← Back
Elevator apt, miscellaneous
1337 5 AVENUE
MANHATTAN · BIN 1080503
💬 Discuss this project
1959Year Built
19Stories
D9Building Class
R7-2Zoning
865,481 sfGross Floor Area
800Units
LL97 Covered17 Open Violations ▸
Elevator apt, miscellaneous · Owner of record: NYC HOUSING AUTHORITY · 298,710 sf lot · 2.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingOther
Roof1p · 1 filing · 20 docs
Floor 19p · 3 filings · 20 docs
Cellar7p · 1 filing · 20 docs
2 jobs · most recent 12/10/2024
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/10/2024Signed-offJFZ CONSTRUCTION, INCAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-SM48NAM2 4 tons · Condensing Unit ×4
MXZ-SM36NAM 3 tons · Condensing Unit ×2
MXZ-SM48NAMHZ2 4 tons · Condensing Unit ×2
05/08/2022——Ventilation Systems
Ventilation
Captiveaire NCA16FA 2,800 CFM · Exhaust Fan ×1
1 job · most recent 12/10/2024
Gas Water/Sanitary
FiledStatusContractorScope
12/10/2024Signed-offLG ELITE PLUMBING INCGas, Water/Sanitary
4 jobs · most recent 04/16/2024
General Wiring Lighting Boiler Controls
FiledStatusContractorScope
04/16/2024Permit IssuedR & T ELECTRICAL CORPGeneral Wiring
11/29/2021Permit IssuedG.S.H. ELECTRIC INC.General Wiring
10/20/2021CompleteG.S.H. ELECTRIC INC.General Wiring, Lighting
04/24/2019Permit IssuedN.Y.C. HOUSING AUTHORITYBoiler Controls
1 job · most recent 12/10/2024
Fence
FiledStatusContractorScope
12/10/2024Signed-offLG ELITE PLUMBING INCFence
Building Lifecycle
All (86)Filed (10)Permit Issued (4)Signed Off (4)Violation (33)Inspection (4)Objection (4)Special Inspection (27)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/19/2025
Objection resolved — Addressed
03/17/2025
Objection raised — Other
03/17/2025
Objection resolved — Addressed
03/11/2025
Signed off — Alteration
RENOVATION AT EXIST COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE 1ST FL AND STORAGE AT THE CEL; MODIFY EXISTING STOREFRONT; INSTALL DUCTWORKS AT 1ST FL AND CEL, REPLACE EXIST ROOF CONDENSING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00942936-S1
03/11/2025
Signed off — Alteration
RENOVATION AT EXIST COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE 1ST FL AND STORAGE AT THE CEL; MODIFY EXISTING STOREFRONT; INSTALL DUCTWORKS AT 1ST FL AND CEL, REPLACE EXIST ROOF CONDENSING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00942936-I1
03/10/2025
Objection raised — Inspections
03/06/2025
Filed — Alteration
ERECT AN ILLUMINATED SIGN ON WALL. NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01191170-I1
12/10/2024
Filed — Alteration
RENOVATION AT EXIST COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE 1ST FL AND STORAGE AT THE CEL; MODIFY EXISTING STOREFRONT; INSTALL DUCTWORKS AT 1ST FL AND CEL, REPLACE EXIST ROOF CONDENSING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00942936-P3
12/09/2024
Filed — Alteration
RENOVATION AT EXIST COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE 1ST FL AND STORAGE AT THE CEL; MODIFY EXISTING STOREFRONT; INSTALL DUCTWORKS AT 1ST FL AND CEL, REPLACE EXIST ROOF CONDENSING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00942936-P2
12/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK LIEPINS
12/09/2024
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
12/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIK LIEPINS
12/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
ERIK LIEPINS
12/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
ERIK LIEPINS
12/09/2024
Special inspection requirement — Fenestration air leakage
ERIK LIEPINS
