133 WEST 19 STREET
MANHATTAN · Chelsea-Hudson Yards · BIN 1014728
💬 Discuss this project
1909Year Built
10Stories
O6Building Class
C6-3AZoning
33,210 sfGross Floor Area
14Units
LL97 Covered1 Open Violation ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: JERSEY STREET ASSOCITES · 3,687 sf lot · 9.01 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 8 docs
Floor 102p · 2 filings · 18 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MILTAN MANAGEMENT2407/08/2026
JERSEY STREET ASSOCIATES, LLC3803/22/2026
MILTON MANAGEMENT CORP103/22/2026
JERSEY ST ASSOCS203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PVE ENGINEERING101/07/2026
AG ENGINEERING PLLC103/12/2025
BROADWATER DESIGNS303/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SEAY-YARBROUGH803/21/2026
NORTHEAST EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WHARTON SMITH CONSTRUCTI*General Contractor207/08/2026
JOHN FRANCICAElectrical103/21/2026
SAFETECH ENTERPRISES CORPGeneral Contractor106/28/2026
JUST PLBG & HTG INCPlumbing107/08/2026
NEW YORK PARK PLBG&HTG COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARTRIDGE VENTURE ENGINEE7690101/07/2026
AG ENGINEERING PLLC8899203/12/2025
Building Lifecycle
All (92)Filed (5)Permit Issued (5)Signed Off (4)Facade (FISP) (12)Violation (49)Inspection (3)Special Inspection (14)
01/09/2026
Permit issued — General Construction
M01285911-I1-GC
01/07/2026
Filed — Alteration
PROPOSED EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01285911-I1
12/04/2025
Special inspection requirement — Air barrier - visual inspection
Marco Batista
12/04/2025
Special inspection requirement — Post-installed Anchors
ALAN DUDLEY
12/04/2025
Special inspection requirement — Masonry
ALAN DUDLEY
12/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Marco Batista
09/11/2025
Special inspection requirement — Final
Marco Batista
07/31/2025
Signed off — Alteration
Construction of existing pantry, 1 bathroom , 1 ada bathroom, and install new exhaust fans and minor duct work. plumbing filed under separate application. no change in use, egress or occupancy.
M01186574-S1
07/31/2025
Signed off — Alteration
Construction of existing pantry, 1 bathroom , 1 ada bathroom, and install new exhaust fans and minor duct work. plumbing filed under separate application. no change in use, egress or occupancy.
M01186574-I1
07/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/17/2025
Permit issued — General Construction
M01186574-I1-GC
04/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/04/2025
Permit issued — Plumbing
M01186574-S1-PL
03/12/2025
Filed — Alteration
Construction of existing pantry, 1 bathroom , 1 ada bathroom, and install new exhaust fans and minor duct work. plumbing filed under separate application. no change in use, egress or occupancy.
M01186574-S1
03/11/2025
Filed — Alteration
Construction of existing pantry, 1 bathroom , 1 ada bathroom, and install new exhaust fans and minor duct work. plumbing filed under separate application. no change in use, egress or occupancy.
M01186574-I1
02/25/2025
Signed off — Alteration
removal of existing partitions, doors, flooring, a.c. units and related ductwork, electrical components and plumbing fixtures. no change to use, egress or occupancy.
M01061361-S1
02/25/2025
Signed off — Alteration
removal of existing partitions, doors, flooring, a.c. units and related ductwork, electrical components and plumbing fixtures. no change to use, egress or occupancy.
M01061361-I1
02/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ARIEL GOLSHAN
02/25/2025
Special inspection requirement — Maintenance information
ARIEL GOLSHAN
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ARIEL GOLSHAN
02/25/2025
Special inspection requirement — Final
MICHAEL HORWITZ
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ARIEL GOLSHAN
02/25/2025
Special inspection requirement — Energy Code Compliance Inspections
ARIEL GOLSHAN
02/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
ARIEL GOLSHAN
02/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
ARIEL GOLSHAN
02/11/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/05/2024
Permit issued — Plumbing
M01061361-S1-PL
07/22/2024
Permit issued — General Construction
M01061361-I1-GC
07/15/2024
Filed — Alteration
removal of existing partitions, doors, flooring, a.c. units and related ductwork, electrical components and plumbing fixtures. no change to use, egress or occupancy.
