← Back
BROOKLYN
134 VANDERBILT AVENUE
BROOKLYN · BIN 3430518
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
1 Open Violation ▸
Locations of Work
Architecture
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
Sub-Cellar1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TANKHOUSE2109/01/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
K S K CONSTRUCTION GROUPGeneral Contractor1407/02/2026
BEST MECHANICAL SVCS INCPlumbing707/02/2026
RIGHTWAY PLBG AND HTG INCFire Protection207/02/2026
UNITED INDUSTRIES & CONSTGeneral Contractor107/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MT GROUP7982008/21/2026
JS BUILDING CONSULTING4959111/19/2025
Building Lifecycle
All (201)Filed (24)Permit Issued (37)Signed Off (9)Violation (1)Inspection (20)Objection (80)Special Inspection (30)
09/01/2026
Signed off — Alteration
General construction application for Apt 7A to reconfigure the primary bedroom entrance, relocate its closet, and add a hallway linen closet. Work includes demolition and erection of nonfire-rated partitions and new doors and frames.
B01307011-I1
08/21/2026
Filed — New Building
Construction of a new 8 story mixed-use building.
B00648774-A5
08/10/2026
Special inspection requirement — Exterior lighting power
CHRISTOPHER BEHLE
08/10/2026
Special inspection requirement — Air barrier - visual inspection
CHRISTOPHER BEHLE
08/10/2026
Special inspection requirement — Interior lighting power
CHRISTOPHER BEHLE
08/10/2026
Special inspection requirement — Lighting controls
CHRISTOPHER BEHLE
08/10/2026
Special inspection requirement — Air barrier — testing
CHRISTOPHER BEHLE
08/10/2026
Special inspection requirement — Fenestration air leakage
CHRISTOPHER BEHLE
08/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTOPHER BEHLE
08/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTOPHER BEHLE
08/10/2026
Special inspection requirement — Energy Code Compliance Inspections
CHRISTOPHER BEHLE
08/10/2026
Special inspection requirement — Electrical motors and elevators
CHRISTOPHER BEHLE
08/10/2026
Special inspection requirement — Protection of exposed foundation insulation
CHRISTOPHER BEHLE
08/10/2026
Special inspection requirement — Fenestration areas
CHRISTOPHER BEHLE
08/10/2026
Special inspection requirement — Insulation placement and R values
CHRISTOPHER BEHLE
08/10/2026
Special inspection requirement — Lighting in dwelling units
CHRISTOPHER BEHLE
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTOPHER BEHLE
08/10/2026
Special inspection requirement — Metering
CHRISTOPHER BEHLE
07/28/2026
Signed off — New Building
Construction of a new 8 story mixed-use building.
B00648774-Z1
06/11/2026
Violation issued (ECB, open)
Construction
05/01/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
02/06/2026
Permit issued — General Construction
B01307011-I1-GC
01/13/2026
Objection resolved — Addressed
12/09/2025
Objection resolved — Addressed
12/02/2025
Objection raised — Scope
12/02/2025
Objection raised — Cost
11/19/2025
Filed — Alteration
General construction application for Apt 7A to reconfigure the primary bedroom entrance, relocate its closet, and add a hallway linen closet. Work includes demolition and erection of nonfire-rated partitions and new doors and frames.
B01307011-I1
08/20/2025
Special inspection requirement — Protection of exposed foundation insulation
CHRISTOPHER BEHLE
08/20/2025
Special inspection requirement — Lighting controls
CHRISTOPHER BEHLE
08/20/2025
Special inspection requirement — Electrical motors and elevators
CHRISTOPHER BEHLE
08/20/2025
Special inspection requirement — Air barrier - visual inspection
CHRISTOPHER BEHLE
08/20/2025
Special inspection requirement — Interior lighting power
CHRISTOPHER BEHLE
08/20/2025
Special inspection requirement — Air barrier — testing
CHRISTOPHER BEHLE
08/20/2025
Special inspection requirement — Fenestration areas
CHRISTOPHER BEHLE
08/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTOPHER BEHLE
08/20/2025
Special inspection requirement — Metering
CHRISTOPHER BEHLE
08/20/2025
Special inspection requirement — Lighting in dwelling units
CHRISTOPHER BEHLE
08/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTOPHER BEHLE
08/20/2025
Special inspection requirement — Fenestration air leakage
CHRISTOPHER BEHLE
08/20/2025
Special inspection requirement — Exterior lighting power
CHRISTOPHER BEHLE
08/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTOPHER BEHLE
07/21/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/17/2025
Signed off — New Building
Construction of a new 8 story mixed-use building.
