Elevator cooperative
Lenox Manor
1334 3 AVENUE · BIN 1043178
💬 Discuss this project
1957Year Built
17Stories
D4Building Class
C1-9Zoning
215,106 sfGross Floor Area
173Units
LL97 CoveredRent Stabilized43 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: LENOX MANOR OWNERS CORP · 17,875 sf lot · 12.03 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Roof3p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 2
Floor 113p · 3 filings · 20 docs
Cellar2p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SUTTON GARRETT REALTY1109/12/2026
720-730 FORT WASHINGTON AVE OWNERS2707/08/2026
CEPRINE CONSTRUCTION707/08/2026
LENOX MANOR OWNERS6103/22/2026
QUALITY BLGE CONSTRUCTION103/22/2026
GUMLEY HAFT1403/22/2026
REILLY MTGE GROUP INC103/22/2026
BROWN HARRIS STEVENS103/22/2026
LENOX MONAR OWNERS CORP103/22/2026
DVM INDUSTRIES LLC103/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACA ASSOCIATES203/21/2026
L & J DESIGN GROUP603/21/2026
NEW YORK SIGN CONSULTANTS203/21/2026
CLARKE CONSTRUCTION CONSULTANTS103/21/2026
S M EXPEDITING803/21/2026
H J BUILDING CONSULTING403/21/2026
DESARNO ASSOCIATES403/21/2026
J A EXPEDITING403/21/2026
EA DESIGN GROUP1203/21/2026
KAZAM CONSULTANTS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RENO DESIGN NY LLCGeneral Contractor603/21/2026
HARDESTY & ASSOCIATES, INGeneral Contractor603/21/2026
CEPRINE CONSTRUCTION INCGeneral Contractor507/08/2026
MARLEX MANAGEMENT INCGeneral Contractor407/08/2026
INTEGRAL CONTRACTING SERGeneral Contractor303/21/2026
MASTER 2 PLBG & HTG INCPlumbing307/08/2026
SHANE WALTERSGeneral Contractor303/21/2026
HIGHLEVEL GROUP INCGeneral Contractor303/21/2026
ASTORIA P & H CORPPlumbing207/08/2026
BALATON CONSULTING LLCScaffold207/08/2026
PAM AIR CONDITIONING INCGeneral Contractor203/21/2026
V.P. CONSTRUCTION INCGeneral Contractor203/21/2026
MSV BUILDERS LLCGeneral Contractor107/08/2026
NEW AGE CONSTRUCTION INCGeneral Contractor107/08/2026
SIGNS CAD CORPGeneral Contractor107/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
GREGG NY PLUMBING, INCPlumbing107/08/2026
HOD PIPING & HEATING CORPPlumbing107/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
JULIAN PLBG & HTG CORPPlumbing107/08/2026
MONARCH PLUMB & HTG LLCPlumbing107/08/2026
RRP PLUMBING CORPPlumbing107/08/2026
SO PLUMBING & HEATING INCPlumbing107/08/2026
MAUCERI SIGNScaffold107/08/2026
ALBERT STIEFELElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FRANCISCO D. PEREZ PE3306102/29/2024
A. GIANNOPOULOS ARCHITECT2196202/13/2024
NIKOLAI KATZ ARCHITECT3482309/14/2023
AK ENGINEERING PC678612/14/2022
DAVID TURNER ARCHITECT PC3829112/07/2021
W.D.ROSS, R.A., P.C3758205/17/2021
MARCH CHADWICK, ARCHITECT2253203/11/2021
RHL ENGINEERING, LLC712311/10/2020
Building Lifecycle
All (263)Filed (45)Permit Issued (34)Signed Off (25)Facade (FISP) (15)Violation (60)Inspection (22)Objection (32)Special Inspection (30)
07/31/2026
Objection resolved — Addressed
07/29/2026
Objection raised — Scope
07/29/2026
Objection resolved — Resolved
07/29/2026
Objection resolved — Resolved
07/29/2026
Objection resolved — Resolved
07/29/2026
Objection resolved — Resolved
07/29/2026
Objection resolved — Resolved
07/29/2026
Objection resolved — Resolved
07/29/2026
Objection resolved — Resolved
07/28/2026
Objection raised — Other
07/28/2026
Objection raised — Inspections
07/28/2026
Objection raised — Scope
07/28/2026
Objection raised — Inspections
07/28/2026
Objection raised — Inspections
07/28/2026
Objection raised — Structural
07/28/2026
Objection raised — Scope
07/23/2026
Filed — Alteration
INSTALL A TEMPORARY PLYWOOD FENCE FOR STOREFRONT RENOVATION FILED UNDER INITIAL APPLICATION NUMBER M01435264-I1.
