← Back
Two family brick
133 AUTUMN AVENUE
BROOKLYN · BIN 3091825
💬 Discuss this project
1905Year Built
2Stories
B1Building Class
R5Zoning
2,260 sfGross Floor Area
2Units
Rent Stabilized35 Open Violations 32 unresolved · 3 paperwork only ▸FDNY Report ↗
Two family brick · 1,750 sf lot · 1.29 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 1 filing · 11 docs
Floor 1
Cellar8p · 1 filing · 11 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/30/2020$620K—AVRIT NY1 INC. → Private party$274/sf building
07/03/2018$515K—Private party → ARVIT NY1 INC$228/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A M ENGINEERING SERVICES PC409/02/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AM ENGINEERING SERVICES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JUST PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM ENGINEERING SERVICES P7975111/23/2020
Building Lifecycle
All (52)Filed (4)Permit Issued (1)Violation (35)Inspection (2)Objection (6)Special Inspection (4)
11/24/2025
Violation issued (HPD, open)
I
12/03/2024
Violation issued (HPD, open)
I
11/28/2023
Violation issued (HPD, open)
I
11/17/2022
Violation issued (HPD, open)
I
09/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/02/2022
Filed — Alteration
Propose 2 pieces bath ( toilet & lavatory),prop 1 boiler, 1hwh, replace 1 boiler & 1hw, prop 1 slope sink at cellar level. Replace & relocate gas stove, toilet, lavatory, bathtub, kitchen sink at 1st & 2nd floor level.
B00429315-P2
09/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/12/2022
Filed — Alteration
Propose 2 pieces bath ( toilet & lavatory),prop 1 boiler, 1hwh, replace 1 boiler & 1hw, prop 1 slope sink at cellar level. Replace & relocate gas stove, toilet, lavatory, bathtub, kitchen sink at 1st & 2nd floor level.
B00429315-P1
07/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/29/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/16/2022
Violation issued (HPD, open)
I
02/23/2022
Permit issued — Plumbing
B34585304-I1-PL
11/22/2021
Objection resolved — Addressed
11/22/2021
Objection resolved — Addressed
11/22/2021
Objection resolved — Addressed
11/09/2021
Filed — Alteration
Propose 2 pieces bath ( toilet & lavatory),prop 1 boiler, 1hwh, replace 1 boiler & 1hw, prop 1 slope sink at cellar level. Replace & relocate gas stove, toilet, lavatory, bathtub, kitchen sink at 1st & 2nd floor level.
B00429315-S2
11/09/2021
Objection raised — Zoning
11/09/2021
Objection raised — Other
11/09/2021
Objection raised — Other
04/21/2021
Violation issued (HPD, open)
I
11/23/2020
Filed — Alteration
Propose 2 pieces bath ( toilet & lavatory),prop 1 boiler, 1hwh, replace 1 boiler & 1hw, prop 1 slope sink at cellar level. Replace & relocate gas stove, toilet, lavatory, bathtub, kitchen sink at 1st & 2nd floor level.
B00429315-I1
11/18/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Munoz
11/07/2019
Violation issued (HPD, open)
I
07/23/2010
Violation issued (ECB, open)
Construction
07/23/2010
Violation issued (ECB, open)
Construction
04/13/2010
Violation issued (HPD, open)
B
04/13/2010
Violation issued (HPD, open)
B
04/13/2010
Violation issued (HPD, open)
B
04/13/2010
Violation issued (HPD, open)
B
04/13/2010
Violation issued (HPD, open)
B
02/15/2010
Violation issued (HPD, open)
B
02/15/2010
Violation issued (HPD, open)
B
02/15/2010
Violation issued (HPD, open)
B
02/15/2010
Violation issued (HPD, open)
B
12/15/2008
Violation issued (ECB, open)
Construction
12/12/2008
Violation issued (HPD, open)
B
12/12/2008
Violation issued (HPD, open)
B
12/12/2008
Violation issued (HPD, open)
B
12/12/2008
Violation issued (HPD, open)
B
12/12/2008
Violation issued (HPD, open)
B
12/12/2008
Violation issued (HPD, open)
B
12/12/2008
Violation issued (HPD, open)
B
12/12/2008
Violation issued (HPD, open)
B
12/12/2008
Violation issued (HPD, open)
B
12/05/2008
Violation issued (HPD, open)
B
12/05/2008
Violation issued (HPD, open)
C
12/05/2008
Violation issued (HPD, open)
C
03/06/2007
Violation issued (HPD, open)
C
03/06/2007
Violation issued (HPD, open)
C
03/06/2007
Violation issued (HPD, open)
B
03/06/2007
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK02/23/2022
BISOTISSUEDDFE CONTRACTOR LLC11/17/2021
BISOTISSUEDDFE CONTRACTOR LLC01/11/2021
1 project · most recent 09/02/2022
Gas Water/Sanitary
FiledStatusContractorScope
09/02/2022——Gas, Water/Sanitary
1 project · most recent 11/04/2020
General Wiring
FiledStatusContractorScope
11/04/2020Permit IssuedWCK ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
09/07/2022Fire-Resistant Penetrations and Joints—special
09/02/2022Fire-Resistant Penetrations and Joints—special
07/12/2022Fire-Resistant Penetrations and Joints—special
11/18/2020Fire-Resistant Penetrations and JointsAlbert Munozspecial
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/29/2026B00429315-P2Request digital key ↗
08/29/2026B00429315-P1Request digital key ↗
08/15/2026B00429315-S2Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing Legalization1
08/29/2026B00429315-I1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION7
10/25/2022340796749Open ↗
10/14/2022340796749Open ↗
08/25/2022340796749Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION2
11/18/2021340796749Open ↗
01/12/2021340796749Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/29/2026B00429315-P1Open ↗
08/29/2026B00429315-P2Open ↗
08/29/2026B00429315-S2Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/29/2020340796749Open ↗
12/29/2020340796749Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/29/2020340796749Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/29/2020340796749Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026B00429315-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026B00429315-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/29/2020340796749Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/29/2026B00429315-I1Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS1
12/01/2022340796749Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/29/2020340796749Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/29/2020340796749Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/09/2022340796749Open ↗
12/01/2022340796749Open ↗
12/29/2020340796749Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/04/2023340796749Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/04/2023340796749Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/01/2022340796749Open ↗
12/29/2020340796749Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
10/25/2022340796749Open ↗
08/25/2022340796749Open ↗
▸BISBOROUGH INTAKE FORM1
11/18/2021340796749Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/29/2020340796749Open ↗