← Back
Office only, 2-6 stories
Jamaica Hospital
134-14 JAMAICA AVENUE · Richmond Hill · BIN 4196414
💬 Discuss this project
1967Year Built
4Stories
O2Building Class
R6Zoning
487,000 sfGross Floor Area
1Units
LL97 Covered14 Open Violations 8 unresolved · 6 paperwork only ▸FISP: No Report FiledFDNY Report ↗
Office only, 2-6 stories · 80,000 sf lot · 6.09 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
Roof5p · 1 filing · 4 docs
Floor 225p · 4 filings · 20 docs
Floor 1Under Construction62p · 8 filings · 20 docs
Cellar3p · 1 filing · 4 docs
Site & exterior4p · 2 filings · 5 docs
Filed — no permit issued9p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JAMAICA HOSPITAL4207/17/2026
JAMAICA HOSPITAL MEDICAL CENTER1507/08/2026
THE JAMAICA HOSPITAL MEDICAL803/21/2026
KINGS GROUP NY407/08/2026
METRO CONTRACTING NY403/21/2026
BANU CONSTRUCTION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FAVIO MARIA BARRIONUEVO803/21/2026
XPDITE GROUP LLC (104)803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.M.N. CORPORATIONPlumbing607/08/2026
JAMAICA HOSPITAL MEDICALGeneral Contractor307/17/2026
CARE ENTERPRISES, INCGeneral Contractor307/08/2026
AJC SPRINKLER CORPFire Protection307/08/2026
EESON CONSTRUCTION TSG LLGeneral Contractor104/09/2026
KINGS GROUP NY CORPGeneral Contractor107/08/2026
KERR, RALPHElectrical103/21/2026
AMN PLUMBING CORPPlumbing107/08/2026
LICKMAN, RONALDElectrical103/21/2026
MAZE, CElectrical103/21/2026
AMN FIRE CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAVID KATZ, P.E.6087412/18/2025
ETI CONSULTANTS LLC7694108/14/2022
LEDER-LUIS ARCHITECTURAL1553412/17/2021
Building Lifecycle
All (207)Filed (16)Permit Issued (20)Signed Off (8)Facade (FISP) (16)Violation (60)Inspection (7)Objection (50)Special Inspection (30)
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection resolved — Resolved
07/16/2026
Permit issued — General Construction
Q01294534-I1-GC
07/13/2026
Objection raised — Structural
07/13/2026
Objection raised — Structural
07/13/2026
Objection raised — Inspections
07/13/2026
Objection raised — Structural
07/13/2026
Objection raised — Structural
06/26/2026
Signed off — Alteration
Q01396167-I1
06/15/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/01/2026
Filed — No Work
Q01389998-I1
05/19/2026
Permit issued — Boiler Equipment
Q01396167-I1-BE
05/13/2026
Filed — Alteration
Q01396167-I1
05/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/20/2026
Special inspection requirement — Public Assembly Emergency Lighting
03/24/2026
Permit issued — Sprinklers
Q01325466-I1-EW-SP
03/23/2026
Permit issued — Mechanical Systems
Q01325399-I1-MS
03/13/2026
Violation issued (FDNY_ORDER, closed)
03/13/2026
Violation issued (FDNY_ORDER, closed)
03/04/2026
Violation issued (FDNY_NOV, closed)
02/26/2026
Permit issued — Plumbing
Q01325235-I1-PL
02/20/2026
Cycle 10 facade report submitted
02/18/2026
Objection resolved — Addressed
02/14/2026
Violation issued (FDNY_ORDER, closed)
02/03/2026
Cycle 10 facade inspection completed
02/02/2026
Objection resolved — Addressed
01/31/2026
Objection raised — Scope
01/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Katz
01/20/2026
Objection resolved — Addressed