M01061361-S1
07/15/2024
Filed — Alteration
removal of existing partitions, doors, flooring, a.c. units and related ductwork, electrical components and plumbing fixtures. no change to use, egress or occupancy.
M01061361-I1
06/04/2024
Special inspection requirement — Final
MICHAEL HORWITZ
12/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/22/2022
Cycle 9 facade inspection completed
08/18/2022
Cycle 9 facade report signed — SWARMP
02/20/2022
Cycle 9 facade report submitted
08/26/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/26/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/05/2019
Violation issued (ECB, closed)
Construction
05/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/10/2017
Cycle 8 facade report signed — SAFE
06/14/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/21/2017
Violation issued (ECB, closed)
Construction
02/21/2017
Cycle 8 facade report submitted
01/20/2017
Cycle 8 facade inspection completed
06/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/26/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/28/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/28/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/21/2012
Violation issued (ECB, closed)
Elevators
08/21/2012
Cycle 7 facade report submitted
08/20/2012
Cycle 7 facade report signed — SWARMP
07/15/2012
Cycle 7 facade inspection completed
02/27/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSAFETECH ENTERPRISES CORP01/09/2026
DOB NOWGeneral ConstructionSigned-offWHARTON SMITH CONSTRUCTI*04/17/2025
DOB NOWPlumbingSigned-offNEW YORK PARK PLBG&HTG CO04/04/2025
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK12/05/2024
DOB NOWGeneral ConstructionSigned-offWHARTON SMITH CONSTRUCTI*07/22/2024
BISOTISSUEDJRR CONTRACTING INC03/21/2019
BISOTISSUEDJRR CONTRACTING INC03/29/2018
BISPLISSUEDAQUA PLUMBING & HTNG CORP01/26/2018
BISSPISSUEDA&M WARSHAW SERVICES LLC12/18/2017
BISOTISSUEDSIGNATURE CONSTRUCTION GROUP12/05/2017
BISMHISSUEDYUKOS MECHANICAL INC09/28/2017
BISMHISSUEDINNSBRUCK INTERIORS LLC07/28/2017
BIS—ISSUEDSHASHI CONSTRUCTION CORP05/01/2017
BISMHISSUEDMETROPOLITAN MECH CORP09/06/2016
BISPLISSUEDMURRAY HILL PLBG & HTG IN08/26/2016
BISOTISSUEDINNSBRUCK RENOVATIONS,LLC08/19/2016
BISPLISSUEDMURRAY HILL PLBG & HTG IN08/08/2016
BISOTISSUEDINNSBRUCK RENOVATIONS,LLC07/26/2016
BIS—ISSUEDSHASHI CONSTRUCTION CORP04/27/2016
BISFBISSUEDCOMMERCIAL COMBUSTION SER05/12/2008
BISOTISSUEDWONDER WORKS CONSTR CORP02/07/2008
BISOTISSUEDWONDER WORKS CONSTR CORP12/31/2007
BISEQISSUEDROCKLEDGE SCAFFOLD CORP04/12/2006
BISOTISSUED19TH EMPIRE CONSTRUCTION C/O ALC01/20/2006
1 project · most recent 01/23/2018
General Wiring Lighting
FiledStatusContractorScope
01/23/2018CompleteGLENDALE ELECTL CONTNG INGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
12/04/2025Air barrier - visual inspectionMarco Batistaenergy_progress
12/04/2025Post-installed AnchorsALAN DUDLEYspecial
12/04/2025MasonryALAN DUDLEYspecial
12/04/2025Energy Code Compliance InspectionsMarco Batistaprogress
09/11/2025FinalMarco Batistaprogress
02/25/2025HVAC-R and service water piping design and insulationARIEL GOLSHANenergy_progress
02/25/2025Maintenance informationARIEL GOLSHANenergy_progress
02/25/2025Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
02/25/2025FinalMICHAEL HORWITZprogress
02/25/2025Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
02/25/2025Energy Code Compliance InspectionsARIEL GOLSHANprogress
02/25/2025HVAC-R and service water heating equipmentARIEL GOLSHANenergy_progress
02/25/2025HVAC-R and service water heating system controlsARIEL GOLSHANenergy_progress
06/04/2024FinalMICHAEL HORWITZprogress
▾Documents — 243 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026M01061361-I1Request digital key ↗
08/26/2026M01061361-S1Request digital key ↗
08/24/2026M01186574-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits48
▸BISPLAN / WORK APPROVAL APPLICATION24
10/02/2025122609542Open ↗
05/22/2024122609542Open ↗
