← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Sanford Tower Condominium
133-47 SANFORD AVENUE · Flushing-Willets Point · BIN 4461841
💬 Discuss this project
2000Year Built
13Stories
RMBuilding Class
R6Zoning
126,843 sfGross Floor Area
76Units
LL97 CoveredRent Stabilized6 Open Violations 4 unresolved · 2 paperwork only ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 16,633 sf lot · 7.63 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 2 docs
Floor 26p · 2 filings · 18 docs
Floor 1
Sub-CellarUnder Construction3p · 1 filing · 5 docs
Site & exteriorUnder Construction25p · 4 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sanford Tower Condominium Inc.2408/29/2026
SANFORD TOWER403/21/2026
CHISAN REAL ESTATE MANAGEMENT303/21/2026
SANFORD TOWER GARAGE208/29/2026
FREE LAND MANAGEMENT203/21/2026
N103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EDG106/09/2026
POLAR ENGINEERING, P.C.103/17/2026
FL&M ENGINEERING DESIGN &INSPECTION312/11/2025
J&R DESIGN AND INSPECTION CORP.104/28/2025
AR ARCHITECT P.C109/28/2023
ASHRAF CORP110/25/2021
J X 2 DESIGN CONSULING LLC208/12/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX BUILDING CONSULTING303/21/2026
ADAC CONSTRUCTION203/21/2026
Rigid Structural Design, LLC503/21/2026
DANICO SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MC SUPERSTRUCTURE INCGeneral Contractor407/30/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor404/09/2026
DIESEL CONTRACTING OF N.YGeneral Contractor307/08/2026
SARDAR RESTORATION CORPGeneral Contractor107/08/2026
LAKE CONTRACTING LLCGeneral Contractor108/05/2026
GREENTECH CONSTRUCTION COGeneral Contractor107/08/2026
BUILDER BROTHER GROUP INCGeneral Contractor105/15/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDING CONSULTING ENGIN1034106/09/2026
EDG2578106/09/2026
WELLDONE INSPECTION INC.8628103/17/2026
J&R DESIGN AND INSPECTION6637104/28/2025
NEW AIR SOLUTION INC8418109/28/2023
INDETAIL DESIGN ARCHITECT4828208/12/2020
Building Lifecycle
All (129)Filed (11)Permit Issued (13)Signed Off (4)Facade (FISP) (9)Violation (60)Inspection (1)Objection (14)Special Inspection (17)
08/04/2026
Permit issued — Structural
Q01414561-I1-ST
07/29/2026
Permit issued — Sidewalk Shed
Q00691790-I1-SH
06/26/2026
Permit issued — Suspended Scaffold
Q01414316-I1-SC
06/18/2026
Objection raised — Other
06/18/2026
Objection resolved — Addressed
06/09/2026
Filed — Alteration
Suspended scaffold outrigger installation for Facade Restoration works
Q01414316-I1
06/09/2026
Filed — Alteration
Installation of temporary shoring and netting in the garage sub-cellar #2 as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Q01414561-I1
06/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
TONY ONYEAGORO
06/09/2026
Special inspection requirement — Final
Alexander Jordan
06/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
VIVEK SHAH
05/13/2026
Permit issued — General Construction
Q01346171-I1-GC
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/03/2026
Objection raised — Other
04/03/2026
Objection raised — Scope
04/03/2026
Objection raised — Zoning
03/17/2026
Filed — Alteration
Exterior facade repairs as necessary. 9th cycle FISP repair. There is no change occupancy, use or egress
Q01346171-I1
12/11/2025
Filed — Alteration
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00691790-P2
11/05/2025
Violation issued (ECB, closed)
Construction
06/17/2025
Signed off — Alteration
Installation of split unit for unit 2B located at2Fl, no change in use, egress or occupancy
Q01214327-I1
06/16/2025
Permit issued — Sidewalk Shed
Q00691790-I1-SH
06/10/2025
Permit issued — Mechanical Systems
Q01214327-I1-MS
04/28/2025
Filed — Alteration
Installation of split unit for unit 2B located at2Fl, no change in use, egress or occupancy
Q01214327-I1
04/23/2025
Special inspection requirement — Maintenance information
Robert Truskosky
04/22/2025
Special inspection requirement — HVAC and service water heating system controls
Robert Truskosky
04/22/2025
Special inspection requirement — Mechanical Systems
Robert Truskosky
04/22/2025
Special inspection requirement — Final
Jonar Madriaga
04/22/2025
Special inspection requirement — HVAC insulation and sealing
Robert Truskosky
04/22/2025
Special inspection requirement — HVAC and service water heating equipment
Robert Truskosky
03/05/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/12/2024
Violation issued (ECB, open)
Construction
10/02/2024
Signed off — Alteration
MINOR MAINTENANCE OF BALCONIES FRONT AND REAR FACADE.
