← Back
Old law tenement
134 WEST 129 STREET
MANHATTAN · Harlem (North) · BIN 1057958
💬 Discuss this project
1910Year Built
5Stories
C4Building Class
R7-2Zoning
9,235 sfGross Floor Area
11Units
Rent Stabilized11 Open Violations 9 unresolved · 2 paperwork only ▸
Old law tenement · Owner of record: AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP. · 2,498 sf lot · 3.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Roof10p · 1 filing · 18 docs
Floor 512p · 1 filing · 18 docs
Floor 412p · 1 filing · 18 docs
Floor 312p · 1 filing · 18 docs
Floor 212p · 1 filing · 18 docs
Floor 111p · 2 filings · 20 docs
Cellar19p · 2 filings · 20 docs
Site & exterior7p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST HARLEM GROUP ASSISTANCE2407/08/2026
METRO CONTRACTING NY903/22/2026
AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP.203/22/2026
WHGA GARVEY HDFC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P. M. ARCHITECTURE, PC805/15/2025
MSM ENGINEERING SERVICES, PLLC210/03/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PM ARCHITECTURE PC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METRO CONTRACTING NY, INC.General Contractor403/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing307/08/2026
HORIZON CONSTRUCTION INCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983705/15/2025
Building Lifecycle
All (112)Filed (10)Permit Issued (7)Signed Off (5)Violation (60)Inspection (4)Special Inspection (26)
04/07/2026
Signed off — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047492-S2
10/17/2025
Signed off — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047492-S1
10/09/2025
Signed off — Alteration
Interior work at cellar, corridors 1st- 5th. Replacement of windows, lighting, building entry doors and roof replacement, All work is as per plan. No change to use, egress, or occupancy under this filing. Minor facade repair work per plan.
M00826734-I1
09/19/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01116407-I1
07/24/2025
Permit issued — General Construction
M00826734-I1-GC
07/11/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/18/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/02/2025
Permit issued — Boiler Equipment
M01047492-S2-BE
05/15/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047492-S2
05/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
04/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
04/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
04/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
04/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
04/09/2025
Special inspection requirement — Heating Systems
ALEXIS SCHLESSINGERMAN
04/08/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047492-P2
04/08/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047492-P1
04/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/13/2025
Signed off — Alteration
M01083685-I1
12/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
12/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
12/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
12/05/2024
Special inspection requirement — Heating Systems
ALEXIS SCHLESSINGERMAN
12/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
12/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
12/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
10/25/2024
Filed — Alteration
Interior work at cellar, corridors 1st- 5th. Replacement of windows, lighting, building entry doors and roof replacement, All work is as per plan. No change to use, egress, or occupancy under this filing. Minor facade repair work per plan.
M00826734-P2
10/10/2024
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
10/10/2024
Special inspection requirement — Insulation placement and R values
ALEXIS SCHLESSINGERMAN
10/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
10/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
10/10/2024
Special inspection requirement — Interior lighting power
ALEXIS SCHLESSINGERMAN
10/10/2024
Special inspection requirement — Fenestration air leakage
ALEXIS SCHLESSINGERMAN
10/10/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEXIS SCHLESSINGERMAN
10/10/2024
Special inspection requirement — Lighting controls
ALEXIS SCHLESSINGERMAN
10/10/2024
Special inspection requirement — Exterior lighting power
ALEXIS SCHLESSINGERMAN
10/10/2024
Special inspection requirement — Air barrier - visual inspection
ALEXIS SCHLESSINGERMAN
10/10/2024
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
10/03/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01116407-I1
10/03/2024
Permit issued — Supported Scaffold
M01116407-I1-SF
09/04/2024
Permit issued — Boiler Equipment
M01047492-I1-BE
09/04/2024
Permit issued — Plumbing
M01047492-S1-PL
07/23/2024
Filed — Alteration
M01083685-I1
07/23/2024
Permit issued — Sidewalk Shed
M01083685-I1-SH
07/18/2024
Permit issued — General Construction
M00826734-I1-GC
06/13/2024
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047492-S1
06/13/2024
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047492-I1
06/12/2024
Filed — Alteration
Interior work at cellar, corridors 1st- 5th. Replacement of windows, lighting, building entry doors and roof replacement, All work is as per plan. No change to use, egress, or occupancy under this filing. Minor facade repair work per plan.
