← Back
Elevator apt, fireproof with stores
Riis II (NYCHA)
134 AVENUE D · BIN 1077552
💬 Discuss this project
1948Year Built
6Stories
D6Building Class
R7-2Zoning
458,591 sfGross Floor Area
590Units
LL97 Covered5 Open Violations 3 unresolved · 2 paperwork only ▸FISP: UNSAFE
Elevator apt, fireproof with stores · Owner of record: NYC HOUSING AUTHORITY · 258,600 sf lot · 1.77 FAR built · Flood zone X500
Locations of Work
Structural
Roof8p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY2907/08/2026
NYCHA1907/08/2026
NYC HOUSING AUTHORITY 9103/22/2026
NYC HOUSING AUTHORITY1603/22/2026
DMD CONTRACTING NY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOEL PHAGOO P.E. PLLC409/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES403/21/2026
JOEL PHAGOO P.E. PLLC103/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
JOEL PHAGOO P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DMD CONTRACTING NY LLCGeneral Contractor907/08/2026
CHARNJIT SINGHElectrical203/21/2026
J & N CONSTRUCTION GROUPGeneral Contractor204/09/2026
A TECH ELEC ENTERPRISESElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK CONSULTING SERVICES, I6198208/11/2025
Building Lifecycle
All (65)Filed (7)Permit Issued (12)Signed Off (5)Facade (FISP) (22)Violation (17)Special Inspection (2)
05/07/2026
Signed off — Alteration
M01148503-I1
05/07/2026
Permit issued — Suspended Scaffold
M01148503-I1-SC
01/30/2026
Signed off — Alteration
M01269494-I1
01/30/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01192783-I1
01/30/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01192786-I1
12/16/2025
Cycle 10 facade report submitted
12/15/2025
Cycle 10 facade report signed — UNSAFE
11/26/2025
Cycle 9 facade report submitted
11/25/2025
Cycle 9 facade report signed — UNSAFE
11/24/2025
Cycle 10 facade inspection completed
11/24/2025
Cycle 9 facade inspection completed
09/10/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01192783-P1
08/13/2025
Permit issued — Suspended Scaffold
M01269494-I1-SC
08/11/2025
Filed — Alteration
M01269494-I1
05/01/2025
Violation issued (ECB, closed)
Construction
03/18/2025
Permit issued — Construction Fence
M01192786-I1-FN
03/18/2025
Permit issued — Sidewalk Shed
M01192783-I1-SH
03/17/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01192783-I1
03/17/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01192786-I1
02/18/2025
Cycle 9 facade report submitted
02/18/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/18/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/28/2025
Cycle 9 facade report signed — UNSAFE
01/23/2025
Violation issued (ECB, closed)
Construction
01/14/2025
Cycle 9 facade inspection completed
12/12/2024
Permit issued — Suspended Scaffold
M01148503-I1-SC
12/05/2024
Filed — Alteration
M01148503-I1
11/26/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY FENCE AS PER PLANS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00038326-I1
10/23/2024
Permit issued — Suspended Scaffold
M01125639-I1-SC
10/11/2024
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM AT 807 EAST 6 STREET, MANHATTAN FOR EXTERIOR FACADE INSPECTION.
M01125639-I1
10/11/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MAHFUZAR RAHMAN
10/11/2024
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/23/2020
Violation issued (ECB, closed)
Construction
06/12/2020
Permit issued — Construction Fence
M00038326-I1-FN
02/04/2020
Permit issued — Construction Fence
M00038326-I1-FN
09/10/2019
Cycle 8 facade report signed — SWARMP
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2019
Cycle 8 facade report submitted
06/28/2019
Cycle 8 facade inspection completed
06/10/2019
Permit issued — Construction Fence
M00038326-I1-FN
04/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/11/2019
Permit issued — Construction Fence
M00038326-I1-FN
06/14/2018
Permit issued — Construction Fence
M00038326-I1-FN
05/03/2018
Permit issued — Construction Fence
M00038326-I1-FN
05/02/2018
Filed — Alteration
INSTALLATION OF TEMPORARY FENCE AS PER PLANS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00038326-I1
12/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/09/2013
Cycle 6 facade report submitted
08/09/2013
Cycle 7 facade report submitted
08/09/2013
Cycle 7 facade report signed — SAFE
07/25/2013
Cycle 7 facade inspection completed
02/28/2012
Cycle 6 facade report submitted
07/16/2010
Violation issued (ECB, closed)
Local Law
04/07/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2010
Cycle 6 facade report submitted
02/16/2010
Cycle 6 facade report signed — UNSAFE