B00648774-S5
07/17/2025
Signed off — New Building
Construction of a new 8 story mixed-use building.
B00648774-S6
07/17/2025
Signed off — New Building
Construction of a new 8 story mixed-use building.
B00648774-S7
06/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/22/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/15/2025
Signed off — New Building
Construction of a new 8 story mixed-use building.
B00648774-S1
05/08/2025
Permit issued — Curb Cut
B00648774-S9-CC
04/25/2025
Filed — New Building
Construction of a new 8 story mixed-use building.
B00648774-A3
04/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/22/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/15/2025
Objection resolved — Addressed
03/31/2025
Filed — New Building
Construction of a new 8 story mixed-use building.
B00648774-A2
03/28/2025
Permit issued — General Construction
B01198059-I1-GC
03/24/2025
Filed — Alteration
Application is filed for a Temporary Use Permit for 2 model apartments pursuant to Section AC 28-111 & DOB Bulletin 2010-002. Filed in conjunction with NB # B00648774-I1.
B01198059-I1
03/24/2025
Signed off — New Building
Construction of a new 8 story mixed-use building.
B00648774-S2
03/24/2025
Objection raised — Energy
Latest 60 of 201 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSYNC CONSTRUCTION LLC02/06/2026
DOB NOWCurb CutPermit IssuedK S K CONSTRUCTION GROUP05/08/2025
DOB NOWGeneral ConstructionSigned-offK S K CONSTRUCTION GROUP03/28/2025
DOB NOWStandpipeSigned-offBEST MECHANICAL SVCS INC02/19/2025
DOB NOWConstruction FenceSigned-offK S K CONSTRUCTION GROUP01/21/2025
DOB NOWMechanical SystemsSigned-offK S K CONSTRUCTION GROUP11/25/2024
DOB NOWStructuralSigned-offK S K CONSTRUCTION GROUP10/22/2024
DOB NOWStandpipeSigned-offRIGHTWAY PLBG AND HTG INC07/26/2024
DOB NOWStandpipeSigned-offBEST MECHANICAL SVCS INC07/26/2024
DOB NOWFoundationSigned-offK S K CONSTRUCTION GROUP06/18/2024
DOB NOWSupport of ExcavationSigned-offK S K CONSTRUCTION GROUP06/18/2024
DOB NOWGeneral ConstructionPermit IssuedK S K CONSTRUCTION GROUP06/18/2024
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC06/07/2024
DOB NOWStandpipeSigned-offBEST MECHANICAL SVCS INC02/06/2024
DOB NOWConstruction FenceSigned-offK S K CONSTRUCTION GROUP01/29/2024
DOB NOWConstruction FenceSigned-offK S K CONSTRUCTION GROUP01/02/2024
DOB NOWMechanical SystemsSigned-offK S K CONSTRUCTION GROUP12/05/2023
DOB NOWStructuralSigned-offK S K CONSTRUCTION GROUP10/18/2023
DOB NOWFoundationSigned-offK S K CONSTRUCTION GROUP10/17/2023
DOB NOWStructuralSigned-offK S K CONSTRUCTION GROUP07/27/2023
DOB NOWFoundationSigned-offK S K CONSTRUCTION GROUP07/27/2023
DOB NOWGeneral ConstructionPermit IssuedK S K CONSTRUCTION GROUP06/29/2023
DOB NOWFoundationSigned-offK S K CONSTRUCTION GROUP06/29/2023
DOB NOWSupport of ExcavationSigned-offK S K CONSTRUCTION GROUP06/29/2023
DOB NOWSprinklersSigned-offRIGHTWAY PLBG AND HTG INC06/22/2023
DOB NOWStandpipeSigned-offBEST MECHANICAL SVCS INC06/13/2023
DOB NOWPlumbingSigned-offREPUBLIC EXTERIOR SERVICE06/01/2023
DOB NOWFoundationSigned-offK S K CONSTRUCTION GROUP03/31/2023
DOB NOWStructuralSigned-offK S K CONSTRUCTION GROUP03/29/2023
DOB NOWGeneral ConstructionPermit IssuedK S K CONSTRUCTION GROUP03/21/2023
DOB NOWFoundationSigned-offK S K CONSTRUCTION GROUP03/21/2023
DOB NOWStandpipeSigned-offBEST MECHANICAL SVCS INC01/24/2023
