← Back
BuildNYC
QUEENS
133-58 31ST DRIVE
QUEENS · BIN 4100770
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofParts Authority3p · 1 filing · 9 docs
Floor 1Parts Authority4p · 2 filings · 19 docs
MezzanineParts Authority4p · 2 filings · 19 docs
Site & exteriorErect illuminated non advertising sign on wall1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Parts Authority603/22/2026
Durante Construction303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
All City Engineering309/27/2024
Richard Wainer Architect105/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
D R Brown203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tavella Plumbing & Heatingspecialty_contractor303/21/2026
L.S. Sign CoSign hanger107/08/2026
Tavella Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
All City Engineering7115309/27/2024
Building Lifecycle
All (27)Filed (4)Permit Issued (3)Signed Off (3)Inspection (2)Special Inspection (15)
02/26/2025
Signed off — Alteration
MECHANICAL DESIGN INCLUDES THE INSTALLATION OF HEAT PUMP AND GAS FURNACES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
Q01034335-I1
02/12/2025
Signed off — Alteration
INSTALL NEW GAS FURNACE WITH ASSOCIATED PIPING AS PER PLAN. RELATED DOBNOW MECHANICAL JOB#Q01034335-I1. THERE IS NO CHANGE OF USE, EGRESS, OR OCCUPANCY FILED UNDER THIS PLAN.
Q01035206-I1
10/28/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/10/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Zhao Deng
09/30/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Zhao Deng
09/27/2024
Filed — Alteration
INSTALL NEW GAS FURNACE WITH ASSOCIATED PIPING AS PER PLAN. RELATED DOBNOW MECHANICAL JOB#Q01034335-I1. THERE IS NO CHANGE OF USE, EGRESS, OR OCCUPANCY FILED UNDER THIS PLAN.
Q01035206-P1
09/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Zhao Deng
09/26/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Zhao Deng
07/16/2024
Signed off — Alteration
Erect illuminated non advertising sign on wall. No change of use, egress or occupancy
Q01029512-I1
05/21/2024
Permit issued — Plumbing
Q01035206-I1-PL
05/21/2024
Permit issued — Mechanical Systems
Q01034335-I1-MS
05/15/2024
Permit issued — Sign
Q01029512-I1-SG
05/09/2024
Filed — Alteration
MECHANICAL DESIGN INCLUDES THE INSTALLATION OF HEAT PUMP AND GAS FURNACES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
Q01034335-I1
05/09/2024
Filed — Alteration
INSTALL NEW GAS FURNACE WITH ASSOCIATED PIPING AS PER PLAN. RELATED DOBNOW MECHANICAL JOB#Q01034335-I1. THERE IS NO CHANGE OF USE, EGRESS, OR OCCUPANCY FILED UNDER THIS PLAN.
Q01035206-I1
05/09/2024
Filed — Alteration
Erect illuminated non advertising sign on wall. No change of use, egress or occupancy
Q01029512-I1
05/09/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Zhao Deng
05/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Zhao Deng
04/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Zhao Deng
04/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Zhao Deng
04/12/2024
Special inspection requirement — Heating Systems
Zhao Deng
04/12/2024
Special inspection requirement — Post-installed Anchors
Zhao Deng
04/12/2024
Special inspection requirement — Maintenance information
Zhao Deng
04/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
Zhao Deng
04/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
Zhao Deng
04/11/2024
Special inspection requirement — Final
Zhao Deng
04/11/2024
Special inspection requirement — Mechanical Systems
Zhao Deng
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTavella Plumbing & Heating05/21/2024
DOB NOWMechanical SystemsSigned-offTavella Plumbing & Heating05/21/2024
DOB NOWSignSigned-offWeinfeld, Elliot05/15/2024
2 projects · most recent 09/18/2024
General Wiring
FiledStatusContractorScope
09/18/2024CompleteHI-Tech Wiring Electrical ServicesGeneral Wiring
07/07/2024CompleteAurora Electrical Contg—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/28/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/10/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
09/30/2024Fire-Resistant Penetrations and JointsZhao Dengspecial
09/30/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Zhao Dengspecial
09/26/2024Fire-Resistant Penetrations and JointsZhao Dengspecial
09/26/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Zhao Dengspecial
05/09/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Zhao Dengspecial
05/09/2024Energy Code Compliance InspectionsZhao Dengprogress
04/12/2024HVAC-R and service water piping design and insulationZhao Dengenergy_progress
04/12/2024Fire-Resistant Penetrations and JointsZhao Dengspecial
04/12/2024Heating SystemsZhao Dengspecial
04/12/2024Post-installed AnchorsZhao Dengspecial
04/12/2024Maintenance informationZhao Dengenergy_progress
04/12/2024HVAC-R and service water heating equipmentZhao Dengenergy_progress
04/12/2024HVAC-R and service water heating system controlsZhao Dengenergy_progress
04/11/2024FinalZhao Dengprogress
04/11/2024Mechanical SystemsZhao Dengspecial
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026Q01034335-I1Request digital key ↗
08/22/2026Q01029512-I1Request digital key ↗
08/21/2026Q01035206-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWSpecial Inspector Seal & Signature6
08/30/2026Q01035206-I1Open ↗
08/30/2026Q01035206-I1Open ↗
08/25/2026Q01034335-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026Q01035206-I1Open ↗
08/13/2026Q01034335-I1Open ↗
08/13/2026Q01029512-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026Q01034335-I1Open ↗
08/25/2026Q01034335-I1Open ↗
08/25/2026Q01034335-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026Q01035206-I1Open ↗
08/13/2026Q01035206-P1Open ↗
08/13/2026Q01034335-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q01034335-I1Open ↗