M01435264-I1
07/23/2026
Filed — Alteration
INSTALL A TEMPORARY PLYWOOD FENCE FOR STOREFRONT RENOVATION FILED UNDER INITIAL APPLICATION NUMBER M01435264-I1.
M01435264-S1
07/23/2026
Filed — Alteration
PROPOSED DEMOLITION AND REMOVAL WORK LIMITED TO THE SELECTIVE NON-LOAD-BEARING INTERIOR PARTITIONS AND ASSOCIATED FINISHES TO CREATE AN OPEN TENANT SPACE FOR FUTURE FIT-OUT. NO CHANGE TO OCCUPANCY USE OR EGRESS.
M01435283-I1
07/23/2026
Special inspection requirement — Fenestration areas
07/23/2026
Special inspection requirement — Fenestration air leakage
07/23/2026
Special inspection requirement — Energy Code Compliance Inspections
07/23/2026
Special inspection requirement — Final
07/23/2026
Special inspection requirement — Final
07/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
09/02/2025
Signed off — Alteration
INTERIOR RENOVATION OF APARTMENT #18G ON THE 18 FLOOR OF A EXISTING MULTI-FAMILY ELEVATOR BUILDINGS. NO CHANGE IN EGRESS OR OCCUPANCY.
M00862002-I1
01/14/2025
Signed off — Alteration
PLUMBING WORK TYPE IN APARMENT 18G, SUBMITTED IN CONJUCTION WITH CONSTRUCTION WORK #M00827681-I1
M00828115-I1
01/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/29/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/31/2024
Signed off — Alteration
MODIFICATION OF EXISTING PLUMBING SYSTEM IN UNIT 14J AS PER PLANS.
M01010656-S1
10/31/2024
Signed off — Alteration
MODIFICATION OF EXISTING PLUMBING SYSTEM IN UNIT 14J AS PER PLANS.
M01010656-I1
10/24/2024
Special inspection requirement — Interior lighting power
SERDAR CEYLAN
10/24/2024
Special inspection requirement — Final
SERDAR CEYLAN
10/24/2024
Special inspection requirement — Lighting controls
SERDAR CEYLAN
10/24/2024
Special inspection requirement — Fire-Resistance Rated Construction
SERDAR CEYLAN
10/24/2024
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
10/24/2024
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
10/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
10/21/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/11/2024
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT #18G ON THE 18 FLOOR OF A EXISTING MULTI-FAMILY ELEVATOR BUILDINGS. NO CHANGE IN EGRESS OR OCCUPANCY.
M00862002-P1
10/11/2024
Filed — Alteration
PLUMBING WORK TYPE IN APARMENT 18G, SUBMITTED IN CONJUCTION WITH CONSTRUCTION WORK #M00827681-I1
M00828115-P1
10/04/2024
Signed off — Alteration
PLUMBING WORK IN APT. NO'S. 3F & 3G TO BE FILED CONJUNCTION WITH APPLICATION # M00944053. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00944203-I1
10/04/2024
Signed off — Alteration
M00944053-I1
10/03/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/01/2024
Filed — Alteration
MODIFICATION OF EXISTING PLUMBING SYSTEM IN UNIT 14J AS PER PLANS.
