← Back
Public elementary, junior or senior high
P.S. 134 George F. Bristow
1330 BRISTOW STREET · BIN 2010273
💬 Discuss this project
1931Year Built
3Stories
W1Building Class
R7-1Zoning
53,252 sfGross Floor Area
1Units
LL97 Covered14 Open Violations 2 unresolved · 12 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 94,000 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Roof7p · 1 filing · 20 docs
Floor 33p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar4p · 1 filing · 20 docs
1 job · most recent 06/17/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/17/2026——Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Ventilation
Lg ARVU063ZEA2 450 CFM · Vrf Outdoor ×43
Brd DBV040 77,612 BTU · Fan Coil Indoor ×61
BDV040 60,058 BTU · Fan Coil Indoor ×2
Greenheck CUBE-200-15 3,700 CFM · Exhaust Fan ×2
GB-097-3 130 CFM · Exhaust Fan ×2
GB-140-4 1,100 CFM · Exhaust Fan ×2
GB-140-5 1,475 CFM · Exhaust Fan ×2
GB-140-7 2,000 CFM · Exhaust Fan ×2
GB-220-7 3,410 CFM · Exhaust Fan ×2
Magic-Aire MAUV-3 480 CFM · Vav Box ×4
MAUV-4 900 CFM · Vav Box ×3
MAUV-1 335 CFM · Heat Pump Outdoor ×2
__Junk__ DBV040 57,461 BTU · Fan Coil Indoor ×1
Cooling
Jetson (9) ACCM-030 250 tons · Air Cooled Chiller ×18
Annexair AHU-E-09-HE-D-HR-SS-AZP48.4 9,000 CFM ×6
ERP-E-09-EW03-HE-D-HR-SS-AZP40.4 10,500 CFM ×6
ERP-E-04-EW03-HE-D-HR-SS-AZP14.2 4,400 CFM · Fan Coil Indoor ×4
Heat / Cool
Lg PLFY-EL 12NEMU-A 2 tons · Vrf Indoor ×16
MXZ-SM48NL 4 tons · Vrf Outdoor ×2
MXZ-SM60NL 5 tons · Vrf Outdoor ×2
ARDE-212-52D-20A-1-A1 20 tons · Doas ×1
Mitsubishi Electric PUZ-AK36NL 3 tons · Heat Pump Outdoor ×8
PKA-AK36NL 3 tons · Vrf Indoor ×6
PK4-AK36NL 3 tons · Vrf Indoor ×2
1 job · most recent 06/17/2026
FiledStatusContractorScope
06/17/2026——44 heads
1 job · most recent 06/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/17/2026——Gas, Water/Sanitary
8 jobs · most recent 09/16/2025
General Wiring
FiledStatusContractorScope
09/16/2025CompleteMETROPOLITAN ELEC OF NY IGeneral Wiring
12/02/2024CompleteEVEREST ELECTRIC CORP—
11/13/2023Permit IssuedANCO ELECTL CONTCTNG INCGeneral Wiring
11/03/2023CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
08/16/2023CompleteCHARAN ELEC'L ENTERP'S IN—
05/01/2023CompleteVENTURE HOME SOLAR LLC1 meters
11/10/2020CompleteJ&H ELECTRICAL CONT INCGeneral Wiring
08/14/2019CompleteMECHANICAL ELECTR'L CORP.General Wiring
1 job · most recent 06/17/2026
Steel Masonry
FiledStatusContractorScope
06/17/2026——Steel, Masonry
Building Lifecycle
All (117)Filed (11)Violation (60)Objection (16)Special Inspection (30)
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
07/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
07/22/2026
Special inspection requirement — Heating Systems
GEORGE GHEBRYAL
07/22/2026
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
07/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
07/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
07/20/2026
Special inspection requirement — Maintenance information
07/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/20/2026
Special inspection requirement — Energy Code Compliance Inspections
07/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/20/2026
Special inspection requirement — Electrical motors and elevators
07/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/20/2026
Special inspection requirement — Heating Systems
07/20/2026
Special inspection requirement — Duct leakage testing, insulation and design
07/20/2026
Special inspection requirement — Post-installed Anchors
07/20/2026
Special inspection requirement — Shutoff dampers
07/20/2026
Special inspection requirement — Mechanical Systems
07/20/2026
Special inspection requirement — Final
07/13/2026
Violation issued (ECB, open)
Construction
07/13/2026
Violation issued (ECB, open)
Construction
07/13/2026
Violation issued (ECB, open)
Construction
07/13/2026
Violation issued (ECB, open)
Construction
07/13/2026
Violation issued (ECB, open)
Construction
06/17/2026
Filed — Alteration
Removal of the existing oil fired steam heating plant including oil tanks and ancillary equipment including all work associated with removal of existing equipment Provide two (2) new electrical Boilers.
