Parochial school, yeshiva
Coney Island Prep Upper Elementary School
133 27TH AVENUE · BIN 3186885
💬 Discuss this project
1966Year Built
2Stories
W2Building Class
R5Zoning
28,675 sfGross Floor Area
1Units
LL97 Covered0 Active Violations 2 likely answered 1 old, status unconfirmed ▸FDNY Report ↗
Parochial school, yeshiva · 30,933 sf lot · 0.93 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Coney Island Prep Upper Elementary School2p · 1 filing · 3 docs
Floor 1Coney Island Prep Upper Elementary School28p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rocklyn Asset2707/08/2026
Most Precious Blood School103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York Design Architects407/12/2023
Gregory V. Perotto, P.E909/02/2021
Diproperzio & Mallia Architects105/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Perotto Group1803/21/2026
New York Design Arhictects803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R. Barone PlumbingPlumbing307/08/2026
F.G.E. Electrical ContgElectrical103/21/2026
Aks Architectural Engineering ServicesGeneral Contractor103/22/2026
Dubai Development GRGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Gregory V. Perotto, P.E947909/02/2021
Building Lifecycle
All (72)Filed (14)Permit Issued (4)Signed Off (4)Violation (16)Inspection (2)Objection (2)Special Inspection (30)
07/17/2023
Special inspection requirement — Public Assembly Emergency Lighting
Joseph Smerina
07/12/2023
Filed — No Work
B00184921-P3
07/12/2023
Special inspection requirement — Public Assembly Emergency Lighting
Joseph Smerina
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/15/2023
Filed — No Work
B00184921-P2
03/15/2023
Special inspection requirement — Public Assembly Emergency Lighting
Joseph Smerina
01/04/2023
Violation issued (FDNY_NOV, closed)
09/27/2021
Signed off — Alteration
RECONNECT BOILERS TO EXG. GAS LINE AND METER AND INSTALL INDIRECT HOT WATER HEATER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522906-I1
09/27/2021
Signed off — Alteration
REPLACE TWO (2) BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522902-I1
09/27/2021
Signed off — Alteration
INSTALL BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00538159-I1
09/08/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/07/2021
Special inspection requirement — Maintenance information
Gregory Perotto
09/07/2021
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
09/07/2021
Special inspection requirement — Heating Systems
Gregory Perotto
09/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
09/07/2021
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
09/02/2021
Filed — Alteration
REPLACE TWO (2) BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522902-P2
09/02/2021
Filed — Alteration
INSTALL BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00538159-P2
09/02/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/02/2021
Special inspection requirement — Heating Systems
Gregory Perotto
09/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
09/02/2021
Special inspection requirement — Maintenance information
Gregory Perotto
09/02/2021
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
09/02/2021
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
09/02/2021
Special inspection requirement — Heating Systems
Gregory Perotto
09/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
09/02/2021
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
09/02/2021
Special inspection requirement — Maintenance information
Gregory Perotto
09/02/2021
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
09/02/2021
Special inspection requirement — Lowest Floor Elevation
Gregory Perotto
08/31/2021
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
08/31/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
08/31/2021
Special inspection requirement — Energy Code Compliance Inspections
Gregory Perotto
08/31/2021
Special inspection requirement — Maintenance information
Gregory Perotto
08/31/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
08/31/2021
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
08/30/2021
Filed — Alteration
RECONNECT BOILERS TO EXG. GAS LINE AND METER AND INSTALL INDIRECT HOT WATER HEATER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522906-P2
08/23/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
08/23/2021
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
08/23/2021
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
08/23/2021
Special inspection requirement — Maintenance information
Gregory Perotto
08/23/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
08/19/2021
Objection resolved — Addressed
08/10/2021
Filed — Alteration
RECONNECT BOILERS TO EXG. GAS LINE AND METER AND INSTALL INDIRECT HOT WATER HEATER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522906-P1
08/10/2021
Filed — Alteration
REPLACE TWO (2) BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522902-P1
08/10/2021
Filed — Alteration
INSTALL BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00538159-P1
07/14/2021
Objection raised — Structural
06/29/2021
Filed — No Work
B00184921-P1
06/15/2021
Signed off — Alteration
B00518609-I1
06/14/2021
Permit issued — Boiler Equipment
B00538159-I1-BE
06/14/2021
Permit issued — Boiler Equipment
B00522902-I1-BE
06/14/2021
Permit issued — Plumbing
B00522906-I1-PL
06/13/2021
Filed — Alteration
RECONNECT BOILERS TO EXG. GAS LINE AND METER AND INSTALL INDIRECT HOT WATER HEATER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522906-I1
06/13/2021
Filed — Alteration
REPLACE TWO (2) BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522902-I1
06/13/2021
Filed — Alteration
INSTALL BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00538159-I1