02/16/2010
Cycle 6 facade report signed — UNSAFE
11/21/2008
Violation issued (ECB, closed)
Construction
02/11/2008
Violation issued (ECB, closed)
Elevators
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM05/07/2026
DOB NOWSuspended ScaffoldSigned-offWALL CONTRACTOR CORP08/13/2025
DOB NOWConstruction FenceSigned-offJ & N CONSTRUCTION GROUP03/18/2025
DOB NOWSidewalk ShedSigned-offJ & N CONSTRUCTION GROUP03/18/2025
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM12/12/2024
DOB NOWSuspended ScaffoldPermit IssuedA.B.C.D. CONSTRUCTION COR10/23/2024
DOB NOWConstruction FenceSigned-offDMD CONTRACTING NY06/12/2020
DOB NOWConstruction FenceSigned-offDMD CONTRACTING NY02/04/2020
DOB NOWConstruction FenceSigned-offDMD CONTRACTING NY06/10/2019
DOB NOWConstruction FenceSigned-offDMD CONTRACTING NY02/11/2019
DOB NOWConstruction FenceSigned-offDMD CONTRACTING NY06/14/2018
DOB NOWConstruction FenceSigned-offDMD CONTRACTING NY05/03/2018
BISOTISSUEDDMD CONTRACTING NY LLC02/03/2025
BISOTISSUEDDMD CONTRACTING NY LLC02/03/2025
BISOTISSUEDDMD CONTRACTING NY LLC02/03/2025
BISMHISSUEDMARIC PLUMBING & HEATING04/17/2023
BISMHISSUEDMARIC PLUMBING & HEATING08/17/2022
BISMHISSUEDMARIC PLUMBING & HEATING03/17/2021
BISOTISSUEDDMD CONTRACTING NY LLC01/27/2021
BISOTISSUEDDMD CONTRACTING NY LLC01/27/2021
BISOTISSUEDDMD CONTRACTING NY LLC01/27/2021
BISMHISSUEDMARIC PLUMBING & HEATING04/02/2020
BISOTISSUEDDMD CONTRACTING NY LLC02/04/2020
BISOTISSUEDDMD CONTRACTING NY LLC02/04/2020
BISOTISSUEDDMD CONTRACTING NY LLC02/04/2020
BISPLISSUEDMARIC PLBG & HTG INC07/15/2019
BISMHISSUEDMARIC PLUMBING & HEATING06/06/2019
BISMHISSUEDMARIC PLUMBING & HEATING06/06/2019
BISOTISSUEDDMD CONTRACTING NY LLC06/03/2019
BISOTISSUEDDMD CONTRACTING NY LLC06/03/2019
BISOTISSUEDDMD CONTRACTING NY LLC06/03/2019
BISPLISSUEDMARIC PLBG & HTG INC07/20/2018
BISMHISSUEDMARIC PLUMBING & HEATING07/20/2018
BISOTISSUEDDMD CONTRACTING NY LLC06/29/2018
BISOTISSUEDDMD CONTRACTING NY LLC06/29/2018
BISOTISSUEDDMD CONTRACTING NY LLC06/29/2018
BISOTISSUEDP & K CONTRACTING INC08/25/2015
BISOTISSUEDP & K CONTRACTING INC07/07/2015
BISEQISSUEDP & K CONTRACTING INC05/04/2015
BISEQISSUEDP & K CONTRACTING INC01/28/2015
+ 15 more permits on file
6 projects · most recent 08/15/2025
General Wiring Lighting
FiledStatusContractorScope
08/15/2025CompleteLIT MODE ELECL CONTG INC—
01/17/2025CompleteLIT MODE ELECL CONTG INC—
01/11/2022CompleteMEDCO ELECTRIC, INCGeneral Wiring, Lighting
01/15/2021CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
01/15/2021CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
06/12/2018CompleteA TECH ELEC ENTERPRISESGeneral Wiring
1 project · most recent 10/11/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
10/11/2024Permit Issued—Suspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
10/11/2024Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
10/11/2024Post-installed AnchorsMAHFUZAR RAHMANspecial
▾Documents — 228 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/06/2026M00038326-I1Request digital key ↗
08/26/2026M01125639-I1Request digital key ↗
08/25/2026M01148503-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits51
▸BISPLAN / WORK APPROVAL APPLICATION34
10/06/2025122136116Open ↗
06/30/2025122136116Open ↗
03/18/2025122136116Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION17
02/03/2025122136116Open ↗
02/03/2025122136116Open ↗
02/03/2025122136116Open ↗
Showing 3 of 17 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE COMPLIANCE1
03/18/2024122136116Open ↗
▸Seals & Professional Certifications28
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
07/02/2018122136116Open ↗
07/02/2018122136116Open ↗
07/02/2018122136116Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/06/2026M00038326-I1Open ↗
08/13/2026M01192783-P1Open ↗
08/13/2026M01192783-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
01/26/2015140286278Open ↗
01/26/2015140286287Open ↗
04/09/2014140172881Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
01/26/2015140286278Open ↗
01/26/2015140286287Open ↗
04/09/2014140172881Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
01/26/2015140286278Open ↗
01/26/2015140286287Open ↗
04/09/2014140172881Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026M01125639-I1Open ↗
08/25/2026M01125639-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
11/25/2019122136116Open ↗
04/29/2019122136116Open ↗
05/08/2017122136116Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING2
08/23/2021122136116Open ↗