M01010656-P1
09/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/20/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/19/2024
Permit issued — Plumbing
M00828115-I1-PL
09/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/18/2024
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
09/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
09/18/2024
Special inspection requirement — Lighting controls
SERDAR CEYLAN
09/18/2024
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
09/18/2024
Special inspection requirement — Final
SERDAR CEYLAN
09/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
SERDAR CEYLAN
09/18/2024
Special inspection requirement — Interior lighting power
SERDAR CEYLAN
08/20/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/20/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/10/2024
Permit issued — Plumbing
M01010656-S1-PL
Latest 60 of 263 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offASTORIA P & H CORP09/19/2024
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG04/10/2024
DOB NOWGeneral ConstructionSigned-offINTEGRAL CONTRACTING SER04/04/2024
DOB NOWPlumbingSigned-offMONARCH PLUMB & HTG LLC03/19/2024
DOB NOWGeneral ConstructionSigned-offMSV BUILDERS LLC02/07/2024
DOB NOWGeneral ConstructionSigned-offNEW AGE CONSTRUCTION INC01/19/2024
DOB NOWPlumbingSigned-offASTORIA P & H CORP09/27/2023
DOB NOWGeneral ConstructionSigned-offSHANE WALTERS09/20/2023
DOB NOWGeneral ConstructionSigned-offHIGHLEVEL GROUP INC06/01/2023
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC04/07/2023
DOB NOWGeneral ConstructionSigned-offV.P. CONSTRUCTION INC04/04/2023
DOB NOWPlumbingSigned-offRRP PLUMBING CORP08/31/2022
DOB NOWGeneral ConstructionSigned-offHARDESTY & ASSOCIATES, IN08/31/2022
DOB NOWMechanical SystemsSigned-offHARDESTY & ASSOCIATES, IN08/31/2022
DOB NOWGeneral ConstructionPermit IssuedSIGNS CAD CORP07/20/2022
DOB NOWPlumbingSigned-offHOD PIPING & HEATING CORP06/02/2022
DOB NOWGeneral ConstructionSigned-offMARLEX MANAGEMENT INC03/11/2022
DOB NOWGeneral ConstructionSigned-offRENO DESIGN NY LLC03/07/2022
DOB NOWGeneral ConstructionSigned-offMARLEX MANAGEMENT INC01/29/2022
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC01/27/2022
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC01/11/2022
DOB NOWGeneral ConstructionSigned-offRENO DESIGN NY LLC12/16/2021
DOB NOWSignSigned-offMAUCERI SIGN CO., INC11/09/2021
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC09/21/2021
DOB NOWPlumbingSigned-offMASTER 2 PLBG & HTG INC04/30/2021
DOB NOWPlumbingSigned-offMASTER 2 PLBG & HTG INC11/10/2020
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC09/28/2020
DOB NOWPlumbingSigned-offNICHOLAS SUIDA03/16/2020
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC03/04/2020
DOB NOWPlumbingSigned-offJULIAN PLBG & HTG CORP02/06/2020
DOB NOWPlumbingSigned-offMASTER 2 PLBG & HTG INC01/28/2020
DOB NOWMechanical SystemsSigned-offPAM AIR CONDITIONING INC12/06/2019
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO06/04/2019
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO06/04/2019
BISPLISSUEDPLUMBING & HTG DOCTOR INC02/03/2021
BISOTISSUEDQUALITY BUILDING CONSTRUTION01/04/2021
BISOTISSUEDNY FINE INTERIORS & WOODW07/09/2020
