← Back
Public elementary, junior or senior high
Hunter College High School
1339 MADISON AVENUE · BIN 1047404
💬 Discuss this project
1972Year Built
4Stories
W1Building Class
R8BZoning
192,301 sfGross Floor Area
1Units
LL97 Covered14 Open Violations 10 unresolved · 4 paperwork only ▸FISP: SAFEFDNY Report ↗
Public elementary, junior or senior high · 80,566 sf lot · 2.39 FAR built · Flood zone X
Locations of Work
Mechanical
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DASNY1007/08/2026
WASOFF PLG & UTILITY CO I103/22/2026
7 EAST 94TH STREET CORPOR103/22/2026
CITY UNIVERSITY OF NY 0103/22/2026
CUNY 042403/22/2026
CITY UNIVERSITY OF NY 042203/22/2026
CUNY DESIGN AND CONSTRUCTION403/21/2026
K D CONSTRUCTION303/21/2026
DORMITORY AUTHORITY STATE OF NY403/21/2026
DORMITORY AUTHORITY OF THE STATE2903/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AKRF, INC.112/19/2024
COSENTINI ASSOCIATES112/16/2024
SHAKESPEARE, GORDON, VLADO ARCHITEC112/12/2024
GENESYS ENGINEERING210/21/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RPO603/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VOLMAR CONSTRUCTION INCGeneral Contractor304/09/2026
EASTERN PLBG & MECH CONTRPlumbing207/08/2026
VMC PLUMBING & HEATING INPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983112/12/2024
Building Lifecycle
All (93)Filed (5)Permit Issued (7)Signed Off (1)Facade (FISP) (4)Violation (60)Inspection (4)Special Inspection (12)
12/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/19/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/08/2025
Permit issued — Plumbing
M01149946-S1-PL
07/02/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/11/2025
Permit issued — Plumbing
M01149946-S2-PL
04/30/2025
Permit issued — Earth Work
M01149946-I1-ST
04/29/2025
Permit issued — General Construction
M01149946-I1-EA
03/25/2025
Permit issued — General Construction
M01149946-I1-GC
03/20/2025
Violation issued (FDNY_ORDER, closed)
03/20/2025
Violation issued (FDNY_ORDER, closed)
03/20/2025
Violation issued (FDNY_ORDER, closed)
03/20/2025
Violation issued (FDNY_ORDER, closed)
12/19/2024
Filed — Alteration
Plumbing work associated with Playground renovation as shown on drawings filed herewith. No change in occupancy, use or egress.
M01149946-S2
12/16/2024
Filed — Alteration
Plumbing work associated with Playground renovation as shown on drawings filed herewith. No change in occupancy, use or egress.
M01149946-S1
12/12/2024
Filed — Alteration
Plumbing work associated with Playground renovation as shown on drawings filed herewith. No change in occupancy, use or egress.
