← Back
BROOKLYN
1335 63 STREET
BROOKLYN · BIN 3141652
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Roof1p · 1 filing · 2 docs
Floor 221p · 3 filings · 20 docs
Floor 122p · 4 filings · 20 docs
Cellar21p · 4 filings · 20 docs
Basement21p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JONICO CONSTRUCTION3007/08/2026
2133 HARING403/21/2026
1939 85TH203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN STUDIO ASSOCIATES1408/21/2023
STRUCTURAL ENGINEERING SYSTEMS, PLL210/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN STUDIO ASSOCIATES1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JONICO CONSTRUCTION LLCGeneral Contractor1807/08/2026
A.G.M. PLBG & HTG, INCFire Protection107/08/2026
A.G.M. P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES74951008/21/2023
BRIAN E. FLYNN, PE, PC2837308/11/2023
Building Lifecycle
All (104)Filed (16)Permit Issued (12)Signed Off (10)Violation (1)Inspection (11)Objection (24)Special Inspection (30)
10/11/2023
Signed off — New Building
B00692168-I1
09/13/2023
Signed off — Alteration
INSTALLATION OF POURED IN PLACE CONCRETE FOUNDATION FILED IN CONJUNCTION WITH NB B00692168
B08007953-I1
09/01/2023
Signed off — Alteration
SOE DRAWINGS FILED IN CONJUNCTION WITH NB B00692168
B00794128-I1
08/31/2023
Signed off — Alteration
INSTALLATION OF STRUCTURAL STEAL BEAMS AND C-JOIST FILED IN CONJUNCTION WITH NB B00692168 AS PER PLANS FILED HEREWITH
B08039550-I1
08/31/2023
Signed off — New Building
B00692168-S1
08/30/2023
Signed off — Alteration
INSTALLATION OF CONCRETE CURB CUT AS PER PLANS FILED HEREWITH
B08012661-I1
08/30/2023
Signed off — Alteration
INSTALLATION OF CONCRETE CURB CUT AS PER PLANS FILED HEREWITH
B00873968-I1
08/29/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/28/2023
Signed off — Alteration
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURES FILED IN CONJUNCTION WITH NB B00692168 AS PER PLANS FILED HEREWITH
B00737906-I1
08/28/2023
Permit issued — Mechanical Systems
B00692168-S1-MS
08/24/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — Subgrade Inspections
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — Protection of exposed foundation insulation
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — Insulation placement and R values
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — Masonry
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — Air barrier - visual inspection
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — Lighting controls
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — Concrete - Cast-In-Place
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — Maintenance information
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — Lighting in dwelling units
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — Air barrier — testing
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — Fenestration areas
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — Fenestration air leakage
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — Duct leakage testing, insulation and design
Rajasekhar Sakhamuri
08/24/2023
Special inspection requirement — Permanent certificate
Rajasekhar Sakhamuri
08/22/2023
Signed off — Alteration
INSTALLATION OF RESIDENTIAL SPRINKLER SYSTEM FILED IN CONJUNCTION WITH NB B00692168 AS PER PLANS FILED HEREWITH
B00737896-I1
08/22/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
08/21/2023
Filed — New Building
B00692168-P3
08/21/2023
Special inspection requirement — Protection of exposed foundation insulation
Rajasekhar Sakhamuri
08/21/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Rajasekhar Sakhamuri
08/21/2023
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
08/21/2023
Special inspection requirement — Duct leakage testing, insulation and design
Rajasekhar Sakhamuri
08/21/2023
Special inspection requirement — Permanent certificate
Rajasekhar Sakhamuri
08/21/2023
Special inspection requirement — Subgrade Inspections
Rajasekhar Sakhamuri
08/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
08/21/2023
Special inspection requirement — Fenestration areas
Rajasekhar Sakhamuri
08/18/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/11/2023
Filed — Alteration
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURES FILED IN CONJUNCTION WITH NB B00692168 AS PER PLANS FILED HEREWITH