BISOTISSUEDNY FINE INTERIORS & WOODW05/12/2020
BISOTISSUEDYILIN CONSTRUCTION INC03/27/2020
BISOTISSUEDQUALITY BUILDING CONSTRUTION03/18/2020
+ 44 more permits on file
21 projects · most recent 10/11/2024
General Wiring HVAC Wiring Lighting
FiledStatusContractorScope
10/11/2024CompleteAMSTERDAM ELECTRIC CORPGeneral Wiring
07/31/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
09/30/2023Permit IssuedDVM ELECTRICAL SERVICES LGeneral Wiring
04/19/2023CompleteMAGNETIC ELECTRIC CORP—
05/18/2022Permit IssuedBRONXDALE ELECTRIC INCGeneral Wiring
03/01/2022CompleteAE ELECTRIC INCGeneral Wiring
02/14/2022CompleteINTELOGIC ELECTRIC, INC.General Wiring
01/11/2022CompleteCRESCO ELECTRICAL CORPGeneral Wiring
05/13/2021CompleteFOS ELEC'L CONTR'S INC.General Wiring
02/17/2021CompleteCENTURY ELECTRIC LLCGeneral Wiring
03/03/2020CompleteLEIGH ELECTRICAL INCGeneral Wiring
03/03/2020CompleteLEIGH ELECTRICAL INCHVAC Wiring
02/23/2020CompleteBOROWIDE ELECT'L CONTR'S—
02/03/2020CompleteDENMAR ELECTRIC CORPGeneral Wiring
01/28/2020CompleteBRONXDALE ELECTRIC INCGeneral Wiring
2 projects · most recent 07/23/2026
Fence
FiledStatusContractorScope
07/23/2026——Fence
06/11/2019——Fence
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
01/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/21/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2024Pass-Final General Construction Non-Directive 14PassView ↗
09/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/20/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/20/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/29/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/26/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/20/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/16/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 99
DateRequirementInspectorRole
07/23/2026Fenestration air leakage—energy_progress
07/23/2026Fenestration and door U-factor and product ratings—energy_progress
07/23/2026Energy Code Compliance Inspections—progress
07/23/2026Final—progress
07/23/2026Final—progress
07/23/2026Fenestration areas—energy_progress
10/24/2024Fire-Resistance Rated ConstructionSERDAR CEYLANprogress
10/24/2024Energy Code Compliance InspectionsSERDAR CEYLANprogress
10/24/2024HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
10/24/2024Energy Code Compliance InspectionsSERDAR CEYLANprogress
10/24/2024Interior lighting powerSERDAR CEYLANenergy_progress
10/24/2024Lighting controlsSERDAR CEYLANenergy_progress
10/24/2024FinalSERDAR CEYLANprogress
09/18/2024Fire-Resistance Rated ConstructionSERDAR CEYLANprogress
09/18/2024Lighting controlsSERDAR CEYLANenergy_progress
09/18/2024Interior lighting powerSERDAR CEYLANenergy_progress
09/18/2024Energy Code Compliance InspectionsSERDAR CEYLANprogress
09/18/2024HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
09/18/2024Energy Code Compliance InspectionsSERDAR CEYLANprogress
09/18/2024FinalSERDAR CEYLANprogress
02/26/2024FinalRajiv Fernandezprogress
02/26/2024Energy Code Compliance InspectionsRajiv Fernandezprogress
02/26/2024Lighting in dwelling unitsRajiv Fernandezenergy_progress
02/26/2024Fire-Resistant Penetrations and JointsFRANCISCO PEREZspecial
01/26/2024FinalDeborah Rojas De Leonprogress
Latest 25 of 99.