M01149946-I1
12/06/2024
Special inspection requirement — Post-installed Anchors
MARISA HARTE
12/03/2024
Special inspection requirement — Final
MARISA HARTE
10/18/2024
Violation issued (ECB, open)
Construction
10/03/2024
Violation issued (FDNY_NOV, closed)
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/25/2023
Violation issued (FDNY_NOV, closed)
11/21/2022
Violation issued (FDNY_NOV, closed)
06/13/2022
Violation issued (FDNY_ORDER, closed)
06/13/2022
Violation issued (FDNY_ORDER, closed)
12/07/2021
Violation issued (ECB, open)
Elevators
10/21/2021
Signed off — Alteration
boiler replacement
M00324028-I1
10/15/2021
Violation issued (ECB, open)
Elevators
05/22/2021
Violation issued (FDNY_ORDER, closed)
12/11/2020
Violation issued (FDNY_ORDER, closed)
10/26/2020
Special inspection requirement — Shutoff dampers
Stephen Marchese
10/26/2020
Special inspection requirement — HVAC and service water heating system controls
Stephen Marchese
10/26/2020
Special inspection requirement — Maintenance information
Stephen Marchese
10/26/2020
Special inspection requirement — HVAC and service water heating equipment
Stephen Marchese
10/26/2020
Special inspection requirement — Electrical motors
Stephen Marchese
10/21/2020
Filed — Alteration
boiler replacement
M00324028-P3
10/20/2020
Special inspection requirement — HVAC and service water heating system controls
Stephen Marchese
10/20/2020
Special inspection requirement — Maintenance information
Stephen Marchese
10/20/2020
Special inspection requirement — Shutoff dampers
Stephen Marchese
10/20/2020
Special inspection requirement — HVAC and service water heating equipment
Stephen Marchese
10/20/2020
Special inspection requirement — Electrical motors
Stephen Marchese
06/24/2020
Permit issued — Boiler Equipment
M00324028-I1-BE
04/22/2020
Permit issued — Boiler Equipment
M00324028-I1-BE
03/13/2020
Filed — Alteration
boiler replacement
M00324028-I1
01/27/2020
Violation issued (ECB, closed)
Boilers
01/14/2020
Violation issued (ECB, closed)
Boilers
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/19/2019
Violation issued (FDNY_ORDER, closed)
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/05/2017
Violation issued (FDNY_ORDER, closed)
06/20/2017
Violation issued (ECB, closed)
Unknown
10/08/2016
Violation issued (FDNY_ORDER, closed)
10/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/21/2012
Violation issued (ECB, closed)
Elevators
08/15/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/15/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC07/08/2025
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC06/11/2025
DOB NOWEarth WorkSigned-offVOLMAR CONSTRUCTION INC04/30/2025
DOB NOWGeneral ConstructionSigned-offVOLMAR CONSTRUCTION INC04/29/2025
DOB NOWGeneral ConstructionSigned-offVOLMAR CONSTRUCTION INC03/25/2025
DOB NOWBoiler EquipmentSigned-offEASTERN PLBG & MECH CONTR06/24/2020
DOB NOWBoiler EquipmentSigned-offEASTERN PLBG & MECH CONTR04/22/2020
BISOTISSUEDC. D. E. AIR-CONDITIONING04/08/2022
BISMHISSUEDC. D. E. AIR-CONDITIONING04/08/2022
BISOTISSUEDC. D. E. AIR-CONDITIONING04/08/2022
BISOTISSUEDC. D. E. AIR-CONDITIONING04/08/2022
BISPLISSUEDEASTERN PLBG & MECH CONTR04/27/2021
BISOTISSUEDC. D. E. AIR-CONDITIONING04/14/2021
BISOTISSUEDC. D. E. AIR-CONDITIONING04/14/2021
BISMHISSUEDC. D. E. AIR-CONDITIONING04/14/2021
BISOTISSUEDC. D. E. AIR-CONDITIONING04/14/2021
BISOTISSUEDC. D. E. AIR-CONDITIONING09/15/2020
BISOTISSUEDC. D. E. AIR-CONDITIONING09/15/2020
BISMHISSUEDC. D. E. AIR-CONDITIONING09/15/2020
BISMHISSUEDC. D. E. AIR-CONDITIONING09/15/2020
BISOTISSUEDC. D. E. AIR-CONDITIONING09/15/2020
BISOTISSUEDC. D. E. AIR-CONDITIONING09/15/2020
BISOTISSUEDWINICK PRODUCTIONS, LLC09/11/2020
BISPLISSUEDEASTERN PLBG & MECH CONTR04/17/2020
BISPLISSUEDEASTERN PLBG & MECH CONTR04/17/2020
BISMHISSUEDC. D. E. AIR-CONDITIONING04/16/2020
BISOTISSUEDC. D. E. AIR-CONDITIONING04/16/2020
BISOTISSUEDC. D. E. AIR-CONDITIONING04/16/2020
BISOTISSUEDC. D. E. AIR-CONDITIONING04/16/2020
BISOTISSUEDONSITE CONSTRUCTION ENTERPRISES11/14/2019
BISOTISSUEDC. D. E. AIR-CONDITIONING08/12/2019
BISOTISSUEDC. D. E. AIR-CONDITIONING07/18/2019