X01109712-P2
06/17/2026
Filed — Alteration
Removal of the existing oil fired steam heating plant including oil tanks and ancillary equipment including all work associated with removal of existing equipment Provide two (2) new electrical Boilers.
X01109712-P3
06/17/2026
Objection raised — Other
06/17/2026
Objection raised — Other
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/15/2026
Special inspection requirement — Electrical motors and elevators
06/15/2026
Special inspection requirement — Heating Systems
06/15/2026
Special inspection requirement — Maintenance information
06/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/15/2026
Special inspection requirement — Shutoff dampers
06/15/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/15/2026
Special inspection requirement — Final
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
05/01/2026
Filed — Alteration
Removal of the existing oil fired steam heating plant including oil tanks and ancillary equipment including all work associated with removal of existing equipment Provide two (2) new electrical Boilers.
X01109712-P1
12/20/2025
Violation issued (FDNY_NOV, closed)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/27/2025
Violation issued (ECB, closed)
Construction
10/27/2025
Violation issued (ECB, open)
Construction
10/27/2025
Violation issued (ECB, open)
Construction
10/27/2025
Violation issued (ECB, open)
Construction
08/08/2025
Objection resolved — Addressed
07/22/2025
Violation issued (FDNY_ORDER, closed)
07/22/2025
Violation issued (FDNY_ORDER, closed)
07/22/2025
Violation issued (FDNY_ORDER, closed)
07/22/2025
Violation issued (FDNY_ORDER, closed)
05/07/2025
Filed — Alteration
Removal of the existing oil fired steam heating plant including oil tanks and ancillary equipment including all work associated with removal of existing equipment Provide two (2) new electrical Boilers.
X01109712-S8
05/07/2025
Objection resolved — Addressed
05/07/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/05/2025
Filed — Alteration
Removal of the existing oil fired steam heating plant including oil tanks and ancillary equipment including all work associated with removal of existing equipment Provide two (2) new electrical Boilers.
X01109712-S6
05/05/2025
Filed — Alteration
Removal of the existing oil fired steam heating plant including oil tanks and ancillary equipment including all work associated with removal of existing equipment Provide two (2) new electrical Boilers.
X01109712-S7
05/05/2025
Objection raised — Other
05/05/2025
Objection raised — Other
Latest 60 of 117 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION1303/22/2026
DEPT OF EDUCATION PS 134403/22/2026
DEPT OF EDUCATION PS134 0203/22/2026
P.S.134 D.O.E.903/22/2026
P.S.134 MINI SCHOOL D.O.E403/22/2026
DOE P.S. 134603/22/2026
DOE PS 134 MINI203/22/2026
DEPT. OF EDUCATION 0103/22/2026
C.S. 134 D.O.E.203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY806/17/2026
NYC SCHOOL CONSTRUCTION205/01/2026
VICKI LAM101/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JASON SAMPOGNAElectrical203/21/2026
CEDOMIR MARAElectrical203/21/2026
ANTHONY COMOElectrical203/21/2026
FRANCIS RICHARDSElectrical103/21/2026
MULVIHILL, FElectrical103/21/2026
SURAJ RAMDEOElectrical103/21/2026
BORRIS, CLARENCEElectrical103/21/2026
FEITON, JOSEPHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106605/05/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDVARSITY PLBG AND HTG INC10/15/2024
BISPLISSUEDVARSITY PLBG AND HTG INC10/17/2023
BISOTISSUEDJAYSAN CONTRACTING CORP12/08/2022
BISOTISSUEDJAYSAN CONTRACTING CORP12/01/2022
BISPLISSUEDVARSITY PLBG AND HTG INC10/24/2022
BISOTISSUEDVENTURE HOME SOLAR LLC08/10/2022
BISOTISSUEDJAYSAN CONTRACTING CORP11/09/2021
BISPLISSUEDVARSITY PLBG AND HTG INC10/29/2021
BISPLISSUEDVARSITY PLBG AND HTG INC10/30/2020
BISOTISSUEDJAYSAN CONTRACTING CORP08/17/2020
BISOTISSUEDJAYSAN CONTRACTING CORP11/18/2019
BISEQISSUEDENVIROTRAC LTD06/05/2017
BISOTISSUEDFIVE STAR ELECTRIC CORP06/26/2014
BISOTISSUEDABAX INC02/05/2014
BISOTISSUEDABAX INC12/23/2013
BISPLISSUEDMAR-SAL PLBG & HTG, INC09/09/2013
BISMHISSUEDJ & A CONTRACTORS CORP08/27/2013
BISEQISSUEDABAX INC12/28/2012
BISEQISSUEDABAX INC12/28/2012
BISOTISSUEDABAX INC12/28/2012
BISOTISSUEDABAX INC12/28/2012
BISEQISSUEDABAX INC12/28/2012
BISOTISSUEDABAX INC09/11/2012
BISOTISSUEDABAX INC09/11/2012
BISPLISSUEDMAR-SAL PLBG & HTG, INC09/11/2012
BISMHISSUEDJ & A CONTRACTORS CORP09/11/2012
BISEQISSUEDABAX INC08/16/2012
