← Back
Office only, 7-19 stories
374 WEST 125 STREET
MANHATTAN · Morningside Heights · BIN 1087468
💬 Discuss this project
2002Year Built
9Stories
O3Building Class
C4-4DZoning
124,576 sfGross Floor Area
3Units
LL97 CoveredRent Stabilized5 Open Violations ▸FISP: SAFEFDNY Report ↗
Office only, 7-19 stories · 13,690 sf lot · 9.1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Roof2p · 1 filing · 10 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEPARTMENT OF EDUCATION203/22/2026
OWNER OF 386 WEST 125 ST103/22/2026
THE OWNER OF503/22/2026
RGX CORP3903/22/2026
RGX CORP. GERSHON+55 S103/22/2026
SQUARE DEMOLITION CORP603/22/2026
OWNER OF RGX CORP503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAND ENGINEERING & ARCHITECTURE DPC212/11/2024
TSF ENGINEERING, PC308/14/2023
GMH ARCHITECTURE PLLC108/11/2023
WELLWORTH CONSULTING LLC104/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GMH ARCHITECTURE603/21/2026
JULIAN A. GOMEZ403/21/2026
PREEMPTIVE SOLUTIONS & CONSULTING L203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PACE PLUMBING CORPPlumbing407/08/2026
COMMERCIAL ELECT CONT INC 001787General Contractor303/22/2026
SPRING SCAFFOLDING LLCGeneral Contractor303/21/2026
PACE PLUMBINGPlumbing303/22/2026
VERUS INCGeneral Contractor207/08/2026
DNA CONTRACTING LLCGeneral Contractor203/21/2026
PACE PLUMBING CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAND ENGINEERING & ARCHIT266212/11/2024
TSF ENGINEERING, PC1274308/14/2023
GM HUANG ARCHITECTURE PLL1398108/11/2023
Building Lifecycle
All (116)Filed (7)Permit Issued (6)Signed Off (6)Facade (FISP) (6)Violation (60)Inspection (5)Special Inspection (26)
12/18/2024
Signed off — Alteration
8th Cycle Facade Repair program. No change to use, egress or occupancy.
M00732584-I1
12/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Monroe
12/18/2024
Special inspection requirement — Masonry
John Monroe
12/18/2024
Special inspection requirement — Air barrier - visual inspection
John Monroe
12/18/2024
Special inspection requirement — Final
John Monroe
12/18/2024
Special inspection requirement — Energy Code Compliance Inspections
John Monroe
12/18/2024
Special inspection requirement — Post-installed Anchors
John Monroe
12/11/2024
Filed — Alteration
8th Cycle Facade Repair program. No change to use, egress or occupancy.
M00732584-P1
06/27/2024
Signed off — Alteration
Interior renovation of existing commercial space as per plan filed herewith. No change in use, egress, or occupancy under this application
M00907284-S1
06/27/2024
Signed off — Alteration
Interior renovation of existing commercial space as per plan filed herewith. No change in use, egress, or occupancy under this application
M00907284-I1
06/21/2024
Signed off — Alteration
Interior renovation of existing commercial space as per plan filed herewith. No change in use, egress, or occupancy under this application
M00907284-S2
06/21/2024
Signed off — Alteration
Interior renovation of existing commercial space as per plan filed herewith. No change in use, egress, or occupancy under this application
M00907284-S3
05/28/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/28/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/21/2024
Cycle 9 facade report submitted
01/24/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/19/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/16/2024
Violation issued (FDNY_NOV, closed)
01/10/2024
Cycle 9 facade report signed — SAFE
01/04/2024
Special inspection requirement — Air barrier - visual inspection
John Monroe
01/04/2024
Special inspection requirement — Final
John Monroe
01/04/2024
Special inspection requirement — Masonry
John Monroe
01/04/2024
Special inspection requirement — Post-installed Anchors
John Monroe
01/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Monroe
01/04/2024
Special inspection requirement — Energy Code Compliance Inspections
John Monroe
12/27/2023
Cycle 9 facade inspection completed
11/20/2023