BISPLISSUEDEASTERN PLBG & MECH CONTR05/08/2019
BISPLISSUEDEASTERN PLBG & MECH CONTR05/08/2019
BISOTISSUEDC. D. E. AIR-CONDITIONING02/15/2019
BISMHISSUEDC. D. E. AIR-CONDITIONING02/15/2019
BISOTISSUEDC. D. E. AIR-CONDITIONING02/15/2019
BISOTISSUEDC. D. E. AIR-CONDITIONING02/15/2019
BISMHISSUEDTRANE U.S. INC08/17/2016
BISOTISSUEDTRANE U.S. INC08/12/2016
+ 17 more permits on file
1 project · most recent 12/19/2024
Storm Water/Sanitary
FiledStatusContractorScope
12/19/2024Signed-offM. SPINELLI PLB & HTG INCStorm, Water/Sanitary
3 projects · most recent 11/06/2024
General Wiring
FiledStatusContractorScope
11/06/2024CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
03/29/2022CompleteARK SYSTEMS ELEC. CORPGeneral Wiring
02/25/2019Permit IssuedARK SYSTEMS ELEC. CORP—
1 project · most recent 12/19/2024
Concrete
FiledStatusContractorScope
12/19/2024Signed-offM. SPINELLI PLB & HTG INCConcrete
1 project · most recent 12/19/2024
Earthwork
FiledStatusContractorScope
12/19/2024Signed-offM. SPINELLI PLB & HTG INCEarthwork
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/19/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
12/06/2024Post-installed AnchorsMARISA HARTEspecial
12/03/2024FinalMARISA HARTEprogress
10/26/2020Shutoff dampersStephen Marcheseenergy_progress
10/26/2020HVAC and service water heating system controls Stephen Marcheseenergy_progress
10/26/2020Maintenance informationStephen Marcheseenergy_progress
10/26/2020HVAC and service water heating equipment Stephen Marcheseenergy_progress
10/26/2020Electrical motorsStephen Marcheseenergy_progress
10/20/2020HVAC and service water heating system controls Stephen Marcheseenergy_progress
10/20/2020Maintenance informationStephen Marcheseenergy_progress
10/20/2020Shutoff dampersStephen Marcheseenergy_progress
10/20/2020HVAC and service water heating equipment Stephen Marcheseenergy_progress
10/20/2020Electrical motorsStephen Marcheseenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Hunter College Campus SchoolEducationBasement
Project M00324028 Alteration · LOC Issued · 03/13/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 395 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch3
08/25/2026M01149946-S1Request digital key ↗
08/25/2026M01149946-S2Request digital key ↗
08/25/2026M01149946-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/04/2026M00324028-P3Request digital key ↗
09/04/2026M00324028-I1Request digital key ↗
▸Applications & Permits65
▸BISPLAN / WORK APPROVAL APPLICATION41
09/09/2021123228177Open ↗
08/27/2021123228177Open ↗
06/14/2021123228177Open ↗
Showing 3 of 41 on file for this type
▸BISWORK PERMIT APPLICATION23
09/11/2020140950638Open ↗
11/14/2019123789445Open ↗
06/12/2019140853976Open ↗
Showing 3 of 23 on file for this type
▸BISPLACE OF ASSEMBLY1
06/11/2018123584415Open ↗
▸Seals & Professional Certifications78
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
11/25/2019140853976Open ↗
11/14/2019123789445Open ↗
11/14/2019123789445Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/23/2026M00324028-I1Open ↗
09/23/2026M00324028-I1Open ↗
09/23/2026M00324028-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
09/10/2020140950638Open ↗
11/14/2019123789445Open ↗
08/20/2019140857892Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/04/2026M00324028-I1Open ↗
09/04/2026M00324028-P3Open ↗
08/25/2026M01149946-S2Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
11/14/2019123789445Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/10/2020140950638Open ↗
08/20/2019140857892Open ↗
06/12/2019140853976Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
09/10/2020140950638Open ↗
08/20/2019140857892Open ↗
06/12/2019140853976Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/20/2026M01149946-I1Open ↗
▸Trade Schedules & Equipment36
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
07/13/2018123425604Open ↗
03/30/2018123425604Open ↗
12/22/2017123228177Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS8
11/17/2022123228177Open ↗
11/17/2022123228177Open ↗
11/17/2022123228177Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING8
09/09/2021123228177Open ↗
08/27/2021123228177Open ↗