DOB NOWConstruction FenceSigned-offK S K CONSTRUCTION GROUP12/01/2022
DOB NOWSupport of ExcavationSigned-offK S K CONSTRUCTION GROUP11/29/2022
DOB NOWMechanical SystemsSigned-offK S K CONSTRUCTION GROUP11/29/2022
DOB NOWFoundationSigned-offK S K CONSTRUCTION GROUP11/28/2022
DOB NOWConstruction FencePermit IssuedUNITED INDUSTRIES & CONST04/07/2022
1 project · most recent 08/21/2026
Air Conditioning Systems Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/21/2026Permit IssuedK S K CONSTRUCTION GROUPAir Conditioning Systems, Associated Ducts and Piping, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-SM48NAMHZ-U1 72,000 BTU · Condensing Unit ×19
TUHYE0723AN40AN 72,000 BTU · Vrf Outdoor ×7
NTXMSH36A142AA 36,000 BTU · Condensing Unit ×1
TRUYA0181KA70NA 18,000 BTU · Condensing Unit ×1
TRUYA0301HA70NA 18,000 BTU · Vrf Outdoor ×1
TURYE1203AN40AN 240,000 BTU · Condensing Unit ×1
Ventilation
Lg ARNU048GSS4 72,000 BTU · Vrf Indoor ×1
Ducts & Piping
N/A N/A Ductwork ×1
1 project · most recent 08/21/2026
Sprinkler System
FiledStatusContractorScope
08/21/2026Signed-offRIGHTWAY PLBG AND HTG INCSprinkler System
1 project · most recent 08/21/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/21/2026Signed-offBEST MECHANICAL SVCS INCStorm, Water/Sanitary
3 projects · most recent 03/09/2026
General Wiring
FiledStatusContractorScope
03/09/2026Permit IssuedTWINTECH ELECTRIC INCGeneral Wiring
01/24/2026Permit IssuedTF ELECTRICAL CORPGeneral Wiring
09/20/2023Permit IssuedDIFAZIO ELECTRIC NY, INCGeneral Wiring
1 project · most recent 08/21/2026
Concrete Masonry
FiledStatusContractorScope
08/21/2026Permit IssuedK S K CONSTRUCTION GROUPConcrete, Masonry
2 projects · most recent 08/21/2026
Fence
FiledStatusContractorScope
08/21/2026Permit IssuedK S K CONSTRUCTION GROUPFence
04/06/2022Permit IssuedUNITED INDUSTRIES & CONSTFence
2 projects · most recent 08/21/2026
Earthwork Support of Excavation Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/21/2026Permit IssuedK S K CONSTRUCTION GROUPEarthwork, Support of Excavation
11/19/2025Signed-offSYNC CONSTRUCTION LLCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
05/01/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
07/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/22/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/18/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
03/18/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/13/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/25/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/19/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
09/15/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/06/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/10/2026Protection of exposed foundation insulationCHRISTOPHER BEHLEenergy_progress
08/10/2026Fire-Resistant Penetrations and JointsCHRISTOPHER BEHLEspecial
08/10/2026MeteringCHRISTOPHER BEHLEenergy_progress
08/10/2026Fenestration air leakageCHRISTOPHER BEHLEenergy_progress
08/10/2026Lighting controlsCHRISTOPHER BEHLEenergy_progress
08/10/2026Fenestration areasCHRISTOPHER BEHLEenergy_progress
08/10/2026Exterior lighting powerCHRISTOPHER BEHLEenergy_progress
08/10/2026Fenestration and door U-factor and product ratingsCHRISTOPHER BEHLEenergy_progress
08/10/2026Air barrier - visual inspectionCHRISTOPHER BEHLEenergy_progress
08/10/2026Air barrier — testing CHRISTOPHER BEHLEenergy_progress