B00737906-P2
08/09/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/04/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/04/2023
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
08/03/2023
Permit issued — Curb Cut
B00873968-I1-CC
08/03/2023
Permit issued — Curb Cut
B08012661-I1-CC
07/31/2023
Signed off — Alteration
INSTALLATION OF 8 FT HIGH CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH
B00688647-I1
07/21/2023
Objection raised — Admin
07/21/2023
Objection resolved — Addressed
07/21/2023
Objection raised — Structural
07/21/2023
Objection resolved — Addressed
07/21/2023
Objection raised — Zoning
07/21/2023
Objection resolved — Addressed
07/21/2023
Objection raised — Zoning
07/21/2023
Objection resolved — Addressed
07/19/2023
Filed — Alteration
INSTALLATION OF CONCRETE CURB CUT AS PER PLANS FILED HEREWITH
B00873968-I1
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJONICO CONSTRUCTION LLC08/28/2023
DOB NOWCurb CutSigned-offJONICO CONSTRUCTION LLC08/03/2023
DOB NOWCurb CutSigned-offJONICO CONSTRUCTION LLC08/03/2023
DOB NOWSprinklersSigned-offA.G.M. PLBG & HTG, INC03/22/2023
DOB NOWPlumbingSigned-offA.G.M. P & H INC12/20/2022
DOB NOWGeneral ConstructionPermit IssuedJONICO CONSTRUCTION LLC12/15/2022
DOB NOWConstruction FenceSigned-offJONICO CONSTRUCTION LLC12/15/2022
DOB NOWStructuralSigned-offJONICO CONSTRUCTION LLC12/06/2022
DOB NOWSupport of ExcavationSigned-offJONICO CONSTRUCTION LLC11/28/2022
DOB NOWFoundationPermit IssuedJONICO CONSTRUCTION LLC10/26/2022
DOB NOWGeneral ConstructionPermit IssuedJONICO CONSTRUCTION LLC09/29/2022
DOB NOWConstruction FenceSigned-offJONICO CONSTRUCTION LLC07/25/2022
BIS—ISSUEDPERCIBALLI INDUSTRIES INC.08/03/2022
1 project · most recent 08/08/2023
General Wiring
FiledStatusContractorScope
08/08/2023CompleteAROUND ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
08/29/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
08/22/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
08/18/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/09/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/04/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/04/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
04/27/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/24/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 77
DateRequirementInspectorRole
08/24/2023Fenestration and door U-factor and product ratingsRajasekhar Sakhamurienergy_progress
08/24/2023Subgrade InspectionsRajasekhar Sakhamurispecial
08/24/2023Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
08/24/2023Concrete - Cast-In-PlaceRajasekhar Sakhamurispecial
08/24/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRajasekhar Sakhamurispecial
08/24/2023MasonryRajasekhar Sakhamurispecial
08/24/2023Fire-Resistance Rated ConstructionRajasekhar Sakhamuriprogress
08/24/2023Energy Code Compliance InspectionsRajasekhar Sakhamuriprogress
08/24/2023Maintenance informationRajasekhar Sakhamurienergy_progress
08/24/2023Lighting in dwelling unitsRajasekhar Sakhamurienergy_progress
08/24/2023HVAC-R and service water heating equipmentRajasekhar Sakhamurienergy_progress
08/24/2023HVAC-R and service water piping design and insulationRajasekhar Sakhamurienergy_progress
08/24/2023Air barrier — testing Rajasekhar Sakhamurienergy_progress
08/24/2023HVAC-R and service water heating system controlsRajasekhar Sakhamurienergy_progress
08/24/2023Protection of exposed foundation insulationRajasekhar Sakhamurienergy_progress
08/24/2023Fenestration areasRajasekhar Sakhamurienergy_progress
08/24/2023Fenestration air leakageRajasekhar Sakhamurienergy_progress
08/24/2023Air barrier - visual inspectionRajasekhar Sakhamurienergy_progress
08/24/2023Duct leakage testing, insulation and designRajasekhar Sakhamurienergy_progress
08/24/2023Permanent certificateRajasekhar Sakhamurienergy_progress
08/24/2023Lighting controlsRajasekhar Sakhamurienergy_progress
08/24/2023Insulation placement and R valuesRajasekhar Sakhamurienergy_progress
08/21/2023Lighting in dwelling unitsRajasekhar Sakhamurienergy_progress
08/21/2023Concrete - Cast-In-PlaceRajasekhar Sakhamurispecial
08/21/2023Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
Latest 25 of 77.