M00826734-P1
07/12/2023
Violation issued (HPD, closed)
B
07/12/2023
Violation issued (HPD, closed)
A
05/02/2023
Violation issued (HPD, open)
A
05/02/2023
Violation issued (HPD, open)
B
05/02/2023
Violation issued (HPD, open)
B
05/02/2023
Violation issued (HPD, open)
A
05/02/2023
Violation issued (HPD, open)
A
05/02/2023
Violation issued (HPD, open)
B
03/22/2023
Filed — Alteration
Interior work at cellar, corridors 1st- 5th. Replacement of windows, lighting, building entry doors and roof replacement, All work is as per plan. No change to use, egress, or occupancy under this filing. Minor facade repair work per plan.
M00826734-I1
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC07/24/2025
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.06/02/2025
DOB NOWSupported ScaffoldSigned-offMETRO CONTRACTING NY, INC.10/03/2024
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.09/04/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.09/04/2024
DOB NOWSidewalk ShedSigned-offMETRO CONTRACTING NY, INC.07/23/2024
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC07/18/2024
BISOTISSUEDAP. TEK RESTORATION INC08/06/2010
1 project · most recent 05/15/2025
Gas
FiledStatusContractorScope
05/15/2025Signed-offAMERICAN STANDARD P&H CORGas
2 projects · most recent 10/23/2024
General Wiring
FiledStatusContractorScope
10/23/2024CompleteHI-RITE ELECTRIC CORPGeneral Wiring
07/23/2024CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/18/2025Pass-Final Boiler Equipment InspectionPassView ↗
06/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
05/15/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
04/09/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
04/09/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
04/09/2025HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
04/09/2025HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
04/09/2025Heating SystemsALEXIS SCHLESSINGERMANspecial
04/01/2025Tenant Protection Plan Compliance—special
12/16/2024HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
12/16/2024HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
12/16/2024HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
12/05/2024Heating SystemsALEXIS SCHLESSINGERMANspecial
12/05/2024Tenant Protection Plan Compliance—special
12/05/2024HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
12/05/2024HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
12/05/2024HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
10/10/2024Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
10/10/2024Insulation placement and R valuesALEXIS SCHLESSINGERMANenergy_progress
10/10/2024Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
10/10/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
10/10/2024Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
10/10/2024Fenestration air leakageALEXIS SCHLESSINGERMANenergy_progress
10/10/2024Fenestration and door U-factor and product ratingsALEXIS SCHLESSINGERMANenergy_progress
10/10/2024Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
10/10/2024Exterior lighting powerALEXIS SCHLESSINGERMANenergy_progress
10/10/2024Air barrier - visual inspectionALEXIS SCHLESSINGERMANenergy_progress
Latest 25 of 26.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/31/2026M00826734-P1Request digital key ↗
08/31/2026M00826734-P2Request digital key ↗
08/31/2026M00826734-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/10/2010120431194Open ↗
▸BISWORK PERMIT APPLICATION1
08/10/2010120431194Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/31/2026M00826734-P1Open ↗
08/31/2026M00826734-I1Open ↗
08/27/2026M01047492-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026M01047492-S2Open ↗
09/23/2026M01047492-I1Open ↗
09/23/2026M01047492-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026M01047492-S2Open ↗
09/23/2026M01047492-I1Open ↗
09/01/2026M00826734-P2Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/10/2010120431194Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/10/2010120431194Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/10/2010120431194Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/31/2026M00826734-P1Open ↗
08/31/2026M00826734-I1Open ↗
08/27/2026M01047492-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/10/2010120431194Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/27/2026M01047492-I1Open ↗
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/31/2026M00826734-P1Open ↗
08/31/2026M00826734-I1Open ↗
08/27/2026M01047492-I1Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
08/10/2010120431194Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/10/2010120431194Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/10/2010120431194Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/31/2026M00826734-I1Open ↗
08/31/2026M00826734-P1Open ↗
08/13/2026M00826734-P2Open ↗