Office with commercial, 7-19 stories
134 WEST 29 STREET
MANHATTAN · BIN 1015129
💬 Discuss this project
1910Year Built
12Stories
O6Building Class
M1-8A/R11Zoning
115,991 sfGross Floor Area
20Units
LL97 Covered4 Open Violations 3 unresolved · 1 paperwork only ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: 134 WEST 29TH ST OWN CORP · 9,875 sf lot · 11.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction12p · 3 filings · 12 docs
Floor 101p · 1 filing · 3 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 14p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK CONTRACTING GROUP209/13/2026
BERIK MANAGEMENT2408/29/2026
FIDELIS CONSTRUCTION MANAGEMENT807/08/2026
TERESHARAN PARTNERS, LP703/22/2026
134 WEST 29TH STREET OWNERS4703/22/2026
134 WEST 29TH OWNERS CORP103/22/2026
134 W 29 ST OWNERS CORP1303/22/2026
OWNER OF 134 WEST 29 ST103/22/2026
134 WEST 29TH ST CORP.103/22/2026
THK REALTY CORPORATION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALWAYS FAST SERVICES CORP108/01/2026
EOC-NY106/03/2026
MISRA & ASSOCIATES, P.C.203/11/2023
PROJECT TACTICAL SOLUTIONS, LLC112/13/2021
ASHRAF CORP111/15/2021
KZ ENGINEERING, P.C108/31/2021
MOTTOLA RINI ENGINEERS211/13/2019
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FIDELIS CONSTRUCTION MGMTGeneral Contractor1407/08/2026
CS BRIDGE CORPGeneral Contractor307/08/2026
TJS NY INCGeneral Contractor303/21/2026
D.B.J. CONTRACTING CORPGeneral Contractor203/21/2026
REEM PLBG & HTG CORPFire Protection207/08/2026
DORNEVIL, DAVIDElectrical103/21/2026
FIT FABRICATIONElectrical103/21/2026
HILTON, TYRONEElectrical103/21/2026
KWONG MING ELECTRIC INCElectrical103/22/2026
MUSTARO, JOHNElectrical103/21/2026
AI FANG WUElectrical103/21/2026
RYBACKI, DAVIDElectrical103/21/2026
SANG CHEUNGElectrical103/21/2026
TJ SIGNS UNLIMITED INCElectrical103/21/2026
MNK ENTERPRISES LLCGeneral Contractor107/08/2026
PARK CONTRACTING GROUPGeneral Contractor108/04/2026
NORTON, DORIONElectrical103/21/2026
ALVARADO, HERIBERTOElectrical103/21/2026
ANTONY GIRONTAElectrical103/21/2026
BERGER, HElectrical103/21/2026
DORKIN, MARTINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EMPIRE DESIGN CORP5474107/03/2026
EOC-NY6548106/03/2026
PROJECT TACTICAL SOLUTION5859112/13/2021
MOTTOLA RINI ENGINEERS, P3251211/13/2019
Building Lifecycle
All (124)Filed (10)Permit Issued (15)Signed Off (3)Facade (FISP) (13)Violation (60)Inspection (3)Objection (4)Special Inspection (16)
08/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/03/2026
Permit issued — Sidewalk Shed
M01438516-I1-SH
08/01/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01438516-I1
07/16/2026
Permit issued — Suspended Scaffold
M01419447-I1-SC
07/06/2026
Permit issued — General Construction
M01375150-I1-GC
07/03/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR FACADE RESTORATION WORK WITH INSPECTIONS AT 134 WEST 29TH STREET, MANHATTAN.
M01419447-I1
07/03/2026
Special inspection requirement — Post-installed Anchors
Md Rashid
06/03/2026
Filed — Alteration
M01375150-I1
06/03/2026
Special inspection requirement — Masonry
David Merabyan
03/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Merabyan
03/19/2026
Special inspection requirement — Final
David Merabyan
03/19/2026
Special inspection requirement — Post-installed Anchors
David Merabyan
06/29/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/19/2023
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00581552-I1
04/21/2023
Cycle 9 facade report signed — SWARMP
03/20/2023
Cycle 9 facade inspection completed
03/17/2023
Permit issued — General Construction
M00808183-I1-GC
03/11/2023
Filed — Alteration
Demolition of interior non-load bearing partitions and finishes, removal of the mezzanine. Construction of new interior non-load bearing portions. No change in use, use, egress, or occupancy.
M00808183-P1
01/13/2023
Filed — Alteration
Demolition of interior non-load bearing partitions and finishes, removal of the mezzanine. Construction of new interior non-load bearing portions. No change in use, use, egress, or occupancy.
