← Back
Five to six families
1336 BAY RIDGE AVENUE
BROOKLYN · Dyker Heights · BIN 3156504
💬 Discuss this project
1925Year Built
3Stories
C2Building Class
R5BZoning
5,441 sfGross Floor Area
6Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Five to six families · Owner of record: LI & LI REAL ESTATE LLC · 3,033 sf lot · 1.79 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LI LI REAL ESTATE1807/08/2026
THE OWNER OF 1336 BAY RID103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC508/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN BUILDING CONSULTANT503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TESTERMAN PLBG & HTG INCPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449508/15/2025
Building Lifecycle
All (60)Filed (5)Permit Issued (3)Signed Off (2)Violation (28)Inspection (3)Objection (10)Special Inspection (9)
05/22/2026
Signed off — Alteration
Propose plumbing work to install new boilers & hot water heaters and re-piping gas pipe of existing residential building as per plan. No change in use, egress, or occupancy.
B00878919-I1
05/22/2026
Signed off — Alteration
Install boilers @ cellar for existing residential building as per plan. No change in use, egress, or occupancy.
B00888394-I1
08/15/2025
Filed — Alteration
Install boilers @ cellar for existing residential building as per plan. No change in use, egress, or occupancy.
B00888394-P1
08/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMED MAHMOUD
08/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
MOHAMED MAHMOUD
08/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
08/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMED MAHMOUD
08/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
08/14/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/21/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/06/2025
Violation issued (HPD, closed)
A
03/04/2025
Violation issued (HPD, closed)
C
03/04/2025
Violation issued (HPD, closed)
B
01/03/2025
Permit issued — Boiler Equipment
B00888394-I1-BE
01/02/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/15/2024
Permit issued — Plumbing
B00878919-I1-PL
11/06/2024
Objection resolved — Addressed
09/04/2024
Filed — Alteration
B01006951-I1
09/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
08/30/2024
Special inspection requirement — Final
MOHAMED MAHMOUD
07/24/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/13/2024
Violation issued (ECB, closed)
Construction
04/08/2024
Violation issued (HPD, closed)
A
02/16/2024
Objection resolved — Addressed
02/12/2024
Objection raised — Scope
02/12/2024
Objection raised — Scope
02/07/2024
Filed — Alteration
Propose plumbing work to install new boilers & hot water heaters and re-piping gas pipe of existing residential building as per plan. No change in use, egress, or occupancy.
B00878919-P1
02/06/2024
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
02/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
11/21/2023
Violation issued (HPD, closed)
I
07/31/2023
Permit issued — Plumbing
B00878919-I1-PL
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/13/2023
Filed — Alteration
Install boilers @ cellar for existing residential building as per plan. No change in use, egress, or occupancy.
B00888394-I1
06/07/2023
Objection resolved — Addressed
06/06/2023
Objection raised — Scope
06/06/2023
Objection resolved — Addressed
06/06/2023
Objection raised — Admin
06/06/2023
Objection raised — Scope
06/06/2023
Objection resolved — Addressed
06/02/2023
Filed — Alteration
Propose plumbing work to install new boilers & hot water heaters and re-piping gas pipe of existing residential building as per plan. No change in use, egress, or occupancy.
B00878919-I1
03/21/2023
Violation issued (HPD, closed)
A
11/09/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
A
02/23/2022
Violation issued (HPD, closed)
I
04/07/2021
Violation issued (HPD, closed)
A
04/07/2021
Violation issued (HPD, closed)
I
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/29/2019
Violation issued (HPD, closed)
I
12/28/2018
Violation issued (HPD, closed)
B
12/28/2018
Violation issued (HPD, closed)
A
12/28/2018
Violation issued (HPD, closed)
A
12/28/2018
Violation issued (HPD, closed)
A
12/28/2018
Violation issued (HPD, closed)
C
11/20/2018
Violation issued (ECB, closed)
Construction
10/09/2018
Violation issued (HPD, closed)
B
10/09/2018
Violation issued (HPD, closed)
B
10/09/2018
Violation issued (HPD, closed)
A
03/06/2015
Violation issued (HPD, closed)
B
12/23/1992
Violation issued (ECB, closed)
Construction
12/01/1992
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offTESTERMAN PLBG & HTG INC01/03/2025
DOB NOWPlumbingSigned-offTESTERMAN PLBG & HTG INC11/15/2024
DOB NOWPlumbingSigned-offTESTERMAN PLBG & HTG INC07/31/2023
BISBLISSUEDBAYSIDE FUEL CORP.03/10/1994
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/14/2025Pass-Final Boiler Equipment InspectionPassView ↗
07/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/02/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
08/15/2025HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
08/15/2025Tenant Protection Plan ComplianceMOHAMED MAHMOUDspecial
08/15/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
08/15/2025HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
08/15/2025HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
09/04/2024Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
08/30/2024FinalMOHAMED MAHMOUDprogress
02/06/2024Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
02/06/2024Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026B00888394-P1Request digital key ↗
08/27/2026B00888394-I1Request digital key ↗
08/24/2026B01006951-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026B00888394-I1Open ↗
08/27/2026B00888394-P1Open ↗
08/26/2026B00878919-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/20/2026B00888394-I1Open ↗
09/20/2026B00888394-I1Open ↗
09/20/2026B00888394-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/20/2026B00888394-I1Open ↗
09/20/2026B00888394-I1Open ↗
08/28/2026B01006951-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026B00888394-I1Open ↗
08/27/2026B00888394-P1Open ↗
08/24/2026B01006951-I1Open ↗
Showing 3 of 5 on file for this type