12/09/2024
Special inspection requirement — Air barrier - visual inspection
ERIK LIEPINS
12/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIK LIEPINS
12/09/2024
Special inspection requirement — Fenestration areas
ERIK LIEPINS
12/09/2024
Special inspection requirement — Duct leakage testing, insulation and design
ERIK LIEPINS
12/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK LIEPINS
12/09/2024
Special inspection requirement — Mechanical Systems
ERIK LIEPINS
12/09/2024
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
12/09/2024
Special inspection requirement — Final
ERIK LIEPINS
12/09/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ERIK LIEPINS
12/09/2024
Special inspection requirement — Interior lighting power
ERIK LIEPINS
12/09/2024
Special inspection requirement — Shutoff dampers
ERIK LIEPINS
12/09/2024
Special inspection requirement — Lighting controls
ERIK LIEPINS
12/09/2024
Special inspection requirement — Maintenance information
ERIK LIEPINS
12/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
ERIK LIEPINS
12/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
ERIK LIEPINS
12/09/2024
Special inspection requirement — Exterior lighting power
ERIK LIEPINS
11/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/04/2024
Filed — Alteration
RENOVATION AT EXIST COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE 1ST FL AND STORAGE AT THE CEL; MODIFY EXISTING STOREFRONT; INSTALL DUCTWORKS AT 1ST FL AND CEL, REPLACE EXIST ROOF CONDENSING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00942936-P1
10/10/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/18/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
07/16/2024
Signed off — Alteration
RENOVATION AT EXIST COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE 1ST FL AND STORAGE AT THE CEL; MODIFY EXISTING STOREFRONT; INSTALL DUCTWORKS AT 1ST FL AND CEL, REPLACE EXIST ROOF CONDENSING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00942936-S2
06/24/2024
Filed — Alteration
ERECT AN ILLUMINATED SIGN ON WALL. NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01036107-I1
04/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/05/2024
Permit issued — Plumbing
M00942936-S1-PL
03/07/2024
Permit issued — Construction Fence
M00942936-S2-FN
03/07/2024
Permit issued — Mechanical Systems
M00942936-I1-GC-CX
11/08/2023
Filed — Alteration
RENOVATION AT EXIST COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE 1ST FL AND STORAGE AT THE CEL; MODIFY EXISTING STOREFRONT; INSTALL DUCTWORKS AT 1ST FL AND CEL, REPLACE EXIST ROOF CONDENSING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00942936-S2
11/02/2023
Filed — Alteration
RENOVATION AT EXIST COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE 1ST FL AND STORAGE AT THE CEL; MODIFY EXISTING STOREFRONT; INSTALL DUCTWORKS AT 1ST FL AND CEL, REPLACE EXIST ROOF CONDENSING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00942936-S1
11/01/2023
Filed — Alteration
RENOVATION AT EXIST COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE 1ST FL AND STORAGE AT THE CEL; MODIFY EXISTING STOREFRONT; INSTALL DUCTWORKS AT 1ST FL AND CEL, REPLACE EXIST ROOF CONDENSING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00942936-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/08/2022
Filed — Alteration
Filing for Interior work inside existing partial 1st FL commercial space (Deli use group #6), work to include new floor tiles, install new range hood, and interior finishes throughout. No Change in use, egress, or occupancy.