05/09/2019123543843Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION23
11/01/2019123543843Open ↗
04/18/2019122609542Open ↗
03/22/2019122557722Open ↗
Showing 3 of 23 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/10/2017122609542Open ↗
▸Seals & Professional Certifications64
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION24
09/24/2018123543843Open ↗
04/30/2018140664635Open ↗
04/30/2018140664635Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
12/07/2017123177882Open ↗
07/11/2017140664635Open ↗
02/17/2017123020015Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
12/07/2017123177882Open ↗
07/25/2017122846974Open ↗
02/17/2017123020015Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M01186574-I1Open ↗
08/29/2026M01061361-I1Open ↗
08/25/2026M01186574-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026M01186574-I1Open ↗
08/24/2026M01186574-S1Open ↗
08/13/2026M01061361-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M01186574-I1Open ↗
08/25/2026M01186574-S1Open ↗
08/24/2026M01285911-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/03/2008110143069Open ↗
Showing 1 of 2 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/11/2017140664635Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/11/2017140664635Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
04/06/2018140664635Open ↗
12/07/2017123177882Open ↗
07/21/2016122837957Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
09/06/2017122123816Open ↗
08/11/2017122123816Open ↗
▸BISEQUIPMENT USE PERMITS1
11/02/2017122846974Open ↗
▸BISSCHEDULE B - PLUMBING1
07/11/2017140664635Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
11/02/2017122846974Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
10/13/2016122557722Open ↗
▸BISSTREET TREE CHECKLIST1
02/29/2016122609542Open ↗
▸Environmental & Asbestos16
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
07/11/2017140664635Open ↗
02/17/2017123020015Open ↗
10/13/2016122557722Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026M01186574-S1Open ↗
08/24/2026M01186574-I1Open ↗
08/13/2026M01061361-S1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS INSPECTION REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance26
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
09/24/2018123543843Open ↗
04/30/2018140664635Open ↗
04/30/2018140664635Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
05/09/2018123177882Open ↗
04/30/2018140664635Open ↗
01/18/2018122862161Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/21/2020123543843Open ↗
07/28/2017140664635Open ↗
07/11/2017140664635Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/11/2017140664635Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/21/2020123543843Open ↗
07/28/2017140664635Open ↗
07/11/2017140664635Open ↗
▸Approvals, Objections & Sign-offs18
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
05/09/2018123177882Open ↗
04/30/2018140664635Open ↗
01/18/2018122862161Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
04/18/2019122609542Open ↗
03/21/2019122609542Open ↗
11/25/2015122609542Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/12/2018123543843Open ↗
10/20/2008110055975Open ↗
▸BISSUPERSEDING LETTER1
12/26/2017140664635Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT20
07/21/2020123543843Open ↗
09/24/2018123543843Open ↗
05/09/2018123177882Open ↗
Showing 3 of 20 on file for this type
▸Filing & Intake Forms28
▸BISBOROUGH INTAKE FORM10
03/21/2019122609542Open ↗
05/09/2018123177882Open ↗
04/30/2018140664635Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION9
11/07/2018122557722Open ↗
10/13/2017122862161Open ↗
07/25/2017122846974Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET8
09/24/2018123543843Open ↗
12/07/2017123177882Open ↗
02/17/2017123020015Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/11/2017140664635Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
06/14/2019123543843Open ↗
09/24/2018123543843Open ↗
10/12/2011110143069Open ↗
▸BISPLOT DIAGRAM1
11/25/2015122609542Open ↗