ECB05/08/2023WORK WITHOUT A PERMIT. NOTED AT CELLAR LEVEL ERECTED FULL HEIGHT PARTITION WALLS FOR 1 ROOMS WITH DOOR. INSTALLED WATER & WASTE LINES FOR 3-PC BATHROOM(SINK,TOILET,SHOWER)&WASHING MACHINE. INSTALLED 220 V ELECT$500 due
Locations of Work
No floor-level scope or drawing coverage on file for this building.