M00715731-I1
04/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD BILLAH
Latest 60 of 86 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA1007/08/2026
NYC HOUSING AUTHORITY503/22/2026
OWNER OF MADISON CLNRS IN103/22/2026
NY CITY HOUSING AUTHORITY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALPHA HOME DESIGN LLC203/06/2025
ZELTA DESIGN612/10/2024
STEE LLC105/08/2022
BLACK BOX ENGINEERING111/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EPAC BUILDING CONSULTING INC1203/21/2026
INDESIGN STUDIO403/21/2026
INSHA BUILDING CONSULTANTS203/21/2026
GREEN LIGHT EXPEDITING LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JFZ CONSTRUCTION, INCGeneral Contractor407/08/2026
LG ELITE PLUMBING INCPlumbing307/08/2026
MURRELL, LElectrical203/21/2026
CONSULTING REMODLING INCGeneral Contractor203/21/2026
WEN BIN CENElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YAN GAO6619203/06/2025
ZELTA INSPECT LLC7764512/10/2024
BILLAH ENGINEERING5838105/08/2022
BLACK BOX ENGINEERING7196111/12/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offLG ELITE PLUMBING INC04/05/2024
DOB NOWConstruction FenceSigned-offJFZ CONSTRUCTION, INC03/07/2024
DOB NOWMechanical SystemsSigned-offJFZ CONSTRUCTION, INC03/07/2024
DOB NOWGeneral ConstructionSigned-offCONSULTING REMODLING01/24/2022
BISBLISSUEDSTEPHEN BRAUN06/13/2008
BISBLISSUEDAMBASSADOR FUEL OIL CO.04/09/1992
BISFBISSUEDAMBASSADOR FUEL AND OIL BURNER C06/26/1990
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/10/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/18/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
04/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
12/09/2024Fire-Resistant Penetrations and JointsERIK LIEPINSspecial
12/09/2024Energy Code Compliance InspectionsERIK LIEPINSprogress
12/09/2024HVAC-R and service water piping design and insulationERIK LIEPINSenergy_progress
12/09/2024HVAC-R and service water heating system controlsERIK LIEPINSenergy_progress
12/09/2024HVAC-R and service water heating equipmentERIK LIEPINSenergy_progress
12/09/2024Fenestration air leakageERIK LIEPINSenergy_progress
12/09/2024Air barrier - visual inspectionERIK LIEPINSenergy_progress
12/09/2024HVAC-R and service water piping design and insulationERIK LIEPINSenergy_progress
12/09/2024Fenestration areasERIK LIEPINSenergy_progress
12/09/2024Duct leakage testing, insulation and designERIK LIEPINSenergy_progress
12/09/2024Fire-Resistant Penetrations and JointsERIK LIEPINSspecial
12/09/2024Mechanical SystemsERIK LIEPINSspecial
12/09/2024Energy Code Compliance InspectionsERIK LIEPINSprogress
12/09/2024FinalERIK LIEPINSprogress
12/09/2024Fenestration and door U-factor and product ratingsERIK LIEPINSenergy_progress
12/09/2024Interior lighting powerERIK LIEPINSenergy_progress
12/09/2024Shutoff dampersERIK LIEPINSenergy_progress
12/09/2024Lighting controlsERIK LIEPINSenergy_progress
12/09/2024Maintenance informationERIK LIEPINSenergy_progress
12/09/2024HVAC-R and service water heating system controlsERIK LIEPINSenergy_progress
12/09/2024HVAC-R and service water heating equipmentERIK LIEPINSenergy_progress
12/09/2024Exterior lighting powerERIK LIEPINSenergy_progress
04/11/2022Fire-Resistant Penetrations and JointsMOHAMMAD BILLAHspecial
04/08/2022Mechanical SystemsMOHAMMAD BILLAHspecial
04/08/2022FinalSaed Elahmadprogress
Latest 25 of 27.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/03/2026M00609048-I1Request digital key ↗
09/02/2026M00715731-I1Request digital key ↗
08/27/2026M01036107-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
05/06/2009110184684Open ↗
05/06/2009110184684Open ↗
06/10/2008110184684Open ↗
▸BISWORK PERMIT APPLICATION2
06/13/2008110184684Open ↗
06/13/2008110184684Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00609048-I1Open ↗
08/27/2026M01036107-I1Open ↗
08/25/2026M00942936-S2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026M00609048-I1Open ↗
08/25/2026M00715731-I1Open ↗
08/24/2026M00942936-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026M00609048-I1Open ↗
08/25/2026M00715731-I1Open ↗
08/25/2026M00715731-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/10/2008110184684Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/10/2008110184684Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/10/2008110184684Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
05/06/2009110184684Open ↗
05/06/2009110184684Open ↗
06/10/2008110184684Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/03/2026M00609048-I1Open ↗
08/25/2026M00942936-I1Open ↗
08/25/2026M00942936-S1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/10/2008110184684Open ↗
▸Inspections & Test Reports1
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
06/10/2008110184684Open ↗
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
09/03/2026M00609048-I1Open ↗
08/25/2026M00942936-P1Open ↗
08/25/2026M00942936-S2Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
06/10/2008110184684Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
05/06/2009110184684Open ↗
05/06/2009110184684Open ↗
06/13/2008110184684Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/10/2008110184684Open ↗