06/14/2021123228177Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
07/29/2019140853976Open ↗
06/12/2019140853976Open ↗
Showing 2 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
11/17/2022123228177Open ↗
10/20/2022123228177Open ↗
Showing 2 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
05/13/2022123224126Open ↗
Showing 1 of 2 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes2
11/14/2019123789445Open ↗
12/22/2017123228177Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
08/20/2019140857892Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos13
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/04/2026M00324028-I1Open ↗
08/25/2026M01149946-S1Open ↗
08/25/2026M01149946-I1Open ↗
▸BISDEP FORM V5 - ASBESTOS VARIANCE2
11/14/2019123789445Open ↗
02/15/2019123228177Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
06/12/2019140853976Open ↗
Showing 1 of 2 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0319MN191
10/20/2022123228177Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/03/2022123228177Open ↗
▸Energy Compliance33
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS20
11/25/2019140853976Open ↗
11/14/2019123789445Open ↗
11/14/2019123789445Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
11/14/2022123228177Open ↗
10/20/2022123228177Open ↗
12/20/2021123228177Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
10/20/2022123228177Open ↗
12/20/2021123228177Open ↗
11/25/2019140853976Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/12/2019140853976Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/04/2026M00324028-I1Open ↗
▸Inspections & Test Reports36
▸BISTECHNICAL REPORT: RESPONSIBILITY27
11/14/2022123228177Open ↗
11/14/2022123228177Open ↗
11/14/2022123228177Open ↗
Showing 3 of 27 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)3
09/10/2020140950638Open ↗
08/20/2019140857892Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
11/15/2022123228177Open ↗
02/15/2019123228177Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
02/15/2019123228177Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
11/15/2022123228177Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
08/20/2019140857892Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
08/20/2019140857892Open ↗
▸Approvals, Objections & Sign-offs37
▸BISLANDMARKS APPROVAL11
09/10/2020140950638Open ↗
11/14/2019123789445Open ↗
08/20/2019140857892Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
11/15/2022123228177Open ↗
11/25/2019140853976Open ↗
02/12/2018122089211Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
09/04/2026M00324028-I1Open ↗
09/04/2026M00324028-P3Open ↗
08/25/2026M01149946-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)5
09/04/2026M00324028-I1Open ↗
09/04/2026M00324028-P3Open ↗
08/13/2026M01149946-I1Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/15/2022123228177Open ↗
11/25/2019140853976Open ↗
Showing 2 of 3 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLANDMARKS SIGNOFF2
10/20/2022123228177Open ↗
Showing 1 of 2 on file for this type
▸BISFINAL1
09/10/2020140950638Open ↗
▸DOB NOWDEP Variance (V5) letter1
09/04/2026M00324028-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
09/04/2026M00324028-I1Open ↗
▸Cost, Insurance & Ownership37
▸BISCOST AFFIDAVIT37
10/20/2022123228177Open ↗
10/20/2022123228177Open ↗
10/20/2022123228177Open ↗
Showing 3 of 37 on file for this type
▸Filing & Intake Forms42
▸BISEFILING COVER SHEET19
11/14/2019123789445Open ↗
04/04/2019123836661Open ↗
03/30/2018123425604Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION11
06/21/2021123228177Open ↗
06/21/2021123228177Open ↗
10/21/2020123228177Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM7
11/25/2019140853976Open ↗
07/26/2019140853976Open ↗
05/09/2019123228177Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
09/10/2020140950638Open ↗
08/20/2019140857892Open ↗
06/12/2019140853976Open ↗
Showing 3 of 5 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
04/04/2019123836661Open ↗
06/11/2018123584415Open ↗
03/28/2018123425604Open ↗
Showing 3 of 7 on file for this type
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type