Signed off — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00863577-I1
10/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/31/2023
Permit issued — General Construction
M00907284-I1-GC
08/30/2023
Permit issued — Mechanical Systems
M00907284-S1-MS
08/30/2023
Permit issued — Sprinklers
M00907284-S3-EW-SP
08/30/2023
Permit issued — Plumbing
M00907284-S2-PL
08/18/2023
Violation issued (ECB, closed)
Construction
08/14/2023
Filed — Alteration
Interior renovation of existing commercial space as per plan filed herewith. No change in use, egress, or occupancy under this application
M00907284-S1
08/14/2023
Filed — Alteration
Interior renovation of existing commercial space as per plan filed herewith. No change in use, egress, or occupancy under this application
M00907284-S2
08/11/2023
Filed — Alteration
Interior renovation of existing commercial space as per plan filed herewith. No change in use, egress, or occupancy under this application
M00907284-I1
08/11/2023
Filed — Alteration
Interior renovation of existing commercial space as per plan filed herewith. No change in use, egress, or occupancy under this application
M00907284-S3
07/27/2023
Special inspection requirement — Shutoff dampers
Nicholas Tucci
07/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
Nicholas Tucci
07/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
Nicholas Tucci
07/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Tucci
07/27/2023
Special inspection requirement — Duct leakage testing, insulation and design
Nicholas Tucci
07/27/2023
Special inspection requirement — Maintenance information
Nicholas Tucci
07/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Tucci
07/21/2023
Special inspection requirement — Interior lighting power
George Huang
07/21/2023
Special inspection requirement — Lighting controls
George Huang
07/20/2023
Special inspection requirement — Energy Code Compliance Inspections
George Huang
07/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
George Huang
07/20/2023
Special inspection requirement — Final
George Huang
07/20/2023
Special inspection requirement — Final
Nicholas Tucci
07/20/2023
Special inspection requirement — Mechanical Systems
Nicholas Tucci
05/11/2023
Permit issued — General Construction
M00732584-I1-GC
05/03/2023
Filed — Alteration
8th Cycle Facade Repair program. No change to use, egress or occupancy.
M00732584-I1
04/24/2023
Filed — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00863577-I1
04/24/2023
Permit issued — Sidewalk Shed
M00863577-I1-SH
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/24/2022
Violation issued (ECB, closed)
Construction
06/24/2022
Violation issued (ECB, closed)
Construction
12/21/2021
Violation issued (FDNY_NOV, closed)
01/21/2020
Cycle 8 facade report submitted
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offVERUS INC08/31/2023
DOB NOWMechanical SystemsSigned-offVERUS INC08/30/2023
DOB NOWSprinklersSigned-offMANENGEERING BUREAU, INC08/30/2023
DOB NOWPlumbingSigned-offPACE PLUMBING CORP08/30/2023
DOB NOWGeneral ConstructionSigned-offPAUL CHARLTON05/11/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC04/24/2023
BISSDISSUEDWDF INC03/10/2015
BISSDISSUEDWDF, INC.DBA WDF FEDERATE10/30/2013
BISPLISSUEDPAR PLUMBING CO., INC03/12/2013
BISSPISSUEDFEDERATED CONTRACTING COR02/16/2012
BISSPISSUEDSKH MECHANICAL CORP12/20/2007
BISOTISSUEDLINMAR CONSTRUCTION CORP08/24/2007
BISMHISSUEDLINMAR CONSTRUCTION CORP08/24/2007
BISOTISSUEDLINMAR CONSTRUCTION CORP08/24/2007
BISOTISSUEDSPJ PIPING CORP.07/17/2006
BISMHISSUEDCHAMPION CONSTRUCTION CORP.04/27/2006
BISOTISSUEDCHAMPION CONSTRUCTION CORP.04/27/2006
BISSPISSUEDB,H, PLUMBING & HEATING CORP.02/17/2006
BISPLISSUEDB, H, PLUMBING & HEATING04/26/2005
BISSPISSUEDB,H, PLUMBING & HEATING CORP.04/26/2005
BISOTISSUEDLEXCORE ASSOCIATES04/21/2005
BISOTISSUEDLEXCORE ASSOCIATES03/18/2005
BISFSISSUEDUNFLAT ASSOC01/06/2004
BISSDISSUEDFEDERATED MECHANICAL CORP11/14/2003
BISBLISSUEDM.FARBMAN AND SONS INC10/31/2003
