ECB03/20/2026RCA ISSUED ON 09/16/24 BY BADGE #3285 TO SAME RESPONDENT & NOT CORRECTED FAILURE TO COMPLY W/COMMISSIONER'S ORDER & FILE CERTIFICATE OF CORRECTION WITH THE DEPARTMENT FOR SUMMONSES # (34914534R) ISSUED ON 05/23$6K due
ECB03/20/2026RCA ISSUED ON 09/10/24 BY BADGE #3285 TO SAME RESPONDENT & NOT CORRECTED FAILURE TO CONDUCT OR FILE FINAL INSPECTION OF PERMITTED WORK WITH THE DEPARTMENT FOR JOB # (420632499) ALT 2, SCOPE: INTERIOR MODIFICATI$6K due
ECB12/20/2024PLANTING REQUIREMENT AT FRONT YARD. NOTED, AT TIME OF INSPECTION AT FRONT OF PREMISES OBSERVED THE PLANTING AREA OF THE FRONT YARD WAS REMOVED AND REPLACED WITH CONCRETE PAVERS. FRONTAGE PLANTING AREA MUST BE 2Nothing owed — awaiting certificate of correction
ECB05/23/2011WORK W/O A PERMIT. WORK NOTED AT CELLAR LEVEL INSTALLED WATER & WASTE LINE FOR RESIDENTIAL SINK. REMEDY: OBTAIN PERMIT.Nothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 2,400 sf lot · 0.51 FAR built · Flood zone X