← Back
BuildNYC
Elevator cooperative
133-27 SANFORD AVENUE
QUEENS · BIN 4114273
💬 Discuss this project
1952Year Built
6Stories
D4Building Class
R6Zoning
36,362 sfGross Floor Area
35Units
LL97 CoveredRent Stabilized9 Active Violations ▸
Elevator cooperative · Owner of record: Sandale Cooperative Apts · 16,200 sf lot · 2.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 6Sanford Plaza Apartment CORPUnder Construction10p · 1 filing · 18 docs
Floor 5Sanford Plaza Apartment CORPUnder Construction10p · 1 filing · 18 docs
Floor 4Sanford Plaza Apartment CORPUnder Construction10p · 1 filing · 18 docs
Floor 3Sanford Plaza Apartment CORPUnder Construction10p · 1 filing · 18 docs
Floor 2Sanford Plaza Apartment CORPUnder Construction10p · 1 filing · 18 docs
Floor 1Sanford Plaza Apartment CORPUnder Construction11p · 1 filing · 18 docs
CellarSanford Plaza Apartment CORPUnder Construction12p · 1 filing · 18 docs
Site & exteriorSandale Coop Aprt, INC.4p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sanford Plaza Apartment907/08/2026
Sandale Cooperative Apts103/22/2026
133-27 Sanford Ave103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Applied HVAC Engineering202/11/2026
Augustine Lee Architect101/23/2026
FL&M Engineering Design & Inspection106/13/2023
Ega Associates210/31/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Modern Building Consultant303/21/2026
Green Studio203/21/2026
KM Associates of New York203/21/2026
K & M Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Reliant Power SystemsElectrical103/22/2026
Allstate Restorationspecialty_contractor107/08/2026
Malek & Rakshan AssGeneral Contractor107/08/2026
Ace Group NYScaffold107/08/2026
Malek Rakshan Assspecialty_contractor107/08/2026
98 ConstructionGeneral Contractor110/23/2009
Apple Incinerator & CompactorPlumbing105/07/1991
Approved EnergyPlumbing107/22/2016
KD International DevelopmentGeneral Contractor111/05/1998
Rockledge ScaffoldGeneral Contractor110/14/2015
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rakshan Malek Associates3352302/11/2026
Building Lifecycle
11/02/2026
Boiler inspection report filed
Initial · no defects · Accepted
07/23/2026
§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE…
HPD violation · open
06/29/2026
Elevator Category 1 inspection report filed
05/12/2026
Permit issued — General Construction
Q01350263-I1-GC
05/08/2026
Permit issued — Mechanical Systems
Q01350263-S1-MS
124 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMalek & Rakshan Ass05/12/2026
DOB NOWMechanical SystemsPermit IssuedMalek & Rakshan Ass05/08/2026
DOB NOWSidewalk ShedPermit IssuedAce Group NY06/14/2023
DOB NOWGeneral ConstructionSigned-offAllstate Restoration11/07/2022
BISPLISSUEDBell Fuel Oil07/22/2016
BISBLISSUEDApproved Oil Co of Brooklyn07/22/2016
BISEQISSUEDRockledge Scaffold10/14/2015
BISOTISSUED98 Construction10/23/2009
BISOTISSUEDKD International Development11/05/1998
BISFBISSUEDFlame Safe05/13/1994
BISSPISSUEDApple Incinerator & Compactor05/07/1991
1 project · most recent 02/11/2026
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScope
02/11/2026Permit IssuedMalek & Rakshan AssHeating and Air Conditioning Systems, Heating Systems
3 projects · most recent 10/22/2025
General Wiring
FiledStatusContractorScope
10/22/2025Permit IssuedReliant Power SystemsGeneral Wiring
10/14/2021CompleteKJK ElectricGeneral Wiring
05/09/2021Permit IssuedTriple T ElectricGeneral Wiring
1 project · most recent 02/11/2026
FiledStatusContractorScope
02/11/2026Permit IssuedMalek & Rakshan Ass—
1 project · most recent 06/13/2023
Sidewalk Shed
FiledStatusContractorScope
06/13/2023Permit IssuedAce Group NYSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
02/07/2026Fire-Resistant Penetrations and JointsMARYAM RAKSHANspecial
02/07/2026Energy Code Compliance InspectionsMARYAM RAKSHANprogress
02/07/2026HVAC-R and service water heating system controlsMARYAM RAKSHANenergy_progress
02/07/2026Maintenance informationMARYAM RAKSHANenergy_progress
02/07/2026HVAC-R and service water piping design and insulationMARYAM RAKSHANenergy_progress
02/07/2026Tenant Protection Plan ComplianceMARYAM RAKSHANspecial
01/23/2026Fire-Resistant Penetrations and JointsMARYAM RAKSHANspecial
01/23/2026Tenant Protection Plan ComplianceMARYAM RAKSHANspecial
01/23/2026Energy Code Compliance InspectionsMARYAM RAKSHANprogress
01/23/2026HVAC-R and service water heating equipmentMARYAM RAKSHANenergy_progress
01/23/2026Maintenance informationMARYAM RAKSHANenergy_progress
01/23/2026HVAC-R and service water heating system controlsMARYAM RAKSHANenergy_progress
01/23/2026HVAC-R and service water piping design and insulationMARYAM RAKSHANenergy_progress
01/23/2026Air barrier - visual inspectionAugustine Leeenergy_progress
01/22/2026Fire-Resistant Penetrations and JointsMARYAM RAKSHANspecial
01/22/2026Tenant Protection Plan ComplianceMARYAM RAKSHANspecial
01/22/2026Energy Code Compliance InspectionsMARYAM RAKSHANprogress
01/22/2026Mechanical SystemsMARYAM RAKSHANspecial
01/22/2026FinalMARYAM RAKSHANprogress
10/27/2022FinalEDWARD AGNOLIprogress
10/27/2022Air barrier - visual inspectionEDWARD AGNOLIenergy_progress
80 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account