▾Documents — 962 on file (BIS + DOB NOW)
▸Plans & Drawings43
▸DOB NOWPlans/Sketch30
09/03/2026M00612141-I1Request digital key ↗
09/03/2026M00642961-I1Request digital key ↗
09/03/2026M00656172-I1Request digital key ↗
Showing 3 of 30 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00282233-I1Request digital key ↗
09/05/2026M00309637-I1Request digital key ↗
08/15/2026M00255276-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00226999-I1Request digital key ↗
08/15/2026M00226999-P1Request digital key ↗
08/15/2026M00226999-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Sign2
09/05/2026M00172862-I1Request digital key ↗
09/05/2026M00172853-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00178197-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00322862-I1Request digital key ↗
▸Applications & Permits169
▸BISWORK PERMIT APPLICATION91
07/29/2020123848658Open ↗
03/18/2020123848658Open ↗
03/13/2020123570643Open ↗
Showing 3 of 91 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION77
05/20/2021123570643Open ↗
12/03/2020140884452Open ↗
12/02/2020123570643Open ↗
Showing 3 of 77 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
10/01/2020123747963Open ↗
▸Seals & Professional Certifications251
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION96
03/18/2020123848658Open ↗
03/13/2020123570643Open ↗
03/13/2020123570643Open ↗
Showing 3 of 96 on file for this type
▸DOB NOWProgress Inspector Seal & Signature58
09/02/2026M00969924-I1Open ↗
09/01/2026M00255276-I1Open ↗
09/01/2026M00255276-I1Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature43
09/05/2026M00172862-I1Open ↗
09/05/2026M00172853-I1Open ↗
09/05/2026M00226999-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/01/2026M00282233-P1Open ↗
09/01/2026M00782695-P1Open ↗
09/01/2026M00309637-P1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
02/14/2020123751038Open ↗
08/15/2019123903099Open ↗
06/07/2019123437389Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
02/14/2020123751038Open ↗
08/15/2019123903099Open ↗
06/07/2019123437389Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/29/2020140884452Open ↗
▸Trade Schedules & Equipment56
▸BISSELF-CERT PLUMBING NOTICE22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
06/07/2019123437389Open ↗
Showing 1 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection30
▸BISTenant Protection Plan and Notes17
03/11/2020123570643Open ↗
02/21/2020123848658Open ↗
02/14/2020123751038Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWTenant Protection Plan10
09/05/2026M00226999-I1Open ↗
08/15/2026M00255276-I1Open ↗
08/13/2026M00255276-P1Open ↗
Showing 3 of 10 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
03/18/2020123848658Open ↗
03/18/2020123848658Open ↗
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos77
▸DOB NOWDEP ACP-5: Asbestos Assessment Report40
09/05/2026M00172862-I1Open ↗
09/05/2026M00172853-I1Open ↗
09/05/2026M00226999-I1Open ↗
Showing 3 of 40 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)25
03/13/2020123570643Open ↗
01/31/2020123848658Open ↗
01/29/2020140884452Open ↗
Showing 3 of 25 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance89
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS46
03/18/2020123848658Open ↗
03/13/2020123570643Open ↗
03/13/2020123570643Open ↗
Showing 3 of 46 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS24
01/25/2022123570643Open ↗
01/24/2022123570643Open ↗
01/24/2022123570643Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY12
06/03/2022123848658Open ↗
01/24/2022123570643Open ↗
01/15/2022123570643Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/03/2022123848658Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: RESPONSIBILITY23
06/08/2022123848658Open ↗
06/08/2022123848658Open ↗
06/06/2022123848658Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
12/19/2019123864906Open ↗
▸Approvals, Objections & Sign-offs55
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST33
06/09/2022123848658Open ↗
01/26/2022123570643Open ↗
06/14/2021123354093Open ↗
Showing 3 of 33 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
03/18/2020123848658Open ↗
02/06/2020123848658Open ↗
07/19/2019123354093Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER4
08/21/2019123354093Open ↗
Showing 1 of 4 on file for this type
▸Cost, Insurance & Ownership77
▸BISCOST AFFIDAVIT71
01/25/2022123570643Open ↗
01/24/2022123570643Open ↗
01/15/2022123570643Open ↗
Showing 3 of 71 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
06/03/2022123848658Open ↗
11/25/2020123903099Open ↗
▸Filing & Intake Forms82
▸BISEFILING COVER SHEET32
02/28/2020123570643Open ↗
02/14/2020123751038Open ↗
01/31/2020123848658Open ↗
Showing 3 of 32 on file for this type
▸BISADDITIONAL INFORMATION25
05/25/2021123570643Open ↗
01/06/2021123570643Open ↗
10/01/2020123747963Open ↗
Showing 3 of 25 on file for this type
▸BISBOROUGH INTAKE FORM21
07/29/2020123848658Open ↗
03/06/2020122494915Open ↗
03/02/2020123903099Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
01/29/2020140884452Open ↗
Showing 1 of 4 on file for this type
▸Other Documents9
▸DOB NOWDHCR Document5
08/13/2026M00282233-I1Open ↗
08/13/2026M00309637-I1Open ↗
08/13/2026M00661308-I1Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type