
01/20/2026FinalGEORGE GHEBRYALprogress
01/20/2026HVAC insulation and sealing GEORGE GHEBRYALenergy_progress
01/20/2026Electrical energy consumptionGEORGE GHEBRYALenergy_progress
01/20/2026Maintenance informationGEORGE GHEBRYALenergy_progress
01/20/2026HVAC and service water heating equipment GEORGE GHEBRYALenergy_progress
01/06/2026HVAC insulation and sealing GEORGE GHEBRYALenergy_progress
01/06/2026Emergency and Standby Power Systems (Generator)GEORGE GHEBRYALspecial
01/06/2026Heating SystemsGEORGE GHEBRYALspecial
Latest 25 of 101.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
DSNYOther—
Project S00283487 Alteration · Approved · 02/05/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 918 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch11
08/25/2026S00645470-I1Request digital key ↗
08/24/2026S00490341-P4Request digital key ↗
08/24/2026S00490341-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
08/26/2026S00283487-I1Request digital key ↗
08/25/2026S00355434-I1Request digital key ↗
08/20/2026S00313185-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
08/23/2026S00310525-P2Request digital key ↗
08/23/2026S00310525-I1Request digital key ↗
08/15/2026S00310525-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
08/25/2026S00355590-I1Request digital key ↗
08/23/2026S00394101-I1Request digital key ↗
08/23/2026S00394101-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Standpipe4
08/23/2026S00310525-P2Request digital key ↗
08/23/2026S00310525-I1Request digital key ↗
08/15/2026S00310525-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment4
08/23/2026S00413171-P2Request digital key ↗
08/23/2026S00413171-P1Request digital key ↗
08/23/2026S00413171-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
08/25/2026S00473753-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/15/2026S00353247-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026S00355602-I1Request digital key ↗
▸Applications & Permits143
▸BISPLAN / WORK APPROVAL APPLICATION93
09/03/2025520327726Open ↗
06/30/2025510114029Open ↗
06/09/2025510113315Open ↗
Showing 3 of 93 on file for this type
▸BISWORK PERMIT APPLICATION48
12/21/2023520354189Open ↗
12/21/2023520354189Open ↗
12/21/2023520354189Open ↗
Showing 3 of 48 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
07/25/2025510113315Open ↗
07/23/2025510114029Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP2
09/24/2025510114029Open ↗
09/24/2025510113315Open ↗
▸Seals & Professional Certifications170
▸DOB NOWProgress Inspector Seal & Signature49
09/23/2026S00413171-I1Open ↗
09/23/2026S00413171-I1Open ↗
09/23/2026S00413171-I1Open ↗
Showing 3 of 49 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION44
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 44 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature41
08/26/2026S00283487-I1Open ↗
08/25/2026S00355608-I1Open ↗
08/25/2026S00355434-I1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/23/2026S00413171-I1Open ↗
09/18/2026S00420762-I1Open ↗
09/01/2026S00413175-P1Open ↗
Showing 3 of 26 on file for this type
▸BISAPPLICANT OWNER SIGNATURE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment30
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING8
05/17/2024520327726Open ↗
05/10/2024520327726Open ↗
02/05/2024520327726Open ↗
Showing 3 of 8 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BIS* SEWER CONNECTION: DEP SD1 & SD22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
02/05/2026510113315Open ↗
03/28/2024520354189Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
02/26/2024520354189Open ↗
02/26/2024520354189Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B1
04/23/2025520327726Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
06/03/2021510113315Open ↗
04/13/2021510114029Open ↗
Showing 2 of 3 on file for this type
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
08/14/2025510114029Open ↗
06/05/2025510113315Open ↗
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/26/2026S00283487-I1Open ↗
08/25/2026S00355434-P1Open ↗
08/25/2026S00355434-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
04/28/2023540175120Open ↗
Showing 1 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
09/14/2021520327726Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026S01059489-I1Open ↗
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
09/10/2025520327726Open ↗
06/10/2025520327726Open ↗
02/21/2023540175120Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
06/10/2025520327726Open ↗
Showing 1 of 2 on file for this type
▸BISEXTERIOR LIGHTING POWER1
11/21/2025510113315Open ↗
▸Inspections & Test Reports72
▸BISTECHNICAL REPORT: RESPONSIBILITY42
01/13/2026520327726Open ↗
11/21/2025510113315Open ↗
09/10/2025520327726Open ↗
Showing 3 of 42 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX6
10/07/2021510113315Open ↗
10/07/2021510113315Open ↗
10/07/2021510113315Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCONCRETE - CAST-IN-PLACE3
08/14/2025510114029Open ↗
06/05/2025510113315Open ↗
06/08/2023540175120Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION2
08/14/2025510114029Open ↗
06/05/2025510113315Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY2
08/14/2025510114029Open ↗
06/05/2025510113315Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT2
05/05/2021510113315Open ↗
05/05/2021510114029Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP2
08/14/2025510114029Open ↗
06/05/2025510113315Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT2
02/05/2026510113315Open ↗
01/26/2026510114029Open ↗
▸DOB NOWHydrant Flow Test Letter1
08/14/2026S00355608-I1Open ↗
▸Approvals, Objections & Sign-offs169
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)52
08/13/2026S00283487-I1Open ↗
08/13/2026S00490341-P2Open ↗
08/13/2026S00490341-I1Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter42
08/26/2026S00283487-I1Open ↗
08/25/2026S00355590-I1Open ↗
08/25/2026S00420762-P1Open ↗
Showing 3 of 42 on file for this type
▸BISADMINISTRATIVE OBJECTIONS18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION16
06/15/2023540175120Open ↗
05/11/2022510113315Open ↗
05/11/2022510113315Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
06/26/2024520354189Open ↗
Showing 1 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
10/07/2022520399863Open ↗
05/19/2022510114029Open ↗
04/06/2021510113315Open ↗
Showing 3 of 11 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSUPERSEDING LETTER5
12/21/2023520354189Open ↗
12/21/2023520354189Open ↗
12/21/2023520354189Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/13/2026S01019078-I1Open ↗
08/13/2026S01059489-I1Open ↗
08/13/2026S00645470-I1Open ↗
▸BISNYS DEC TIDAL WETLANDS LETTER OF APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
06/30/2025510113315Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/21/2026S01059489-I1Open ↗
▸Cost, Insurance & Ownership37
▸BISCOST AFFIDAVIT35
12/02/2021520327726Open ↗
Showing 1 of 35 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
06/03/2021510113315Open ↗
05/11/2021510114029Open ↗
▸Filing & Intake Forms100
▸BISADDITIONAL INFORMATION58
01/22/2026510113315Open ↗
09/22/2025520327726Open ↗
07/30/2025510113315Open ↗
Showing 3 of 58 on file for this type
▸BISEFILING COVER SHEET20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISBOROUGH INTAKE FORM17
12/21/2023520354189Open ↗
12/21/2023520354189Open ↗
12/21/2023520354189Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Other Documents57
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION27
02/21/2023540175120Open ↗
05/05/2021510113315Open ↗
Showing 2 of 27 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROOF OF FEE EXEMPTION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEXHIBIT III2
04/13/2021510114029Open ↗
04/09/2021510113315Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
11/07/2025540164855Open ↗
▸DOB NOWHydraulic Calculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type