M00808183-I1
01/10/2023
Cycle 9 facade report submitted
12/22/2022
Violation issued (ECB, open)
Local Law
11/29/2022
Permit issued — Supported Scaffold
M00630569-I1-SF
11/29/2022
Permit issued — General Construction
M00613402-I1-GC
10/27/2022
Permit issued — Supported Scaffold
M00630569-I1-SF
10/26/2022
Permit issued — General Construction
M00613402-I1-GC
09/01/2022
Permit issued — Sidewalk Shed
M00581552-I1-SH
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/28/2021
Permit issued — General Construction
M00613402-I1-GC
12/13/2021
Filed — Alteration
M00613402-I1
11/16/2021
Permit issued — Supported Scaffold
M00630569-I1-SF
11/15/2021
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00630569-I1
09/20/2021
Violation issued (ECB, closed)
Construction
09/01/2021
Permit issued — Sidewalk Shed
M00581552-I1-SH
08/31/2021
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00581552-I1
07/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/14/2020
Signed off — Alteration
Mechanical Work in conjunction with Office Space Renovation for Suite 1001 as per plans filed herewith. No change in egress, use or occupancy.
M00253859-I1
08/12/2020
Signed off — Alteration
Sprinkler Work in conjunction with Office Space Fit Out on 10th Floor Suite 1001 as per plans filed herewith. No change in egress, use or occupancy.
M00253831-I1
01/16/2020
Permit issued — Sprinklers
M00253831-I1-EW-SP
12/31/2019
Permit issued — Mechanical Systems
M00253859-I1-MS
12/26/2019
Permit issued — Sprinklers
M00253831-I1-EW-SP
11/25/2019
Violation issued (ECB, closed)
Construction
11/20/2019
Objection raised — Inspections
11/20/2019
Objection resolved — Addressed
11/20/2019
Objection raised — Scope
11/20/2019
Objection resolved — Addressed
11/13/2019
Filed — Alteration
Mechanical Work in conjunction with Office Space Renovation for Suite 1001 as per plans filed herewith. No change in egress, use or occupancy.
M00253859-I1
11/13/2019
Filed — Alteration
Sprinkler Work in conjunction with Office Space Fit Out on 10th Floor Suite 1001 as per plans filed herewith. No change in egress, use or occupancy.
M00253831-I1
10/28/2019
Special inspection requirement — Final
Anthony Rini, III
10/28/2019
Special inspection requirement — Energy Code Compliance Inspections
Anthony Rini, III
10/28/2019
Special inspection requirement — HVAC insulation and sealing
Anthony Rini, III
10/28/2019
Special inspection requirement — Permanent certificate
Anthony Rini, III
10/28/2019
Special inspection requirement — HVAC and service water heating equipment
Anthony Rini, III
10/28/2019
Special inspection requirement — Duct leakage testing
Anthony Rini, III
10/28/2019
Special inspection requirement — Shutoff dampers
Anthony Rini, III
10/28/2019
Special inspection requirement — Electrical motors
Anthony Rini, III
10/28/2019
Special inspection requirement — HVAC and service water heating system controls
Anthony Rini, III
10/28/2019
Special inspection requirement — Maintenance information
Anthony Rini, III
10/28/2019
Special inspection requirement — Mechanical Systems
Anthony Rini, III
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPARK CONTRACTING GROUP08/03/2026
DOB NOWSuspended ScaffoldPermit IssuedAZI CONSTRUCTION CORP07/16/2026
DOB NOWGeneral ConstructionPermit IssuedMNK ENTERPRISES LLC07/06/2026
DOB NOWGeneral ConstructionPermit IssuedTJS NY INC03/17/2023
DOB NOWSupported ScaffoldPermit IssuedFIDELIS CONSTRUCTION MGMT11/29/2022
DOB NOWGeneral ConstructionPermit IssuedFIDELIS CONSTRUCTION MGMT11/29/2022
DOB NOWSupported ScaffoldPermit IssuedFIDELIS CONSTRUCTION MGMT10/27/2022
DOB NOWGeneral ConstructionPermit IssuedFIDELIS CONSTRUCTION MGMT10/26/2022
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP09/01/2022
DOB NOWGeneral ConstructionPermit IssuedFIDELIS CONSTRUCTION MGMT12/28/2021
DOB NOWSupported ScaffoldPermit IssuedFIDELIS CONSTRUCTION MGMT11/16/2021
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP09/01/2021
DOB NOWSprinklersSigned-offREEM PLBG & HTG CORP01/16/2020
DOB NOWMechanical SystemsSigned-offDBJ CONTRACTING12/31/2019
DOB NOWSprinklersSigned-offREEM PLBG & HTG CORP12/26/2019
BISOTISSUEDTJS NY INC06/11/2020
BISOTISSUEDD.B.J. CONTRACTING CORP01/22/2020
BISMHISSUEDA.W. & S. CONSTRUCTION CO06/20/2019
BISOTISSUEDRINNOVO CONSTRUCTION, LLC02/21/2019
