← Back
BuildNYC
Two stories - detached, small or mid-size
133-17 VAN WYCK EXPRESSWAY
QUEENS · BIN 4262476
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R3AZoning
1,026 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction6p · 1 filing · 20 docs
AtticUnder Construction16p · 1 filing · 20 docs
Floor 2Under Construction17p · 1 filing · 20 docs
Floor 1Under Construction16p · 1 filing · 20 docs
CellarUnder Construction23p · 1 filing · 20 docs
Site & exteriorUnder Construction61p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Myrtle Development910/04/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/23/2026$575K—Private party → RUMI HOLDINGS LLC$560/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Pirooz Engineering409/30/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Somal Home Improvements.iGeneral Contractor107/08/2026
Somal Home Improvements.iScaffold104/09/2026
Watermark PlumbingPlumbing107/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP Concrete Testing and I6252209/30/2026
Pirooz Engineering7177105/03/2026
Triangle Inspection & Tes7495105/03/2026
Building Lifecycle
09/30/2026
Filed — Alteration CO
CONVERSION OF AN EXISTING 2-STORY, ONE-FAMILY FRAME BUILDING W/ CELLAR TO A 2-STORY WITH CELLAR, TWO-FAMILY DWELLING WITH HORIZONTAL AND VERTICAL EXTENSION.
Q01360107-P1
09/24/2026
Special inspection requirement — Metering
INDARDEO PARBHUNATH
09/24/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
INDARDEO PARBHUNATH
09/24/2026
Special inspection requirement — Final
NAVEEN KUMAR
09/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
INDARDEO PARBHUNATH
50 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWatermark Plumbing07/09/2026
DOB NOWStructuralPermit IssuedSomal Home Improvements.i05/01/2026
DOB NOWConstruction FenceSigned-offSomal Home Improvements.i04/01/2026
1 project · most recent 09/30/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
09/30/2026Permit IssuedSomal Home Improvements.iAir Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 09/30/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/30/2026Signed-offWatermark PlumbingGas, Storm, Water/Sanitary
1 project · most recent 06/24/2026
General Wiring
FiledStatusContractorScope
06/24/2026Permit IssuedMetropolitan Electric of NY IGeneral Wiring
1 project · most recent 09/30/2026
Concrete Wood
FiledStatusContractorScope
09/30/2026Signed-offWatermark PlumbingConcrete, Wood
1 project · most recent 09/30/2026
Fence
FiledStatusContractorScope
09/30/2026Signed-offWatermark PlumbingFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
09/24/2026Concrete - Cast-In-PlaceINDARDEO PARBHUNATHspecial
09/24/2026HVAC-R and service water piping design and insulationINDARDEO PARBHUNATHenergy_progress
09/24/2026HVAC-R and service water heating system controlsINDARDEO PARBHUNATHenergy_progress
09/24/2026Ventilation and air distribution systemINDARDEO PARBHUNATHenergy_progress
09/24/2026HVAC-R and service water heating equipmentINDARDEO PARBHUNATHenergy_progress
09/24/2026Permanent certificateINDARDEO PARBHUNATHenergy_progress
09/24/2026Duct leakage testing, insulation and designINDARDEO PARBHUNATHenergy_progress
09/24/2026Electric vehicle service equipment requirementsINDARDEO PARBHUNATHenergy_progress
09/24/2026Air barrier - visual inspectionINDARDEO PARBHUNATHenergy_progress
09/24/2026Fenestration air leakageINDARDEO PARBHUNATHenergy_progress
09/24/2026Interior lighting powerINDARDEO PARBHUNATHenergy_progress
09/24/2026Insulation placement and R valuesINDARDEO PARBHUNATHenergy_progress
09/24/2026MeteringINDARDEO PARBHUNATHenergy_progress
09/24/2026Fenestration and door U-factor and product ratingsINDARDEO PARBHUNATHenergy_progress
09/24/2026Fenestration areasINDARDEO PARBHUNATHenergy_progress
09/24/2026Maintenance informationINDARDEO PARBHUNATHenergy_progress
09/24/2026Structural Wood FrameINDARDEO PARBHUNATHprogress
09/24/2026PreliminaryINDARDEO PARBHUNATHprogress
09/24/2026Footing and FoundationINDARDEO PARBHUNATHprogress
09/24/2026Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
09/24/2026FinalNAVEEN KUMARprogress
09/24/2026Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
09/24/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
09/24/2026Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
09/24/2026Mechanical SystemsINDARDEO PARBHUNATHspecial
Latest 25 of 66.
89 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account