▾Documents — 177 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/28/2026B08007953-I1Request digital key ↗
08/28/2026B00794128-I1Request digital key ↗
08/28/2026B00737896-P1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
08/02/2023340895339Open ↗
07/07/2023322113529Open ↗
06/21/2022322162725Open ↗
▸BISWORK PERMIT APPLICATION1
08/12/2022322162725Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/02/2023340895339Open ↗
▸Zoning, Tax Lot & Property Records12
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00692168-P3Open ↗
08/13/2026B00692168-P2Open ↗
08/13/2026B00692168-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026B00692168-P1Open ↗
08/13/2026B00692168-P3Open ↗
08/13/2026B00692168-P2Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/20/2023322113529Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/20/2023322113529Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
07/20/2023322113529Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00692168-I1Open ↗
▸Seals & Professional Certifications95
▸DOB NOWProgress Inspector Seal & Signature53
08/26/2026B00692168-P1Open ↗
08/26/2026B00692168-P1Open ↗
08/26/2026B00692168-P1Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
08/27/2026B00737906-P1Open ↗
08/27/2026B00794128-I1Open ↗
08/26/2026B00692168-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/28/2026B08007953-I1Open ↗
08/28/2026B00794128-I1Open ↗
08/28/2026B00737896-I1Open ↗
Showing 3 of 16 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/02/2023340895339Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/02/2023340895339Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00692168-P2Open ↗
08/13/2026B00692168-P3Open ↗
08/13/2026B00692168-P1Open ↗
Showing 3 of 4 on file for this type
▸BISGAS CUT-OFF1
08/12/2022322162725Open ↗
▸BISELECTRIC CUT-OFF1
08/12/2022322162725Open ↗
▸BISSEWER CUT-OFF1
08/12/2022322162725Open ↗
▸BISWATER CUT-OFF1
08/12/2022322162725Open ↗
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist4
08/27/2026B00692168-I1Open ↗
08/27/2026B00692168-P1Open ↗
08/27/2026B00692168-P2Open ↗
Showing 3 of 4 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
08/12/2022322162725Open ↗
08/12/2022322162725Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/12/2022322162725Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/02/2023340895339Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
08/12/2022322162725Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00692168-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00692168-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00692168-I1Open ↗
▸Environmental & Asbestos2
▸BISRODENT CONTROL1
08/12/2022322162725Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/12/2022322162725Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00692168-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWConcrete Testing Exception Report1
08/13/2026B08007953-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
09/13/2023340895339Open ↗
▸BISLANDMARKS APPROVAL1
08/12/2022322162725Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
08/12/2022322162725Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
08/02/2023340895339Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/02/2023340895339Open ↗
▸BISEFILING COVER SHEET1
06/21/2022322162725Open ↗
▸Other Documents19
▸BISBPP - SUPPORTING DOCUMENTATION4
08/02/2023340895339Open ↗
08/02/2023340895339Open ↗
08/02/2023340895339Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026B00692168-P2Open ↗
08/13/2026B00692168-P3Open ↗
08/13/2026B00692168-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00692168-P3Open ↗
08/13/2026B00692168-P1Open ↗
08/13/2026B00692168-P2Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
07/07/2023322113529Open ↗
08/12/2022322162725Open ↗
08/12/2022322162725Open ↗
▸BISPLOT DIAGRAM1
07/20/2023322113529Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
07/20/2023322113529Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00794128-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00692168-I1Open ↗