BISOTISSUEDRINNOVO CONSTRUCTION, LLC01/17/2019
BISSPISSUEDFULL CAPACITY FIRE CORP12/18/2018
BISPLISSUEDWILLIAM C. GERAKARIS P&H12/07/2018
BISMHISSUEDA.W. & S. CONSTRUCTION CO11/28/2018
BISOTISSUEDA.W. & S. CONSTRUCTION CO11/28/2018
BIS—ISSUEDD.B.J. CONTRACTING CORP11/07/2018
BISOTISSUEDFMG GENERAL CONTRACTING *10/17/2018
BISMHISSUEDFMG GENERAL CONTRACTING *10/17/2018
BISPLISSUEDPREMIER FLOW PLBG AND HTG05/03/2018
BIS—ISSUEDD.B.J. CONTRACTING CORP12/04/2017
BISMHISSUEDKABACK ENTERPRISES INC05/18/2017
BISSPISSUEDFLOW-RIGHT FIRE SUPP CORP04/21/2017
BISPLISSUEDZARA PLUMBING CORP05/04/2016
BISMHISSUEDMETROPOLITAN BUILDERS OF02/25/2016
BISOTISSUEDMETROPOLITAN BUILDERS OF02/25/2016
BISMHISSUEDJORGE CONSTRUCTION CORP02/02/2016
BISOTISSUEDJORGE CONSTRUCTION CORP02/01/2016
BISSPISSUEDFLOW-RIGHT FIRE SUPP CORP01/27/2016
BISPLISSUEDDV PLUMBING INC01/22/2016
BISOTISSUEDMETROPOLITAN BUILDERS OF01/21/2016
BISMHISSUEDMETROPOLITAN BUILDERS OF01/21/2016
+ 25 more permits on file
8 projects · most recent 09/01/2026
General Wiring Lighting
FiledStatusContractorScope
09/01/2026Permit IssuedACCURATE ELEC'L CONTR'S C—
08/01/2026Permit IssuedRICHARD NEU—
08/24/2023Permit IssuedKWONG MING ELECTRIC INC1 meters, 1 new_meters
03/16/2023Permit IssuedAL-LECTRIC ELECT'L CONTRGGeneral Wiring
08/24/2021CompleteNASH ELECTRIC SERVICES IN—
01/08/2020CompleteJER ELECTRIC CORPGeneral Wiring, Lighting
06/20/2019CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
11/29/2018Permit IssuedQUEUE ELEC'L CONTRS, INCGeneral Wiring
2 projects · most recent 08/01/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
08/01/2026Permit IssuedPARK CONTRACTING GROUPSidewalk Shed
11/15/2021Permit IssuedFIDELIS CONSTRUCTION MGMTScaffold
1 project · most recent 07/03/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/03/2026Permit IssuedAZI CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/29/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
07/03/2026Post-installed AnchorsMd Rashidspecial
06/03/2026MasonryDavid Merabyanspecial
03/19/2026Structural Stability – Alterations of existing buildingsDavid Merabyanspecial
03/19/2026FinalDavid Merabyanprogress
03/19/2026Post-installed AnchorsDavid Merabyanspecial
10/28/2019FinalAnthony Rini, IIIprogress
10/28/2019Energy Code Compliance InspectionsAnthony Rini, IIIprogress
10/28/2019HVAC insulation and sealing Anthony Rini, IIIenergy_progress
10/28/2019Permanent certificateAnthony Rini, IIIenergy_progress
10/28/2019HVAC and service water heating equipment Anthony Rini, IIIenergy_progress
10/28/2019Duct leakage testing Anthony Rini, IIIenergy_progress
10/28/2019Shutoff dampersAnthony Rini, IIIenergy_progress
10/28/2019Electrical motorsAnthony Rini, IIIenergy_progress
10/28/2019HVAC and service water heating system controls Anthony Rini, IIIenergy_progress
10/28/2019Maintenance informationAnthony Rini, IIIenergy_progress
10/28/2019Mechanical SystemsAnthony Rini, IIIspecial
▾Documents — 482 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch8
09/03/2026M00581552-I1Request digital key ↗
09/03/2026M00630569-I1Request digital key ↗
09/03/2026M00613402-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00253859-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00253831-I1Request digital key ↗
▸Applications & Permits99
▸BISPLAN / WORK APPROVAL APPLICATION48
05/06/2020123911348Open ↗
01/02/2020140876194Open ↗
11/22/2019140876194Open ↗
Showing 3 of 48 on file for this type
▸BISWORK PERMIT APPLICATION48
06/11/2020123911348Open ↗
01/22/2020140876194Open ↗
06/26/2019123767183Open ↗
Showing 3 of 48 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
06/11/2020123911348Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/21/2018123161327Open ↗
▸BISPLACE OF ASSEMBLY1
11/23/2018123418275Open ↗
▸Seals & Professional Certifications132
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION57
05/06/2020123911348Open ↗
06/28/2019123767183Open ↗
01/18/2019123655543Open ↗
Showing 3 of 57 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST23
05/06/2020123911348Open ↗
06/28/2019123767183Open ↗
01/14/2019123655543Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT18
05/06/2020123911348Open ↗
06/28/2019123767183Open ↗
01/14/2019123655543Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
