← Back
Two stories - detached, small or mid-size
133-28 147 STREET
QUEENS · Baisley Park · BIN 4263009
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3AZoning
1,440 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,450 sf lot · 0.59 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbing
Floor 213p · 1 filing · 14 docs
Floor 19p · 1 filing · 14 docs
Sub-Basement3p · 1 filing · 14 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/19/2021$482K—Private party → Private party$335/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREYSTONE ENGINEERING CONSULTING,PC209/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADRIAN WYSOCKI203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CELTIC CONSTRUCTION IIGeneral Contractor203/21/2026
COURTESY PLUMBING INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREYSTONE ENGINEERING CON2973309/08/2022
Building Lifecycle
All (15)Filed (2)Permit Issued (3)Inspection (4)Special Inspection (6)
12/06/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/20/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/16/2022
Permit issued — Plumbing
Q00735954-S1-PL
11/16/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/19/2022
Permit issued — Plumbing
Q00735954-S1-PL
09/08/2022
Filed — Alteration
SUBSEQUENT FILING FOR MECHANICAL ELECTRIC 'SPLIT SYSTEMS' HEAT PUMPS HEATING & CONDITIONS. THE HEAT PUMPS SHALL PROVIDE ALL HEATING & Air conditioning FOR THE HOME.
Q00735954-S1
08/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
TIMOTHY TWEEDY
06/15/2022
Permit issued — General Construction
Q00735954-I1-GC
06/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
TIMOTHY TWEEDY
06/09/2022
Filed — Alteration
SUBSEQUENT FILING FOR MECHANICAL ELECTRIC 'SPLIT SYSTEMS' HEAT PUMPS HEATING & CONDITIONS. THE HEAT PUMPS SHALL PROVIDE ALL HEATING & Air conditioning FOR THE HOME.
Q00735954-I1
06/01/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
TIMOTHY TWEEDY
06/01/2022
Special inspection requirement — Final
TIMOTHY TWEEDY
06/01/2022
Special inspection requirement — Fire-Resistance Rated Construction
TIMOTHY TWEEDY
06/01/2022
Special inspection requirement — Energy Code Compliance Inspections
TIMOTHY TWEEDY
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedEDGECOMBE PLBG & HTG INC11/16/2022
DOB NOWPlumbingPermit IssuedEDGECOMBE PLBG & HTG INC09/19/2022
DOB NOWGeneral ConstructionPermit IssuedCELTIC CONSTRUCTION II06/15/2022
BISOTISSUEDKAMTECH RESTORATION CORP02/03/2023
1 project · most recent 09/08/2022
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/08/2022Permit IssuedCELTIC CONSTRUCTION IIHeating and Air Conditioning Systems
Heat / Cool
Blueridge BM48M22C-9C-9C-9C-9C Alpine Home Air Products Mini Split with 5 Cassettes. Heat Pump and Air Conditioning. 48,000 BTU · Heat Pump Outdoor ×2
2 projects · most recent 04/19/2023
General Wiring
FiledStatusContractorScope
04/19/2023CompleteBERGER QUALITY ELEC'L CON—
09/26/2022CompleteCOLE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/06/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/20/2023Fail-Final CND-Occupancy InspectionFailView ↗
11/16/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/30/2022Fire-Resistant Penetrations and JointsTIMOTHY TWEEDYspecial
06/10/2022Fire-Resistant Penetrations and JointsTIMOTHY TWEEDYspecial
06/01/2022Structural Stability – Alterations of existing buildingsTIMOTHY TWEEDYspecial
06/01/2022FinalTIMOTHY TWEEDYprogress
06/01/2022Fire-Resistance Rated ConstructionTIMOTHY TWEEDYprogress
06/01/2022Energy Code Compliance InspectionsTIMOTHY TWEEDYprogress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026Q00735954-I1Request digital key ↗
08/25/2026Q00735954-S2Request digital key ↗
08/25/2026Q00735954-S1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
02/02/2023440768046Open ↗
▸BISWORK PERMIT APPLICATION1
02/03/2023440768046Open ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature4
08/31/2026Q00735954-I1Open ↗
08/31/2026Q00735954-I1Open ↗
08/31/2026Q00735954-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026Q00735954-I1Open ↗
08/31/2026Q00735954-I1Open ↗
08/30/2026Q00735954-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q00735954-S1Open ↗
08/13/2026Q00735954-S2Open ↗
08/13/2026Q00735954-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/02/2023440768046Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/02/2023440768046Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
02/03/2023440768046Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026Q00735954-I1Open ↗
08/13/2026Q00735954-S2Open ↗
08/13/2026Q00735954-S1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/02/2023440768046Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/13/2023440768046Open ↗
02/02/2023440768046Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/02/2023440768046Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/13/2023440768046Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
02/02/2023440768046Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
06/13/2023440768046Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/13/2023440768046Open ↗
02/02/2023440768046Open ↗
▸Approvals, Objections & Sign-offs2
▸BISFINAL ELECTRICAL SIGNOFF1
06/16/2023440768046Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/16/2023440768046Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/13/2023440768046Open ↗
02/02/2023440768046Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
02/02/2023440768046Open ↗
▸Other Documents1
▸BISTax Abatement Miscellaneous1
06/16/2023440768046Open ↗