Q00934044-I1
09/30/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/24/2024
Permit issued — Sidewalk Shed
Q00691790-I1-SH
03/06/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/21/2024
Cycle 9 facade report submitted
02/20/2024
Cycle 9 facade report signed — SWARMP
02/09/2024
Cycle 9 facade inspection completed
12/08/2023
Violation issued (ECB, closed)
Construction
12/08/2023
Violation issued (ECB, closed)
Construction
11/22/2023
Permit issued — General Construction
Q00934044-I1-GC
10/11/2023
Objection resolved — Addressed
10/11/2023
Objection resolved — Addressed
10/11/2023
Objection resolved — Addressed
10/06/2023
Objection raised — Other
10/06/2023
Objection raised — Other
10/06/2023
Objection raised — Structural
09/28/2023
Filed — Alteration
MINOR MAINTENANCE OF BALCONIES FRONT AND REAR FACADE.
Q00934044-I1
07/12/2023
Permit issued — Sidewalk Shed
Q00691790-I1-SH
03/28/2023
Permit issued — Sidewalk Shed
Q00691790-I1-SH
11/30/2022
Signed off — Alteration
Q00607515-I1
06/17/2022
Violation issued (HPD, open)
A
06/17/2022
Violation issued (HPD, open)
A
04/22/2022
Filed — Alteration
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00691790-P1
04/05/2022
Violation issued (HPD, closed)
A
04/05/2022
Violation issued (HPD, closed)
C
04/05/2022
Violation issued (HPD, closed)
B
04/05/2022
Violation issued (HPD, closed)
A
04/05/2022
Violation issued (HPD, closed)
C
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedLAKE CONTRACTING LLC08/04/2026
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC07/29/2026
DOB NOWSuspended ScaffoldPermit IssuedCHK CONSTRUCTION CORP06/26/2026
DOB NOWGeneral ConstructionPermit IssuedBUILDER BROTHER GROUP INC05/13/2026
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC06/16/2025
DOB NOWMechanical SystemsSigned-offCENTRAL CONSTRUCTION MAN*06/10/2025
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC06/24/2024
DOB NOWGeneral ConstructionSigned-offGREENTECH CONSTRUCTION CO11/22/2023
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC07/12/2023
DOB NOWSidewalk ShedPermit IssuedTRI BOROUGH SCAFFOLDING03/28/2023
DOB NOWSidewalk ShedPermit IssuedTRI BOROUGH SCAFFOLDING03/10/2022
DOB NOWGeneral ConstructionSigned-offSARDAR RESTORATION CORP11/01/2021
DOB NOWMechanical SystemsSigned-offCENTRAL CONSTRUCTION MAN*06/25/2020
BISOTISSUEDCOS CONSTRUCTION INC04/11/2019
BISOTISSUEDCOS CONSTRUCTION INC12/06/2018
BISPLISSUEDTRI STATE PLBG & HTG INC09/21/2016
BISPLISSUEDTOP DOG PLBG & HTG CORP01/18/2013
BISOTISSUEDGREENTECH CONSTRUCTION CO12/24/2012
BISPLISSUEDBARMOR REHAB INC07/21/2011
BISOTISSUEDA & A EMPIRE HOME IMPROVE07/21/2011
BISEQISSUEDTOP 8 CONSTRUCTION CORP10/17/2006
BISOTISSUEDHSU & ASSOC INC09/20/2002
BISPLISSUEDFOUNTAIN OF TREVI, INC05/28/2002
BISOTISSUEDVITECH CONSTRUCTION INC05/08/2002
BISPLISSUEDMINLAND PLG. & HTG. INC03/08/2002
BISPLISSUEDMINLAND PLG. & HTG. INC03/08/2002
BISPLISSUEDMINLAND PLG. & HTG. INC03/08/2002
BISPLISSUEDMINLAND PLG. & HTG. INC03/08/2002
BISPLISSUEDMINLAND PLG. & HTG. INC03/08/2002
BISPLISSUEDMINLAND PLG. & HTG. INC03/08/2002
BISPLISSUEDMINLAND PLG. & HTG. INC03/08/2002
BISPLISSUEDMINLAND PLG. & HTG. INC03/08/2002
BISPLISSUEDMINLAND PLG. & HTG. INC03/08/2002
BISPLISSUEDMAINLAND PLG & HTG INC03/08/2002
BISPLISSUEDMINLAND PLG. & HTG. INC03/08/2002
BISPLISSUEDMINLAND PLG. & HTG. INC03/08/2002
BISPLISSUEDMINLAND PLG. & HTG. INC03/08/2002
BISOTISSUEDTKU CONSTRUCTION CORPORATION02/14/2002
BISOTISSUEDTKU CONSTRUCTION CORPORATION01/29/2002
BISOTISSUEDTKU CONSTRUCTION CORPORATION01/29/2002
+ 23 more permits on file
2 projects · most recent 03/08/2022
General Wiring
FiledStatusContractorScope
03/08/2022Permit IssuedV. VASS ELECTRIC CORP—
10/11/2021CancelledKJK ELECTRIC INCGeneral Wiring
1 project · most recent 06/09/2026
FiledStatusContractorScope
06/09/2026Permit IssuedLAKE CONTRACTING LLC1 scope_items
1 project · most recent 12/11/2025
Sidewalk Shed
FiledStatusContractorScope
12/11/2025Permit IssuedMC SUPERSTRUCTURE INCSidewalk Shed
1 project · most recent 06/09/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/09/2026Permit IssuedCHK CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/30/2024Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
06/09/2026Tenant Protection Plan ComplianceTONY ONYEAGOROspecial
06/09/2026FinalAlexander Jordanprogress
06/09/2026Structural Stability – Alterations of existing buildingsVIVEK SHAHspecial
