← Back
Two stories - detached, small or mid-size
133-12 133 STREET
QUEENS · South Ozone Park · BIN 4256257
💬 Discuss this project
1910Year Built
2Stories
A1Building Class
R3-2Zoning
1,152 sfGross Floor Area
1Units
4 Open Violations ▸
Two stories - detached, small or mid-size · 4,000 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Filed — no permit issued17p · 2 filings · 18 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/30/2025$639K—Private party → NEW GUYANA, INC.$555/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG ENGINEERING PLLC308/03/2026
Building Lifecycle
All (26)Filed (3)Violation (4)Objection (8)Special Inspection (11)
08/19/2026
Objection raised — Inspections
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Admin
08/19/2026
Objection raised — Inspections
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Inspections
08/12/2026
Objection resolved — Resolved
08/10/2026
Objection raised — Other
08/03/2026
Filed — Alteration
Propose temporary construction fence as per plans.
Q01291930-I1
07/22/2026
Filed — Alteration CO
Propose alterations, interior and exterior modification. Remove fire damaged defective areas. Propose horizontal enlargement as per plans. Obtain new certificate of occupancy for 2 family dwelling.
Q01292632-S1
07/22/2026
Filed — Alteration CO
Propose alterations, interior and exterior modification. Remove fire damaged defective areas. Propose horizontal enlargement as per plans. Obtain new certificate of occupancy for 2 family dwelling.
Q01292632-I1
04/30/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
04/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/30/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
04/30/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
04/30/2026
Special inspection requirement — Energy Code Compliance Inspections
04/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/30/2026
Special inspection requirement — Maintenance information
04/30/2026
Special inspection requirement — Permanent certificate
04/30/2026
Special inspection requirement — Metering
08/15/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/18/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/17/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/15/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Nothing on file for this building.
1 project · most recent 07/22/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/22/2026——Gas, Storm, Water/Sanitary
1 project · most recent 07/22/2026
Concrete Wood
FiledStatusContractorScope
07/22/2026——Concrete, Wood
1 project · most recent 08/03/2026
Fence
FiledStatusContractorScope
08/03/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
04/30/2026Subsurface Investigations (Borings/Test Pits)—special
04/30/2026Fire-Resistant Penetrations and Joints—special
04/30/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
04/30/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
04/30/2026Energy Code Compliance Inspections—progress
04/30/2026HVAC-R and service water heating equipment—energy_progress
04/30/2026HVAC-R and service water piping design and insulation—energy_progress
04/30/2026HVAC-R and service water heating system controls—energy_progress
04/30/2026Maintenance information—energy_progress
04/30/2026Permanent certificate—energy_progress
04/30/2026Metering—energy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026Q01292632-S1Request digital key ↗
08/16/2026Q01292632-I1Request digital key ↗
08/15/2026Q01291930-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026Q01292632-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026Q01292632-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026Q01292632-S1Open ↗
08/16/2026Q01292632-I1Open ↗
08/16/2026Q01291930-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/16/2026Q01292632-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026Q01292632-S1Open ↗
08/16/2026Q01292632-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/16/2026Q01292632-I1Open ↗
08/16/2026Q01292632-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/16/2026Q01292632-S1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/16/2026Q01292632-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026Q01292632-I1Open ↗
▸DOB NOWPlot Diagram1
08/16/2026Q01292632-I1Open ↗