← Back
BuildNYC
Two stories - detached, small or mid-size
134 THORNYCROFT AVENUE
STATEN ISLAND · BIN 5067996
💬 Discuss this project
1955Year Built
2Stories
A1Building Class
R3AZoning
2,000 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,600 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 23p · 2 filings · 7 docs
Floor 14p · 3 filings · 7 docs
Cellar3p · 1 filing · 7 docs
Sub-Basement3p · 2 filings · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Chris Ponisi, Architect306/19/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dawn Ponisi303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Fine MechanicalPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738206/19/2025
Building Lifecycle
11/14/2025
Signed off — Alteration
No Work to be Done - application filed for corrections to I1 document
S01117959-S1
11/13/2025
Signed off — Alteration
S01239748-I1
11/13/2025
Signed off — Alteration
No Work to be Done - application filed for corrections to I1 document
S01117959-I1
09/11/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/08/2025
Permit issued — General Construction
S01239748-I1-GC-CX
18 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNot Applicable09/08/2025
DOB NOWPlumbingSigned-offFine Mechanical03/19/2025
DOB NOWPlumbingSigned-offFine Mechanical03/13/2025
DOB NOWPlumbingSigned-offFine Mechanical12/26/2024
BIS—ISSUEDVantassel Enterprises09/11/1992
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/11/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
09/26/2024Fire-Resistant Penetrations and Jointsanthony santorospecial
09/26/2024Energy Code Compliance Inspectionsanthony santoroprogress
23 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account