← Back
QUEENS
133A REID AVENUE
QUEENS · BIN 4625966
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Floor 31p · 1 filing · 7 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE104/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CMC DESIGN ARCHITECT, P.C.204/17/2026
Building Lifecycle
All (32)Filed (1)Objection (5)Special Inspection (26)
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/12/2026
Objection raised — Energy
05/12/2026
Objection raised — Structural
05/12/2026
Objection raised — Zoning
04/17/2026
Filed — New Building
Plumbing associated with New Building
Q01369764-I1
03/26/2026
Special inspection requirement — Interior lighting power
03/26/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
03/26/2026
Special inspection requirement — Subgrade Inspections
03/26/2026
Special inspection requirement — Wood – Prefabricated I-Joists
03/26/2026
Special inspection requirement — Energy Code Compliance Inspections
03/26/2026
Special inspection requirement — Electric vehicle service equipment requirements
03/26/2026
Special inspection requirement — Duct leakage testing, insulation and design
03/26/2026
Special inspection requirement — Maintenance information
03/26/2026
Special inspection requirement — Fireplaces
03/26/2026
Special inspection requirement — Metering
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/25/2026
Special inspection requirement — Air barrier — testing
03/25/2026
Special inspection requirement — Ventilation and air distribution system
03/25/2026
Special inspection requirement — Air barrier - visual inspection
03/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/25/2026
Special inspection requirement — Fenestration air leakage
03/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/25/2026
Special inspection requirement — Permanent certificate
03/25/2026
Special inspection requirement — Fenestration areas
03/25/2026
Special inspection requirement — Insulation placement and R values
03/10/2026
Special inspection requirement — Footing and Foundation
03/10/2026
Special inspection requirement — Mechanical Systems
03/10/2026
Special inspection requirement — Final
03/10/2026
Special inspection requirement — Lowest Floor Elevation
Nothing on file for this building.
1 project · most recent 04/17/2026
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
04/17/2026——Heating Systems
Heating
Daikin DZ16TC 328 BTU ×1
1 project · most recent 04/17/2026
Sprinkler System
FiledStatusContractorScope
04/17/2026——Sprinkler System
1 project · most recent 04/17/2026
Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
04/17/2026——Plumbing-Sprinkler, Water/Sanitary
1 project · most recent 04/17/2026
FiledStatusContractorScope
04/17/2026——2 scope_items
1 project · most recent 04/17/2026
Fence
FiledStatusContractorScope
04/17/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
03/26/2026Interior lighting power—energy_progress
03/26/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
03/26/2026Subgrade Inspections—special
03/26/2026Wood – Prefabricated I-Joists—special
03/26/2026Energy Code Compliance Inspections—progress
03/26/2026Electric vehicle service equipment requirements—energy_progress
03/26/2026Duct leakage testing, insulation and design—energy_progress
03/26/2026Maintenance information—energy_progress
03/26/2026Fireplaces—energy_progress
03/26/2026Metering—energy_progress
03/26/2026Fire-Resistant Penetrations and Joints—special
03/25/2026HVAC-R and service water heating equipment—energy_progress
03/25/2026Air barrier — testing —energy_progress
03/25/2026Ventilation and air distribution system—energy_progress
03/25/2026Air barrier - visual inspection—energy_progress
03/25/2026HVAC-R and service water heating system controls—energy_progress
03/25/2026Fenestration air leakage—energy_progress
03/25/2026Fenestration and door U-factor and product ratings—energy_progress
03/25/2026HVAC-R and service water piping design and insulation—energy_progress
03/25/2026Permanent certificate—energy_progress
03/25/2026Fenestration areas—energy_progress
03/25/2026Insulation placement and R values—energy_progress
03/10/2026Footing and Foundation—progress
03/10/2026Mechanical Systems—special
03/10/2026Final—progress
Latest 25 of 26.
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026Q01369764-S1Request digital key ↗
08/17/2026Q01369764-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026Q01369764-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026Q01369764-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026Q01369764-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026Q01369764-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026Q01369764-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01369764-I1Open ↗