BIS—ISSUEDLENDLEASE(US)CONSTRUCTION07/17/2003
BISEQISSUEDLENDLEASE(US)CONSTRUCTION07/17/2003
BISEQISSUEDUNITED HOISTING CORP04/24/2003
BIS—ISSUEDLENDLEASE(US)CONSTRUCTION04/04/2003
BISEQISSUEDLENDLEASE(US)CONSTRUCTION04/04/2003
BISEQISSUEDUNITED HOISTING CORP04/03/2003
BISBLISSUEDM.FARBMAN AND SONS INC03/13/2003
BISEQISSUEDC RAIMONDO & SONS CONSTRUCTION02/03/2003
BISEQISSUEDUNITED HOISTING CORP10/01/2002
BISSPISSUEDFEDERATED MECHANICAL CORP09/20/2002
BISOTISSUEDC. RAIMONDO AND SONS CONSTRUCTIO08/09/2002
BISEQISSUEDC RAIMONDO & SONS CONSTRUCTION03/19/2002
BIS—ISSUEDC RAIMONDO & SONS CONSTRUCTION03/19/2002
BISEQISSUEDNY HOTEL TRADES COUNCIL & HOTEL04/20/2000
3 projects · most recent 09/18/2023
General Wiring
FiledStatusContractorScope
09/18/2023CompleteCOMMERCIAL ELECT CONT INCGeneral Wiring
04/14/2023CompleteTOP SHELF ELECTRIC CORP—
03/25/2020CompleteE-J ELEC. INSTALLATION COGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/28/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/28/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/24/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
12/18/2024Structural Stability – Alterations of existing buildingsJohn Monroespecial
12/18/2024MasonryJohn Monroespecial
12/18/2024Air barrier - visual inspectionJohn Monroeenergy_progress
12/18/2024FinalJohn Monroeprogress
12/18/2024Energy Code Compliance InspectionsJohn Monroeprogress
12/18/2024Post-installed AnchorsJohn Monroespecial
01/04/2024Air barrier - visual inspectionJohn Monroeenergy_progress
01/04/2024FinalJohn Monroeprogress
01/04/2024MasonryJohn Monroespecial
01/04/2024Post-installed AnchorsJohn Monroespecial
01/04/2024Structural Stability – Alterations of existing buildingsJohn Monroespecial
01/04/2024Energy Code Compliance InspectionsJohn Monroeprogress
07/27/2023Shutoff dampersNicholas Tuccienergy_progress
07/27/2023HVAC-R and service water heating system controlsNicholas Tuccienergy_progress
07/27/2023HVAC-R and service water heating equipmentNicholas Tuccienergy_progress
07/27/2023HVAC-R and service water piping design and insulationNicholas Tuccienergy_progress
07/27/2023Duct leakage testing, insulation and designNicholas Tuccienergy_progress
07/27/2023Maintenance informationNicholas Tuccienergy_progress
07/25/2023Fire-Resistant Penetrations and JointsNicholas Tuccispecial
07/21/2023Interior lighting powerGeorge Huangenergy_progress
07/21/2023Lighting controlsGeorge Huangenergy_progress
07/20/2023Energy Code Compliance InspectionsGeorge Huangprogress
07/20/2023Fire-Resistant Penetrations and JointsGeorge Huangspecial
07/20/2023FinalGeorge Huangprogress
07/20/2023FinalNicholas Tucciprogress
Latest 25 of 26.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/31/2026M00863577-I1Request digital key ↗
08/31/2026M00732584-P1Request digital key ↗
08/31/2026M00732584-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION6
04/03/2019103140753Open ↗
04/03/2019103140753Open ↗
03/27/2019103140753Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026M00732584-P1Open ↗
09/01/2026M00732584-P1Open ↗
08/30/2026M00907284-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/31/2026M00863577-I1Open ↗
08/31/2026M00732584-I1Open ↗
08/13/2026M00907284-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M00732584-P1Open ↗
08/30/2026M00907284-I1Open ↗
08/24/2026M00907284-S1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
04/03/2019103140753Open ↗
03/27/2019103140753Open ↗
03/01/2019103140753Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS1
09/26/2012121388774Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/14/2013121388774Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/06/2021103140753Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/06/2021103140753Open ↗
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM5
04/03/2019103140753Open ↗
03/27/2019103140753Open ↗
03/01/2019103140753Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET1
09/26/2012121388774Open ↗