08/10/2026Fire-Resistance Rated ConstructionCHRISTOPHER BEHLEprogress
08/10/2026Energy Code Compliance InspectionsCHRISTOPHER BEHLEprogress
08/10/2026Lighting in dwelling unitsCHRISTOPHER BEHLEenergy_progress
08/10/2026Insulation placement and R valuesCHRISTOPHER BEHLEenergy_progress
08/10/2026Electrical motors and elevatorsCHRISTOPHER BEHLEenergy_progress
08/10/2026Interior lighting powerCHRISTOPHER BEHLEenergy_progress
08/20/2025Fire-Resistant Penetrations and JointsCHRISTOPHER BEHLEspecial
08/20/2025Air barrier - visual inspectionCHRISTOPHER BEHLEenergy_progress
08/20/2025Lighting controlsCHRISTOPHER BEHLEenergy_progress
08/20/2025Protection of exposed foundation insulationCHRISTOPHER BEHLEenergy_progress
08/20/2025Lighting in dwelling unitsCHRISTOPHER BEHLEenergy_progress
08/20/2025MeteringCHRISTOPHER BEHLEenergy_progress
08/20/2025Electrical motors and elevatorsCHRISTOPHER BEHLEenergy_progress
08/20/2025Exterior lighting powerCHRISTOPHER BEHLEenergy_progress
08/20/2025Fenestration areasCHRISTOPHER BEHLEenergy_progress
Latest 25 of 150.
▾Documents — 170 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
08/30/2026B00710829-I1Request digital key ↗
08/28/2026B00648774-S8Request digital key ↗
08/28/2026B00648774-S9Request digital key ↗
Showing 3 of 24 on file for this type
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram6
08/28/2026B00648774-A5Open ↗
08/13/2026B00648774-I1Open ↗
08/13/2026B00648774-P8Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/28/2026B00648774-A5Open ↗
08/13/2026B00648774-A2Open ↗
08/13/2026B00648774-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00648774-I1Open ↗
▸Seals & Professional Certifications81
▸DOB NOWProgress Inspector Seal & Signature34
09/23/2026B00648774-A5Open ↗
09/23/2026B00648774-A5Open ↗
09/23/2026B00648774-A5Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/28/2026B00648774-S8Open ↗
08/28/2026B00648774-S9Open ↗
08/28/2026B00648774-Z1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/23/2026B00648774-A5Open ↗
08/22/2026B00648774-S5Open ↗
08/22/2026B00648774-S2Open ↗
Showing 3 of 22 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026B00648774-I1Open ↗
08/13/2026B00648774-A2Open ↗
08/13/2026B00648774-A4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/28/2026B00648774-I1—
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist6
08/28/2026B00648774-P4Open ↗
08/28/2026B00648774-A5Open ↗
08/28/2026B00648774-A4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00648774-I1Open ↗
▸Environmental & Asbestos23
▸DOB NOWOER: Notice to Proceed16
08/13/2026B00648774-S4Open ↗
08/13/2026B01198059-I1Open ↗
08/13/2026B00648774-S3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWOER: Notice of Satisfaction7
08/13/2026B00648774-S5Open ↗
08/13/2026B00648774-S8Open ↗
08/13/2026B00648774-S4Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00648774-I1Open ↗
▸Other Documents15
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/28/2026B00648774-A5Open ↗
08/13/2026B00648774-A2Open ↗
08/13/2026B00648774-P8Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification6
08/28/2026B00648774-P4Open ↗
08/28/2026B00648774-A5Open ↗
08/28/2026B00648774-A4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial1
08/28/2026B00648774-A5Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00648774-S3Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00648774-I1Open ↗