01/20/2026
Objection resolved — Addressed
01/20/2026
Objection resolved — Addressed
01/20/2026
Objection resolved — Addressed
01/20/2026
Objection resolved — Addressed
01/20/2026
Objection resolved — Addressed
01/20/2026
Objection resolved — Addressed
01/20/2026
Objection resolved — Addressed
01/20/2026
Objection resolved — Addressed
01/20/2026
Objection resolved — Addressed
01/12/2026
Objection raised — Fire_Protection
01/12/2026
Objection raised — Fire_Protection
01/12/2026
Objection raised — Fire_Protection
01/12/2026
Objection raised — Fire_Protection
01/12/2026
Objection raised — Fire_Protection
01/12/2026
Objection raised — Fire_Protection
01/12/2026
Objection raised — Fire_Protection
01/12/2026
Objection raised — Fire_Protection
01/12/2026
Objection raised — Cost
01/12/2026
Objection raised — Fire_Protection
01/12/2026
Objection raised — Fire_Protection
12/18/2025
Filed — Alteration
Q01325399-I1
12/17/2025
Filed — Alteration
Q01325235-I1
12/17/2025
Filed — Alteration
MODIFY THE EXISTING AUTOMATIC WET SPRINKLER SYSTEM ON 1ST FLOOR WORK AREA AT JAMAICA HOSPITAL AXEL BUILDING OUTPATIENT MEDICAL OFFICES.
Q01325466-I1
12/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
David Katz
12/17/2025
Special inspection requirement — Energy Code Compliance Inspections
David Katz
12/17/2025
Special inspection requirement — Energy Code Compliance Inspections
David Katz
11/26/2025
Special inspection requirement — Sprinkler Systems
David Katz
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Katz
Latest 60 of 207 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJAMAICA HOSPITAL MEDICAL07/16/2026
DOB NOWBoiler EquipmentSigned-offSERVICE TECH MECH&PLBG IN05/19/2026
DOB NOWSprinklersPermit IssuedAMN FIRE CORP03/24/2026
DOB NOWMechanical SystemsPermit IssuedEESON CONSTRUCTION TSG LL03/23/2026
DOB NOWPlumbingPermit IssuedA.M.N. CORPORATION02/26/2026
DOB NOWGeneral ConstructionPermit IssuedJAMAICA HOSPITAL MEDICAL11/10/2025
DOB NOWMechanical SystemsSigned-offNICHOLAS COUTURE, PE08/30/2022
DOB NOWPlumbingSigned-offA.M.N. CORPORATION07/18/2022
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT.L04/19/2022
DOB NOWSprinklersSigned-offAJC SPRINKLER CORP02/17/2022
DOB NOWPlumbingSigned-offA.M.N. CORPORATION02/03/2022
DOB NOWGeneral ConstructionSigned-offJAMAICA HOSPITAL MEDICAL01/25/2022
DOB NOWSprinklersSigned-offAJC SPRINKLER CORP07/15/2021
DOB NOWPlumbingSigned-offA.M.N. CORPORATION07/09/2021
DOB NOWPlumbingSigned-offA.M.N. CORPORATION03/01/2021
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT.L12/18/2020
DOB NOWPlumbingSigned-offAMN PLUMBING CORP12/07/2020
DOB NOWSprinklersSigned-offAJC SPRINKLER CORP12/07/2020
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP11/18/2020
DOB NOWPlumbingSigned-offA.M.N. CORPORATION04/30/2020
BISOTISSUEDAPA GROUP INC03/09/2021
BISOTISSUEDJAMAICA HOSPITAL MEDICAL12/03/2020
BISOTISSUEDAPA GROUP INC07/27/2020
BISOTISSUEDJAMAICA HOSPITAL MEDICAL03/05/2020
BISEQISSUEDMETRO CONTRACTING NY, INC.11/25/2015
BISOTISSUEDBANU CONSTRUCTION CORP05/14/2015
BISEQISSUEDMETRO CONTRACTING NY, INC.05/11/2015
BISOTISSUEDBANU CONSTRUCTION CORP04/14/2015
BISEQISSUEDMETRO CONTRACTING NY, INC.11/21/2014