08/31/2026M00253859-I1Open ↗
08/31/2026M00253859-I1Open ↗
08/31/2026M00253859-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/03/2026M00581552-I1Open ↗
09/03/2026M00613402-I1Open ↗
08/31/2026M00808183-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026M00253859-I1Open ↗
08/27/2026M01375150-I1Open ↗
08/24/2026M01419447-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/22/2019140876194Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment30
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
10/17/2018123543380Open ↗
04/30/2018123432062Open ↗
12/20/2016122648821Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
08/26/2020123767183Open ↗
08/25/2020123767183Open ↗
05/15/2017122622885Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS3
08/26/2020123767183Open ↗
08/25/2020123767183Open ↗
05/15/2017122622885Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSPRINKLER SYSTEMS1
01/07/2022123543380Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
10/17/2017123161327Open ↗
Showing 1 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/06/2020123911348Open ↗
▸Environmental & Asbestos37
▸BISASBESTOS: CERTIFICATION (DEP ACP5)22
05/06/2020123911348Open ↗
11/22/2019140876194Open ↗
06/28/2019123767183Open ↗
Showing 3 of 22 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/03/2026M00613402-I1Open ↗
08/31/2026M00808183-P1Open ↗
08/31/2026M00808183-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS23
05/06/2020123911348Open ↗
06/28/2019123767183Open ↗
01/18/2019123655543Open ↗
Showing 3 of 23 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
08/25/2020123767183Open ↗
06/07/2017123035134Open ↗
04/18/2017122622885Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
01/07/2022123543380Open ↗
08/25/2020123767183Open ↗
01/22/2020140876194Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/07/2022123543380Open ↗
08/04/2020140876194Open ↗
▸BISINTERIOR LIGHTING POWER2
01/07/2022123543380Open ↗
08/04/2020140876194Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
01/07/2022123543380Open ↗
08/04/2020140876194Open ↗
▸BIS* HVAC INSULATION AND SEALING1
01/07/2022123543380Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY5
01/07/2022123543380Open ↗
08/25/2020123767183Open ↗
01/22/2020140876194Open ↗
Showing 3 of 5 on file for this type
▸BISTR1 ACKNOWLEDGING RDP WILL BE RESPONSIBLE FOR FINAL INSPECTION (3A)1
08/04/2020140876194Open ↗
▸BISPOST-INSTALLED ANCHORS1
01/07/2022123543380Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
06/11/2020123911348Open ↗
▸BISTR1 CERTIFYING COMPLETION OF FINAL INSPECTION (3C)1
08/04/2020140876194Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/07/2022123543380Open ↗
▸BISTR1 IDENTIFYING RDP ASSUMING RESPONSIBILITY FOR FINAL ISPECTION (3B)1
08/04/2020140876194Open ↗
▸BISMECHANICAL SYSTEMS1
01/07/2022123543380Open ↗
▸Approvals, Objections & Sign-offs34
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
10/11/2022123543380Open ↗
08/25/2020123767183Open ↗
08/04/2020140876194Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUPERSEDING LETTER2
11/28/2018123543380Open ↗
11/28/2018123543380Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
10/11/2017123161327Open ↗
01/11/2017122648821Open ↗
▸BISFINAL1
01/07/2022123543380Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership44
▸BISCOST AFFIDAVIT42
08/25/2020123767183Open ↗
05/06/2020123911348Open ↗
11/22/2019140876194Open ↗
Showing 3 of 42 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
10/05/2022123543380Open ↗
08/04/2020140876194Open ↗
▸Filing & Intake Forms35
▸BISEFILING COVER SHEET23
05/06/2020123911348Open ↗
06/28/2019123767183Open ↗
01/14/2019123655543Open ↗
Showing 3 of 23 on file for this type
▸BISADDITIONAL INFORMATION6
01/17/2020140876194Open ↗
02/07/2017122622885Open ↗
01/11/2017122648821Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
05/06/2020123911348Open ↗
12/19/2018123543380Open ↗
11/21/2018123161327Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
11/22/2019140876194Open ↗
Showing 1 of 3 on file for this type
▸Other Documents4
▸BISMAINTENANCE INFORMATION1
01/07/2022123543380Open ↗
▸BISPLOT DIAGRAM1
10/11/2017123161327Open ↗
▸DOB NOWCalculations1
08/16/2026M01419447-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01419447-I1Open ↗