BISEQISSUEDABAX INC08/16/2012
BISEQISSUEDABAX INC08/16/2012
BISPLISSUEDJAM SERVICE CO., INC06/01/2007
BISOTISSUEDNPORT CONSTRUCTION CORP05/01/2007
BISOTISSUEDPROTO CONSTRUCTION & DEVELOPMENT05/02/2006
BISOTISSUEDPROTO CONSTRUCTION & DEVELOPMENT05/02/2006
BISEQISSUEDLIBERTY ARCHITECTURAL PRODUCTS12/23/2005
BISOTISSUEDPROTO CONSTRUCTION & DEVELOPMENT03/31/2005
BISOTISSUEDPROTO CONSTRUCTION & DEVELOPMENT03/31/2005
BISEQISSUEDPROTO CONSTRUCTION INCORPORATED03/31/2005
BISEQISSUEDPROTO CONSTRUCTION INCORPORATED03/18/2004
BISOTISSUEDPROTO CONSTRUCTION & DEVELOPMENT03/18/2004
BISOTISSUEDPROTO CONSTRUCTION & DEVELOPMENT03/18/2004
+ 10 more permits on file
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
07/22/2026HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
07/22/2026HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
07/22/2026Heating SystemsGEORGE GHEBRYALspecial
07/22/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
07/22/2026Maintenance informationGEORGE GHEBRYALenergy_progress
07/22/2026HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
07/20/2026Electrical motors and elevators—energy_progress
07/20/2026HVAC-R and service water heating system controls—energy_progress
07/20/2026Final—progress
07/20/2026Maintenance information—energy_progress
07/20/2026Shutoff dampers—energy_progress
07/20/2026Duct leakage testing, insulation and design—energy_progress
07/20/2026HVAC-R and service water piping design and insulation—energy_progress
07/20/2026HVAC-R and service water heating equipment—energy_progress
07/20/2026Mechanical Systems—special
07/20/2026Heating Systems—special
07/20/2026Post-installed Anchors—special
07/20/2026Energy Code Compliance Inspections—progress
07/20/2026Fire-Resistant Penetrations and Joints—special
06/15/2026HVAC-R and service water heating system controls—energy_progress
06/15/2026Duct leakage testing, insulation and design—energy_progress
06/15/2026HVAC-R and service water piping design and insulation—energy_progress
06/15/2026Maintenance information—energy_progress
06/15/2026HVAC-R and service water heating equipment—energy_progress
06/15/2026Electrical motors and elevators—energy_progress
Latest 25 of 74.
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/16/2026X01109712-S6Request digital key ↗
08/16/2026X01109712-S5Request digital key ↗
08/16/2026X01109712-S4Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
07/31/2022240306904Open ↗
▸BISWORK PERMIT APPLICATION1
08/10/2022240306904Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/16/2026X01109712-S6Open ↗
08/16/2026X01109712-S5Open ↗
08/16/2026X01109712-S4Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026X01109712-S2Open ↗
08/31/2026X01109712-S8Open ↗
08/29/2026X01109712-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026X01109712-S2Open ↗
08/31/2026X01109712-S8Open ↗
08/29/2026X01109712-S3Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/31/2022240306904Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/31/2022240306904Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/31/2022240306904Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/10/2022240306904Open ↗
07/31/2022240306904Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/27/2023240306904Open ↗
07/31/2022240306904Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/27/2023240306904Open ↗
▸BISNYCECC ANALYSIS1
07/31/2022240306904Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/31/2022240306904Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
05/27/2023240306904Open ↗
05/27/2023240306904Open ↗
07/31/2022240306904Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs27
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/16/2026X01109712-P1Open ↗
08/15/2026X01109712-P2Open ↗
08/15/2026X01109712-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
08/16/2026X01109712-P1Open ↗
08/15/2026X01109712-P2Open ↗
08/15/2026X01109712-P3Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/30/2023240306904Open ↗
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)1
05/27/2023240306904Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
07/31/2022240306904Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/27/2023240306904Open ↗
07/31/2022240306904Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/31/2022240306904Open ↗
▸Other Documents15
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal15
08/16/2026X01109712-P1Open ↗
08/16/2026X01109712-S8Open ↗
08/16/2026X01109712-S1Open ↗
Showing 3 of 15 on file for this type