BISEQISSUEDBANU CONSTRUCTION CORP10/31/2013
BISOTISSUEDJAMAICA HOSPITAL MEDICAL10/21/2009
BISOTISSUEDJAMAICA HOSPITAL MEDICAL03/24/2009
BISOTISSUEDJAMAICA HOSPITAL MEDICAL10/16/2006
BISOTISSUEDJAMAICA HOSPITAL MEDICAL10/19/2005
BISPLISSUEDSPARACO'S P&H CORP02/25/2005
BISOTISSUEDJAMAICA HOSPITAL MEDICAL02/25/2005
BISPLISSUEDSPARACO'S P&H CORP09/10/2004
BISOTISSUEDJAMAICA HOSPITAL MEDICAL09/03/2004
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.01/11/2001
BIS—ISSUEDBARR & BARR INC05/11/2000
+ 15 more permits on file
1 project · most recent 12/17/2021
Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/17/2021Signed-offCARE ENTERPRISES, INCAssociated Ducts and Piping, Ventilation Systems
Ventilation
Greenheck CSP-A3300VG 1,460 CFM · Exhaust Fan ×1
SP-B150 76 CFM · Exhaust Fan ×1
Ducts & Piping
__Junk__ 0000 1 BTU · Ductwork ×1
1 project · most recent 12/17/2025
FiledStatusContractorScope
12/17/2025Permit IssuedAMN FIRE CORP257 heads
1 project · most recent 12/17/2025
FiledStatusContractorScope
12/17/2025———
2 projects · most recent 04/20/2021
General Wiring
FiledStatusContractorScope
04/20/2021Permit IssuedHIGH QUALITY ELECTRIC OF—
03/11/2020Permit IssuedJAMAICA HOSPITAL MED CTRGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/15/2026Pass-Final Boiler Equipment InspectionPassView ↗
05/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/26/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/21/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/18/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/18/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
04/20/2026Public Assembly Emergency Lighting—progress
01/29/2026Fire-Resistant Penetrations and JointsDavid Katzspecial
12/17/2025HVAC-R and service water piping design and insulationDavid Katzenergy_progress
12/17/2025Energy Code Compliance InspectionsDavid Katzprogress
12/17/2025Energy Code Compliance InspectionsDavid Katzprogress
11/26/2025Sprinkler SystemsDavid Katzspecial
11/26/2025Fire-Resistant Penetrations and JointsDavid Katzspecial
11/26/2025Mechanical SystemsDavid Katzspecial
11/26/2025FinalDavid Katzprogress
11/26/2025Maintenance informationDavid Katzenergy_progress
11/26/2025HVAC-R and service water heating system controlsDavid Katzenergy_progress
11/26/2025HVAC-R and service water piping design and insulationDavid Katzenergy_progress
11/26/2025HVAC-R and service water heating equipmentDavid Katzenergy_progress
09/29/2025Interior lighting powerDavid Katzenergy_progress
09/29/2025Fire-Resistant Penetrations and JointsDavid Katzspecial
09/29/2025FinalDavid Katzprogress
09/29/2025Fire-Resistance Rated ConstructionDavid Katzprogress
12/21/2021HVAC-R and service water heating equipmentANTHONY MUSUMECIenergy_progress
12/17/2021Energy Code Compliance InspectionsANTHONY MUSUMECIprogress
12/08/2021HVAC-R and service water piping design and insulationJulio Leder-Luisenergy_progress
12/08/2021Fire-Resistant Penetrations and JointsJulio Leder-Luisspecial
12/08/2021Maintenance informationJulio Leder-Luisenergy_progress
12/03/2021Sprinkler SystemsJulio Leder-Luisspecial
12/03/2021Mechanical SystemsJulio Leder-Luisspecial
12/03/2021FinalHANS KUENSTLERprogress
Latest 25 of 30.
