← Back
Three families
1328 80 STREET
BROOKLYN · Dyker Heights · BIN 3163048
💬 Discuss this project
1935Year Built
2Stories
C0Building Class
R4-1Zoning
1,748 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · 2,350 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 21p · 1 filing · 5 docs
Floor 13p · 1 filing · 12 docs
Cellar1p · 1 filing · 5 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/04/2025$1.5M—— → —$870/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG, ARCHITECT406/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGH QUALITY 338803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGH QUALITY CONSTRUCTIONGeneral Contractor207/08/2026
A.C. MORGAN ELECTRICElectrical103/22/2026
S & L PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244306/26/2025
SQ. ARCH, LLC4802103/07/2025
Building Lifecycle
All (31)Filed (4)Permit Issued (3)Signed Off (2)Violation (1)Inspection (3)Special Inspection (18)
08/12/2025
Violation issued (ECB, closed)
Unknown
07/29/2025
Signed off — Alteration
GENERAL RENOVATION OF 2-FAMILY BUILDING WITH REMOVING PARTITION, REPAIRING CEILING, NEW FLOOR TILES, PARTITION, DOOR, REPLACING WINDOWS, STEEL BEAM, PAINTING WORK AND MECHANICAL WORK OF SPLIT AC SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01185547-I1
07/28/2025
Signed off — Alteration
FILE PLUMBING WORK WITH INSTALLATION OF NEW PLUMBING FIXTURES AND GAS APPLIANCES AS PER PLAN IN CONJUNCTION WITH #B01185547-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01179553-I1
06/26/2025
Filed — Alteration
GENERAL RENOVATION OF 2-FAMILY BUILDING WITH REMOVING PARTITION, REPAIRING CEILING, NEW FLOOR TILES, PARTITION, DOOR, REPLACING WINDOWS, STEEL BEAM, PAINTING WORK AND MECHANICAL WORK OF SPLIT AC SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01185547-P2
06/05/2025
Filed — Alteration
GENERAL RENOVATION OF 2-FAMILY BUILDING WITH REMOVING PARTITION, REPAIRING CEILING, NEW FLOOR TILES, PARTITION, DOOR, REPLACING WINDOWS, STEEL BEAM, PAINTING WORK AND MECHANICAL WORK OF SPLIT AC SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01185547-P1
06/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Chun Feng
06/05/2025
Special inspection requirement — Interior lighting power
Chun Feng
06/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
Chun Feng
06/05/2025
Special inspection requirement — Concrete - Cast-In-Place
NARESH MAHANGU
06/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
06/05/2025
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
06/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
06/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
06/05/2025
Special inspection requirement — Final
Chun Feng
06/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
Chun Feng
06/05/2025
Special inspection requirement — Insulation placement and R values
Chun Feng
06/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
Chun Feng
06/05/2025
Special inspection requirement — Fenestration areas
Chun Feng
06/05/2025
Special inspection requirement — Air barrier - visual inspection
Chun Feng
06/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Chun Feng
06/05/2025
Special inspection requirement — Fenestration air leakage
Chun Feng
05/05/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/05/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/01/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/18/2025
Permit issued — Plumbing
B01179553-I1-PL
03/10/2025
Permit issued — General Construction
B01185547-I1-MS
03/10/2025
Permit issued — General Construction
B01185547-I1-GC
03/07/2025
Filed — Alteration
GENERAL RENOVATION OF 2-FAMILY BUILDING WITH REMOVING PARTITION, REPAIRING CEILING, NEW FLOOR TILES, PARTITION, DOOR, REPLACING WINDOWS, STEEL BEAM, PAINTING WORK AND MECHANICAL WORK OF SPLIT AC SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01185547-I1
03/07/2025
Filed — Alteration
FILE PLUMBING WORK WITH INSTALLATION OF NEW PLUMBING FIXTURES AND GAS APPLIANCES AS PER PLAN IN CONJUNCTION WITH #B01185547-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01179553-I1
02/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
02/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offS & L PLUMBING INC03/18/2025
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION03/10/2025
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION03/10/2025
2 projects · most recent 08/14/2025
HVAC Wiring General Wiring
FiledStatusContractorScope
08/14/2025CompleteA.C. MORGAN ELECTRICHVAC Wiring
03/20/2025CompleteA.C. MORGAN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/05/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
06/05/2025Fenestration and door U-factor and product ratingsChun Fengenergy_progress
06/05/2025Interior lighting powerChun Fengenergy_progress
06/05/2025HVAC-R and service water heating equipmentChun Fengenergy_progress
06/05/2025Concrete - Cast-In-PlaceNARESH MAHANGUspecial
06/05/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
06/05/2025Mechanical SystemsNARESH MAHANGUspecial
06/05/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
06/05/2025Energy Code Compliance InspectionsChun Fengprogress
06/05/2025FinalChun Fengprogress
06/05/2025Fire-Resistance Rated ConstructionChun Fengprogress
06/05/2025Insulation placement and R valuesChun Fengenergy_progress
06/05/2025HVAC-R and service water heating system controlsChun Fengenergy_progress
06/05/2025Fenestration areasChun Fengenergy_progress
06/05/2025Air barrier - visual inspectionChun Fengenergy_progress
06/05/2025HVAC-R and service water piping design and insulationChun Fengenergy_progress
06/05/2025Fenestration air leakageChun Fengenergy_progress
02/13/2025Energy Code Compliance InspectionsChun Fengprogress
02/13/2025Fire-Resistant Penetrations and JointsChun Fengspecial
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026B01179553-I1Request digital key ↗
08/21/2026B01185547-I1Request digital key ↗
08/21/2026B01185547-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/22/2026B01179553-I1Open ↗
08/21/2026B01185547-P2Open ↗
08/21/2026B01185547-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026B01179553-I1Open ↗
08/23/2026B01185547-P1Open ↗
08/23/2026B01185547-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026B01179553-I1Open ↗
08/23/2026B01185547-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026B01179553-I1Open ↗
08/21/2026B01185547-P2Open ↗
08/21/2026B01185547-P1Open ↗
Showing 3 of 4 on file for this type