04/23/2025Maintenance informationRobert Truskoskyenergy_progress
04/22/2025HVAC and service water heating system controls Robert Truskoskyenergy_progress
04/22/2025Mechanical SystemsRobert Truskoskyspecial
04/22/2025FinalJonar Madriagaprogress
04/22/2025HVAC insulation and sealing Robert Truskoskyenergy_progress
04/22/2025HVAC and service water heating equipment Robert Truskoskyenergy_progress
10/06/2021FinalJay Kaviprogress
08/12/2020Mechanical SystemsJonathan Chinspecial
08/12/2020Heating SystemsJonathan Chinspecial
08/12/2020Energy Code Compliance InspectionsJonathan Chinprogress
08/12/2020FinalJINHO KIMprogress
08/12/2020HVAC insulation and sealing Jonathan Chinenergy_progress
08/12/2020HVAC and service water heating system controls Jonathan Chinenergy_progress
08/12/2020HVAC and service water heating equipment Jonathan Chinenergy_progress
▾Documents — 114 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch9
08/27/2026Q00607515-I1Request digital key ↗
08/24/2026Q00934044-I1Request digital key ↗
08/20/2026Q01214327-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/28/2026Q00237298-I1Request digital key ↗
08/15/2026Q00237298-P1Request digital key ↗
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION6
12/18/2018421926768Open ↗
09/21/2016440340793Open ↗
01/24/2013420792627Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
12/18/2018421926768Open ↗
02/18/2017440340793Open ↗
11/02/2016440340793Open ↗
Showing 3 of 6 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
05/22/2019421926768Open ↗
▸Seals & Professional Certifications37
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026Q00237298-I1Open ↗
08/24/2026Q00934044-I1Open ↗
08/20/2026Q01214327-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/31/2026Q01414561-I1Open ↗
08/26/2026Q01214327-I1Open ↗
08/26/2026Q01214327-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
05/22/2019421926768Open ↗
12/18/2018421926768Open ↗
04/27/2017440340793Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026Q01414561-I1Open ↗
08/31/2026Q01414561-I1Open ↗
08/26/2026Q01214327-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/18/2018421926768Open ↗
09/12/2016440340793Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/18/2018421926768Open ↗
02/18/2017440340793Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/12/2016440340793Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/12/2016440340793Open ↗
▸Trade Schedules & Equipment10
▸BISSELF-CERT PLUMBING NOTICE7
10/07/2013420792627Open ↗
04/15/2013420792627Open ↗
03/25/2013420792627Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING3
09/12/2016440340793Open ↗
12/11/2012420792627Open ↗
07/22/2011420460922Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/28/2026Q00237298-I1Open ↗
08/13/2026Q00237298-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026Q00934044-I1Open ↗
08/13/2026Q00607515-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/22/2011420460922Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
12/10/2012420792627Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
05/22/2019421926768Open ↗
12/18/2018421926768Open ↗
04/27/2017440340793Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
09/13/2011420460922Open ↗
07/26/2011420460922Open ↗
07/22/2011420460922Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
05/22/2019421926768Open ↗
04/27/2017440340793Open ↗
09/13/2011420460922Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/12/2016440340793Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/27/2021401397680Open ↗
09/12/2016440340793Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
08/27/2021401397680Open ↗
05/22/2019421926768Open ↗
05/11/2017440340793Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
05/11/2017440340793Open ↗
04/27/2017440340793Open ↗
04/27/2017440340793Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/22/2011420460922Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
05/22/2019421926768Open ↗
12/18/2018421926768Open ↗
04/27/2017440340793Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
12/18/2018421926768Open ↗
12/11/2012420792627Open ↗
07/22/2011420460922Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/12/2016440340793Open ↗
▸BISADDITIONAL INFORMATION1
02/18/2017440340793Open ↗
▸BISBOROUGH INTAKE FORM1
05/22/2019421926768Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/15/2026Q01414316-I1Open ↗
▸DOB NOWCalculations1
08/15/2026Q01414316-I1Open ↗