▾Documents — 219 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch9
08/26/2026Q00641869-I1Request digital key ↗
08/26/2026Q00641816-I1Request digital key ↗
08/26/2026Q00627228-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
08/14/2026Q00326064-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing Legalization1
08/28/2026Q00276565-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00325988-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/14/2026Q01389998-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/27/2026Q00419046-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026Q00325861-I1Request digital key ↗
▸Applications & Permits26
▸BISWORK PERMIT APPLICATION12
12/03/2020421946050Open ↗
10/01/2020421780013Open ↗
09/18/2020421780013Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
03/16/2020421946050Open ↗
12/27/2019421780013Open ↗
12/18/2019421778909Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
12/03/2020421946050Open ↗
12/03/2020421946050Open ↗
▸Seals & Professional Certifications64
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/28/2026Q00276565-I1Open ↗
08/28/2026Q00325861-I1Open ↗
08/26/2026Q00641993-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
08/31/2026Q00641993-I1Open ↗
08/31/2026Q00641993-I1Open ↗
08/31/2026Q00641993-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026Q00641965-I1Open ↗
09/23/2026Q00641965-I1Open ↗
09/23/2026Q01325466-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
03/16/2020421946050Open ↗
03/16/2020421946050Open ↗
03/14/2020421778909Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
12/27/2019421780013Open ↗
05/05/2015440216874Open ↗
11/19/2014440185602Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
05/05/2015440216874Open ↗
11/19/2014440185602Open ↗
11/15/2013440115304Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
05/05/2015440216874Open ↗
11/19/2014440185602Open ↗
11/15/2013440115304Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/27/2019421780013Open ↗
10/24/2014421041385Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
11/15/2013440115304Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/19/2016421362563Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
12/27/2019421780013Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/28/2026Q00325861-I1Open ↗
08/26/2026Q00641869-I1Open ↗
08/26/2026Q00641816-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
12/27/2019421780013Open ↗
10/24/2014421041385Open ↗
09/10/2014421023788Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/19/2016421362563Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/14/2008410192697Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
12/27/2019421780013Open ↗
12/18/2019421778909Open ↗
09/19/2016421362563Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
06/23/2020421778909Open ↗
10/24/2014421041385Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/19/2020421946050Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/02/2022421780013Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/02/2022421780013Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY8
08/02/2022421780013Open ↗
06/25/2020421946050Open ↗
06/23/2020421778909Open ↗
Showing 3 of 8 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
06/26/2020421780013Open ↗
▸Approvals, Objections & Sign-offs43
▸BISLETTERS - SUPPORTING DOCUMENTATION22
10/01/2020421780013Open ↗
10/01/2020421780013Open ↗
12/27/2019421780013Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
08/28/2026Q00276565-I1Open ↗
08/28/2026Q00325861-I1Open ↗
08/26/2026Q00641869-I1Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
02/04/2026410192697Open ↗
08/23/2022421780013Open ↗
06/25/2020421778909Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
10/24/2014421041385Open ↗
11/14/2008410192697Open ↗
▸BISFINAL1
08/02/2022421780013Open ↗
▸BISSHED LETTER1
12/10/2015440185602Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT9
06/25/2020421778909Open ↗
03/16/2020421946050Open ↗
12/27/2019421780013Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/03/2026410192697Open ↗
08/22/2022421780013Open ↗
▸Filing & Intake Forms18
▸BISEFILING COVER SHEET7
03/16/2020421946050Open ↗
12/27/2019421780013Open ↗
12/18/2019421778909Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION5
02/04/2026410192697Open ↗
04/27/2020421946050Open ↗
12/27/2019421780013Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
05/05/2015440216874Open ↗
11/19/2014440185602Open ↗
11/15/2013440115304Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
10/01/2020421780013Open ↗
09/18/2020421780013Open ↗
▸Other Documents2
▸BISLL-2 6/04-31
10/31/2013440107395Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026Q01325399-I1Open ↗