03/04/2021122136116Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/18/2024122136116Open ↗
▸BISHEATING SYSTEMS1
03/18/2024122136116Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
05/15/2017122136116Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/18/2024122136116Open ↗
▸Safety & Tenant Protection3
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
06/25/2018122136116Open ↗
06/07/2018122136116Open ↗
▸BISTenant Protection Plan and Notes1
05/01/2017122136116Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
08/31/2016140172881Open ↗
04/09/2014140172881Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU6176MN181
07/11/2025122136116Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
02/29/2024122136116Open ↗
02/29/2024122136116Open ↗
11/18/2021122136116Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
07/02/2018122136116Open ↗
07/02/2018122136116Open ↗
08/31/2016140172881Open ↗
Showing 3 of 5 on file for this type
▸BISNYCECC ANALYSIS1
04/09/2014140172881Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/18/2024122136116Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/19/2024122136116Open ↗
▸BISLIGHTING CONTROLS1
03/18/2024122136116Open ↗
▸BIS* HVAC INSULATION AND SEALING1
03/18/2024122136116Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/09/2014140172881Open ↗
▸BISFENESTRATION AIR LEAKAGE1
03/18/2024122136116Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/31/2016140172881Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/18/2024122136116Open ↗
▸Inspections & Test Reports33
▸BISTECHNICAL REPORT: RESPONSIBILITY20
03/17/2025122136116Open ↗
10/02/2024122136116Open ↗
04/29/2024122136116Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
07/02/2018122136116Open ↗
07/02/2018122136116Open ↗
▸BISPOST-INSTALLED ANCHORS1
03/19/2024122136116Open ↗
▸BISFUEL-GAS PIPING (WELDING)1
03/18/2024122136116Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
03/18/2024122136116Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
03/18/2024122136116Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
03/18/2024122136116Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
07/02/2018122136116Open ↗
▸BISMECHANICAL SYSTEMS1
03/18/2024122136116Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
03/18/2024122136116Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
03/18/2024122136116Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
07/26/2024122136116Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
03/18/2024122136116Open ↗
▸Approvals, Objections & Sign-offs16
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
09/06/2026M00038326-I1Open ↗
08/22/2026M01269494-I1Open ↗
08/13/2026M01148503-I1Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
08/31/2016140172881Open ↗
03/18/2016140286287Open ↗
03/16/2016140286278Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION3
07/17/2024122136116Open ↗
02/29/2024122136116Open ↗
05/01/2017122136116Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/01/2011120646382Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/31/2016140172881Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT4
08/22/2025122136116Open ↗
08/31/2016140172881Open ↗
10/07/2014122136116Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
02/03/2025122136116Open ↗
07/02/2018122136116Open ↗
▸Filing & Intake Forms30
▸BISADDITIONAL INFORMATION11
04/10/2025122136116Open ↗
10/07/2024122136116Open ↗
11/19/2021122136116Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM11
02/03/2025122136116Open ↗
02/03/2025122136116Open ↗
02/03/2025122136116Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET5
05/08/2017122136116Open ↗
10/07/2014122136116Open ↗
10/07/2014122136116Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
01/26/2015140286278Open ↗
01/26/2015140286287Open ↗
04/09/2014140172881Open ↗
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
07/02/2018122136116Open ↗
06/08/2018122136116Open ↗
04/04/2012120646382Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
07/07/2015140172881Open ↗
04/30/2015140286278Open ↗
▸DOB NOWCalculations2
08/13/2026M01125639-I1Open ↗
08/13/2026M01269494-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01125639-I1Open ↗
08/13/2026M01269494-I1Open ↗
▸BISMAINTENANCE INFORMATION1
03/18/2024122136116Open ↗
▸BIS* FEMA FORM (81-31): ELEVATION CERTIFICATE1
06/06/2025122136116Open ↗
▸BISSupporting Document: Fee Exempt1
07/07/2015140172881Open ↗
▸BISLOWEST FLOOR ELEVATION1
03/18/2024122136116Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01148503-I1Open ↗