06/04/2021
Permit issued — General Construction
B00518609-I1-GC
05/18/2021
Filed — Alteration
B00518609-I1
02/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/28/2020
Violation issued (FDNY_NOV, closed)
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offR. Barone Plumbing06/14/2021
DOB NOWBoiler EquipmentSigned-offR. Barone Plumbing06/14/2021
DOB NOWPlumbingSigned-offR. Barone Plumbing06/14/2021
DOB NOWGeneral ConstructionSigned-offDubai Development GR06/04/2021
BISPLISSUEDCRC Mechanical Plumbing & Heating12/07/2010
BISOTISSUEDBayside Builders12/02/2010
BISOTISSUEDMega Contracting06/28/2005
BISPLISSUEDJohn Bretone PL & Heating05/05/1998
1 project · most recent 05/04/2021
General Wiring
FiledStatusContractorScope
05/04/2021CompleteAMC Electrical ServicesGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/08/2021Pass-Final Boiler Equipment InspectionPassView ↗
09/02/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
07/17/2023Public Assembly Emergency LightingJoseph Smerinaprogress
07/12/2023Public Assembly Emergency LightingJoseph Smerinaprogress
03/15/2023Public Assembly Emergency LightingJoseph Smerinaprogress
09/07/2021Maintenance informationGregory Perottoenergy_progress
09/07/2021HVAC-R and service water heating equipmentGregory Perottoenergy_progress
09/07/2021Heating SystemsGregory Perottospecial
09/07/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
09/07/2021HVAC-R and service water heating system controlsGregory Perottoenergy_progress
09/02/2021Heating SystemsGregory Perottospecial
09/02/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
09/02/2021Maintenance informationGregory Perottoenergy_progress
09/02/2021HVAC-R and service water heating equipmentGregory Perottoenergy_progress
09/02/2021HVAC-R and service water heating system controlsGregory Perottoenergy_progress
09/02/2021Heating SystemsGregory Perottospecial
09/02/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
09/02/2021HVAC-R and service water heating equipmentGregory Perottoenergy_progress
09/02/2021Maintenance informationGregory Perottoenergy_progress
09/02/2021HVAC-R and service water heating system controlsGregory Perottoenergy_progress
09/02/2021Lowest Floor ElevationGregory Perottoprogress
08/31/2021HVAC-R and service water heating system controlsGregory Perottoenergy_progress
08/31/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
08/31/2021Energy Code Compliance InspectionsGregory Perottoprogress
08/31/2021Maintenance informationGregory Perottoenergy_progress
08/31/2021HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
08/31/2021HVAC-R and service water heating equipmentGregory Perottoenergy_progress
Latest 25 of 43.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Coney Island Prep Upper Elementary SchoolEducationEntire building
Project B00522902 Alteration · LOC Issued · 06/13/2021
Project B00522906 Alteration · LOC Issued · 06/13/2021
Project B00538159 Alteration · LOC Issued · 06/13/2021
Project B00518609 Alteration · LOC Issued · 05/18/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 119 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch10
09/01/2026B00518609-I1Request digital key ↗
09/01/2026B00538159-I1Request digital key ↗
09/01/2026B00538159-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
09/02/2026B00184921-P3Request digital key ↗
09/02/2026B00184921-P2Request digital key ↗
09/02/2026B00184921-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
12/08/2010320190459Open ↗
12/03/2010320190459Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
12/08/2010320190459Open ↗
07/22/2010320190459Open ↗
▸Seals & Professional Certifications58
▸DOB NOWProgress Inspector Seal & Signature32
09/01/2026B00184921-P1Open ↗
09/01/2026B00538159-P2Open ↗
09/01/2026B00538159-P2Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/01/2026B00518609-I1Open ↗
09/01/2026B00538159-P1Open ↗
09/01/2026B00538159-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026B00538159-P2Open ↗
09/01/2026B00538159-P2Open ↗
09/01/2026B00538159-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/22/2010320190459Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE2
02/17/2011320190459Open ↗
01/03/2011320190459Open ↗
▸BISSCHEDULE B - PLUMBING1
07/22/2010320190459Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/01/2026B00538159-I1Open ↗
09/01/2026B00522906-I1Open ↗
09/01/2026B00522902-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/03/2010320190459Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/01/2026B00518609-I1Open ↗
▸Energy Compliance5
▸DOB NOWEN2: As Built Energy Analysis.3
09/01/2026B00522906-I1Open ↗
08/13/2026B00522902-I1Open ↗
08/13/2026B00538159-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00538159-I1Open ↗
08/13/2026B00522902-I1Open ↗
▸Approvals, Objections & Sign-offs15
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
09/01/2026B00518609-I1Open ↗
09/01/2026B00538159-P1Open ↗
09/01/2026B00538159-I1Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
07/22/2010320190459Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/22/2010320190459Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
07/22/2010320190459Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B00522906-P2Open ↗
▸Other Documents12
▸DOB NOWAlternate Plan 14
09/02/2026B00184921-P2Open ↗
09/02/2026B00184921-I1Open ↗
09/02/2026B00184921-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAlternate Plan 24
09/02/2026B00184921-P2Open ↗
09/02/2026B00184921-P3Open ↗
09/02/2026B00184921-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAlternate Plan 34
09/02/2026B00184921-P2Open ↗
09/02/2026B00184921-P3Open ↗
09/02/2026B00184921-I1Open ↗
Showing 3 of 4 on file for this type