← Back
BuildNYC
Two family converted from one family
1334 LINCOLN PLACE
BROOKLYN · BIN 3037327
💬 Discuss this project
1910Year Built
2Stories
B3Building Class
R6Zoning
1,500 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family converted from one family · 1,620 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof17p · 2 filings · 20 docs
Floor 167p · 2 filings · 20 docs
Basement5p · 2 filings · 20 docs
Sub-Basement74p · 3 filings · 20 docs
Site & exterior1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Chun Engineering Consultant810/23/2025
Adam Taddonio PE511/25/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Cavalry2103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UK 2 ConstructionScaffold603/21/2026
BH General ContractingGeneral Contractor504/09/2026
Creative Plumbing inPlumbing306/28/2026
YP Mechanicalspecialty_contractor207/08/2026
PipestylistsPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Chun Engineering Consulta9605610/23/2025
M. International Engineering3129108/13/2025
AR-Tech Engineering6659411/25/2021
Building Lifecycle
03/19/2026
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
B00430787-I1-PL
03/05/2026
Closed: L1-borough commissioner has ordered all work stopped under permit #B00430787-I1 on 10/22/25. Intent to revoke approval and permit. Contact borough…
DOB violation · closed on the city's record
01/09/2026
L1-borough commissioner has ordered all work stopped under permit #B00430787-I1 on 10/22/25. Intent to revoke approval and permit. Contact borough…
DOB violation · closed
12/24/2025
Signed off — Alteration
APPLICATION FILED HEREWITH TO CONVERT EXISTING BASEMENT TO COMMUNITY FACILITY AND REAR HORIZONTAL ENLARGMENT IN BASEMENT AS PER PLANS. INCLUDES LEGALIZATION AND CLARIFICATION/RESOLUTION OF VIOLATIONS 35475317P, 35114390H, AND 35501380Y.
B00452763-I1
12/22/2025
Special inspection requirement — Structural Cold-Formed Steel
JAMES CHUN
108 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBH General Contracting11/24/2025
DOB NOWPlumbingPermit IssuedAB Plumbing03/19/2025
DOB NOWConstruction FenceSigned-offUK 2 Construction02/17/2023
DOB NOWConstruction FenceSigned-offUK 2 Construction12/06/2022
DOB NOWPlumbingPermit IssuedT & T Plumbing11/16/2022
DOB NOWFoundationSigned-offBH General Contracting10/25/2022
DOB NOWStructuralSigned-offBH General Contracting08/09/2022
DOB NOWMechanical SystemsSigned-offYP Mechanical02/23/2022
DOB NOWMechanical SystemsSigned-offYP Mechanical11/09/2021
DOB NOWPlumbingPermit IssuedT & T Plumbing11/09/2021
DOB NOWFoundationSigned-offBH General Contracting09/01/2021
DOB NOWGeneral ConstructionSigned-offBH General Contracting07/01/2021
BIS—ISSUEDBH General Contracting06/11/2025
1 project · most recent 09/03/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/03/2025Permit IssuedCreative Plumbing inGas, Water/Sanitary
3 projects · most recent 07/28/2026
General Wiring
FiledStatusContractorScope
07/28/2026Permit IssuedBLZ ElectricGeneral Wiring
12/08/2021Permit IssuedMartin DorkinGeneral Wiring
04/28/2021Permit IssuedAmra ElectricalGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 121
DateRequirementInspectorRole
12/22/2025Fenestration air leakageJAMES CHUNenergy_progress
12/22/2025MeteringJAMES CHUNenergy_progress
12/22/2025Fenestration areasJAMES CHUNenergy_progress
12/22/2025Lighting controlsJAMES CHUNenergy_progress
12/22/2025Lighting in dwelling unitsJAMES CHUNenergy_progress
12/22/2025Maintenance informationJAMES CHUNenergy_progress
12/22/2025Concrete - Cast-In-PlaceJAMES CHUNspecial
12/22/2025MasonryJAMES CHUNspecial
12/22/2025Subsurface Investigations (Borings/Test Pits)JAMES CHUNspecial
12/22/2025Structural Cold-Formed SteelJAMES CHUNspecial
12/22/2025Fire-Resistant Penetrations and JointsJAMES CHUNspecial
12/22/2025Structural Stability – Alterations of existing buildingsJAMES CHUNspecial
12/22/2025Post-installed AnchorsJAMES CHUNspecial
12/22/2025FinalCloud Leeprogress
12/22/2025Footing and FoundationJAMES CHUNprogress
12/22/2025Energy Code Compliance InspectionsJAMES CHUNprogress
12/22/2025Fire-Resistance Rated ConstructionJAMES CHUNprogress
12/22/2025Interior lighting powerJAMES CHUNenergy_progress
12/22/2025Insulation placement and R valuesJAMES CHUNenergy_progress
12/22/2025Permanent certificateJAMES CHUNenergy_progress
12/22/2025Exterior lighting powerJAMES CHUNenergy_progress
12/22/2025Air barrier - visual inspectionJAMES CHUNenergy_progress
12/22/2025Fenestration and door U-factor and product ratingsJAMES CHUNenergy_progress
10/20/2025Subsurface Investigations (Borings/Test Pits)JAMES CHUNspecial
10/20/2025Structural Stability – Alterations of existing buildingsJAMES CHUNspecial
Latest 25 of 121.
188 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account