BuildNYC
Two family frame
133 BUTLER AVENUE
STATEN ISLAND · BIN 5177172
💬 Discuss this project
2025Year Built
3Stories
B2Building Class
R3AZoning
2,449 sfGross Floor Area
2Units
Two family frame · Owner of record: JM Trinity Holdings · 3,487 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 220p · 2 filings · 20 docs
Floor 124p · 2 filings · 20 docs
Basement20p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JM Trinity Holdings2007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C&P Design Consultants404/18/2025
Stanley M. Krebushevski, R.A102/11/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Beyer ConstructionGeneral Contractor507/08/2026
Premier PL, Heating & MechanicalPlumbing207/08/2026
K.M.D. Mechanical 1443Fire Protection107/08/2026
Quality PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P Design Consultant8472404/18/2025
SRA Planning & Expediting5677104/18/2025
Building Lifecycle
04/16/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
S01173854-I1-GC-CX
10/09/2025
Signed off — New Building
Installation of new 8' curb cut associated with new NB S01173854-I1
S01173854-S2
10/06/2025
Signed off — New Building
Installation of new 8' curb cut associated with new NB S01173854-I1
S01173854-S1
10/02/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/29/2025
Signed off — New Building
Installation of new 8' curb cut associated with new NB S01173854-I1
S01173854-S4
67 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPremier PL, Heating & Mechanical09/04/2025
DOB NOWPlumbingSigned-offQuality Plumbing08/14/2025
DOB NOWMechanical SystemsSigned-offBeyer Construction04/28/2025
DOB NOWPlumbingSigned-offPremier PL, Heating & Mechanical04/22/2025
DOB NOWSprinklersSigned-offK.M.D. Mechanical 144304/22/2025
DOB NOWGeneral ConstructionPermit IssuedBeyer Construction04/16/2025
DOB NOWCurb CutSigned-offBeyer Construction04/08/2025
1 project · most recent 04/18/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
04/18/2025Signed-offBeyer ConstructionHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 04/18/2025
Sprinkler System
FiledStatusContractorScope
04/18/2025Signed-offK.M.D. Mechanical 1443Sprinkler System
1 project · most recent 04/18/2025
Storm Water/Sanitary
FiledStatusContractorScope
04/18/2025Signed-offQuality PlumbingStorm, Water/Sanitary
1 project · most recent 06/22/2025
General Wiring
FiledStatusContractorScope
06/22/2025CompleteRidge ElectricGeneral Wiring
1 project · most recent 04/18/2025
Wood
FiledStatusContractorScope
04/18/2025Signed-offQuality PlumbingWood
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
10/02/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
09/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/27/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
04/18/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
04/18/2025Maintenance informationStanislav Pilipenkoenergy_progress
04/18/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
04/18/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
04/18/2025Permanent certificateStanislav Pilipenkoenergy_progress
04/18/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
04/18/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
04/18/2025Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
04/18/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesWILLIAM MONTAGUEspecial
04/18/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
04/17/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
04/17/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
04/17/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
04/17/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
04/17/2025Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
04/17/2025Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
04/17/2025Maintenance informationStanislav Pilipenkoenergy_progress
04/17/2025Permanent certificateStanislav Pilipenkoenergy_progress
04/17/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
04/07/2025Mechanical SystemsStanislav Pilipenkospecial
04/07/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
04/07/2025FinalStanislav Pilipenkoprogress
04/07/2025Sprinkler SystemsStanislav Pilipenkospecial
01/29/2025Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
01/29/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
Latest 25 of 43.