← Back
Five to six families
1332 STERLING PLACE
BROOKLYN · BIN 3036752
💬 Discuss this project
1907Year Built
3Stories
C2Building Class
R6Zoning
6,006 sfGross Floor Area
6Units
Rent Stabilized29 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: 1332 STERLING LLC · 3,167 sf lot · 1.9 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire ProtectionGeneral
Roof19p · 1 filing · 20 docs
Floor 320p · 1 filing · 20 docs
Floor 216p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Cellar18p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1332 STERLING LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/07/2023$1.2M—LORD & BROWN REALTY, LLC → 1332 STERLING LLC$200/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LESTER KATZ, NCARB611/14/2024
VASILIOS ARTEMIOU PE103/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)703/21/2026
XPDITE GROUP LLC 104503/21/2026
XPDITE GROUP LLC 105103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JHZ CONSULTING SERVICES *General Contractor207/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616711/14/2024
Building Lifecycle
All (143)Filed (7)Permit Issued (4)Signed Off (3)Violation (60)Inspection (11)Objection (28)Special Inspection (30)
05/06/2026
Violation issued (HPD, closed)
A
07/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/13/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/13/2025
Violation issued (HPD, open)
B
05/06/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/13/2025
Violation issued (HPD, closed)
C
12/17/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
12/17/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
12/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
12/17/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
12/17/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
12/17/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
12/17/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
12/17/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
12/17/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
12/17/2024
Special inspection requirement — Metering
FAHAD FATEH
12/13/2024
Signed off — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION B00988082-I1
B00988082-S1
12/09/2024
Objection resolved — Addressed
11/28/2024
Objection resolved — Addressed
11/25/2024
Objection raised — Other
11/25/2024
Objection raised — Fire_Protection
11/19/2024
Signed off — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION B00988082-I1
B00988082-S3
11/14/2024
Filed — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION B00988082-I1
B00988082-P3
11/14/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
11/14/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
11/14/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
11/14/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
11/14/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
11/14/2024
Special inspection requirement — Metering
FAHAD FATEH
11/14/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
11/14/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
11/14/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
11/14/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/14/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
10/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/27/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
09/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/27/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/27/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
09/27/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/18/2024
Filed — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION B00988082-I1
B00988082-P2
09/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/18/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
09/11/2024
Signed off — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION B00988082-I1
B00988082-S2
08/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/22/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/20/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/20/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/12/2024
Filed — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION B00988082-I1
B00988082-P1
08/02/2024
Permit issued — Sprinklers
B00988082-S3-EW-SP
06/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/20/2024
Permit issued — Mechanical Systems
B00988082-S2-MS
06/17/2024
Permit issued — General Construction
B00988082-I1-GC
06/05/2024
Permit issued — Plumbing
B00988082-S1-PL
05/30/2024
Objection resolved — Addressed
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL08/02/2024
DOB NOWMechanical SystemsSigned-offJHZ CONSULTING SERVICES *06/20/2024
DOB NOWGeneral ConstructionPermit IssuedJHZ CONSULTING SERVICES *06/17/2024
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR06/05/2024
1 project · most recent 11/14/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/14/2024Signed-offJHZ CONSULTING SERVICES *Heating and Air Conditioning Systems
Heat / Cool
Daikin 4MXS36WMVJU9 36,600 BTU · Split System ×20
1 project · most recent 11/14/2024
Sprinkler System
FiledStatusContractorScope
11/14/2024Signed-offDYNAMIC PLBNG & SPRKR CORSprinkler System
1 project · most recent 11/14/2024
Gas Water/Sanitary
FiledStatusContractorScope
11/14/2024Signed-offINFINITI ESC PLUMBING CORGas, Water/Sanitary
1 project · most recent 10/08/2024
General Wiring
FiledStatusContractorScope
10/08/2024CompleteFRIED ELECTRIC CO.General Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
07/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/13/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/06/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/17/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/22/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/20/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/24/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
12/17/2024Fenestration air leakageFAHAD FATEHenergy_progress
12/17/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
12/17/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/17/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
12/17/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
12/17/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
12/17/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
12/17/2024Interior lighting powerFAHAD FATEHenergy_progress
12/17/2024Maintenance informationFAHAD FATEHenergy_progress
12/17/2024Fenestration areasFAHAD FATEHenergy_progress
12/17/2024MeteringFAHAD FATEHenergy_progress
11/14/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
11/14/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
11/14/2024Maintenance informationFAHAD FATEHenergy_progress
11/14/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
11/14/2024Fenestration air leakageFAHAD FATEHenergy_progress
11/14/2024MeteringFAHAD FATEHenergy_progress
11/14/2024Fenestration areasFAHAD FATEHenergy_progress
11/14/2024Interior lighting powerFAHAD FATEHenergy_progress
11/14/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
11/14/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
11/14/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
09/27/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
09/27/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/27/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
Latest 25 of 43.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026B00988082-P2Request digital key ↗
08/25/2026B00988082-P1Request digital key ↗
08/25/2026B00988082-S3Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00988082-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature10
09/28/2026B00988082-S1Open ↗
09/28/2026B00988082-S1Open ↗
08/30/2026B00988082-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026B00988082-S3Open ↗
08/25/2026B00988082-P3Open ↗
08/25/2026B00988082-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/28/2026B00988082-S1Open ↗
08/30/2026B00988082-P3Open ↗
08/28/2026B00988082-P2Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/15/2026B00988082-P3Open ↗
08/14/2026B00988082-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026B00988082-S2Open ↗
08/25/2026B00988082-P2Open ↗
08/25/2026B00988082-P1Open ↗
Showing 3 of 7 on file for this type
▸Other Documents9
▸DOB NOWDHCR Document7
08/13/2026B00988082-S1Open ↗
08/13/2026B00988082-I1Open ↗
08/13/2026B00988082-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification2
08/15/2026B00988082-P3Open ↗
08/14/2026B00988082-I1Open ↗