Office with commercial, 7-19 stories
134 WEST 29TH STREET
MANHATTAN · BIN 1015129
💬 Discuss this project
1910Year Built
12Stories
O6Building Class
M1-8A/R11Zoning
115,991 sfGross Floor Area
20Units
LL97 Covered1 Active Violation 0 unresolved · 1 paperwork only 2 old, status unconfirmed ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: 134 West 29th St Own · 9,875 sf lot · 11.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBerik ManagementUnder Construction12p · 3 filings · 12 docs
Floor 12Sitasons International Inc1 filing · 5 docs
Floor 11
Floor 10Schwartz, Ponterio & Levenson6p · 2 filings · 17 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Teresharan Land CO. OF. Manhattan LLC As Tic4p · 1 filing · 6 docs
Site & exteriorBerik ManagementUnder Construction21p · 5 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
134 West 29th St Owners5403/22/2026
CS 134 W 29th Street1503/21/2026
Teresharan Partners703/22/2026
Sitasons International510/13/2026
Rugs USA Holdings403/21/2026
Tersheran Land Company of Manha203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Clip Architects108/28/2026
Always Fast Services108/01/2026
Eoc-NY106/03/2026
Misra & Associates203/11/2023
Project Tactical Solutions112/13/2021
Ashraf111/15/2021
KZ Engineering108/31/2021
Mottola Rini Engineers211/13/2019
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Fidelis Construction ManagementScaffold707/08/2026
Fidelis Construction ManagementGeneral Contractor707/08/2026
TJS NYGeneral Contractor303/21/2026
CS BridgeScaffold307/08/2026
D.B.J. ContractingGeneral Contractor203/21/2026
Reem Plumbing & HeatingFire Protection207/08/2026
Polyphase Electrical ContractorsElectrical103/21/2026
Dorion Norton Electrical ContElectrical103/21/2026
Kwong Ming ElectricElectrical103/21/2026
MNK EnterprisesGeneral Contractor107/08/2026
Park Contracting GroupScaffold108/04/2026
AL-Lectric Elect'l ContractingElectrical103/21/2026
Agir Electrical Ltd D/B/AElectrical103/21/2026
Arber Electric ServiceElectrical103/21/2026
Skyline Electrical ContractingElectrical103/21/2026
Kwong Ming ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Empire Design5474107/03/2026
Eoc-NY6548106/03/2026
Project Tactical Solution5859112/13/2021
Mottola Rini Engineers, P3251211/13/2019
Building Lifecycle
All (125)Filed (11)Permit Issued (15)Signed Off (4)Facade (FISP) (13)Violation (60)Objection (4)Special Inspection (18)
10/12/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01438516-I1
08/28/2026
Filed — Alteration
AN EXISTING 12 STORY WITH CELLAR COMMERCIAL BUILDING WITH INTERIOR RENOVATION AT EXISTING COMMERCIAL SPACE ON 12TH FLOOR.NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01451892-I1
08/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Jaeyoung Jang
08/26/2026
Special inspection requirement — Final
Jaeyoung Jang
08/03/2026
Permit issued — Sidewalk Shed
M01438516-I1-SH
08/01/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01438516-I1
07/16/2026
Permit issued — Suspended Scaffold
M01419447-I1-SC
07/06/2026
Permit issued — General Construction
M01375150-I1-GC
07/03/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR FACADE RESTORATION WORK WITH INSPECTIONS AT 134 WEST 29TH STREET, MANHATTAN.
M01419447-I1
07/03/2026
Special inspection requirement — Post-installed Anchors
Md Rashid
06/03/2026
Filed — Alteration
M01375150-I1
06/03/2026
Special inspection requirement — Masonry
David Merabyan
03/19/2026
Special inspection requirement — Final
David Merabyan
03/19/2026
Special inspection requirement — Post-installed Anchors
David Merabyan
03/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Merabyan
05/19/2023
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00581552-I1
04/21/2023
Cycle 9 facade report signed — SWARMP
03/20/2023
Cycle 9 facade inspection completed
03/17/2023
Permit issued — General Construction
M00808183-I1-GC
03/11/2023
Filed — Alteration
Demolition of interior non-load bearing partitions and finishes, removal of the mezzanine. Construction of new interior non-load bearing portions. No change in use, use, egress, or occupancy.
M00808183-P1
01/13/2023
Filed — Alteration
Demolition of interior non-load bearing partitions and finishes, removal of the mezzanine. Construction of new interior non-load bearing portions. No change in use, use, egress, or occupancy.
M00808183-I1
01/10/2023
Cycle 9 facade report submitted
12/22/2022
Violation issued (ECB, open)
Local Law
11/29/2022
Permit issued — General Construction
M00613402-I1-GC
11/29/2022
Permit issued — Supported Scaffold
M00630569-I1-SF
10/27/2022
Permit issued — Supported Scaffold
M00630569-I1-SF
10/26/2022
Permit issued — General Construction
M00613402-I1-GC
09/01/2022
Permit issued — Sidewalk Shed
M00581552-I1-SH
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/28/2021
Permit issued — General Construction
M00613402-I1-GC
12/13/2021
Filed — Alteration
M00613402-I1
11/16/2021
Permit issued — Supported Scaffold
M00630569-I1-SF
11/15/2021
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00630569-I1
09/20/2021
Violation issued (ECB, closed)
Construction
09/01/2021
Permit issued — Sidewalk Shed
M00581552-I1-SH
08/31/2021
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00581552-I1
07/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/14/2020
Signed off — Alteration
Mechanical Work in conjunction with Office Space Renovation for Suite 1001 as per plans filed herewith. No change in egress, use or occupancy.
M00253859-I1
08/12/2020
Signed off — Alteration
Sprinkler Work in conjunction with Office Space Fit Out on 10th Floor Suite 1001 as per plans filed herewith. No change in egress, use or occupancy.
M00253831-I1
01/16/2020
Permit issued — Sprinklers
M00253831-I1-EW-SP
12/31/2019
Permit issued — Mechanical Systems
M00253859-I1-MS
12/26/2019
Permit issued — Sprinklers
M00253831-I1-EW-SP
11/25/2019
Violation issued (ECB, closed)
Construction
11/20/2019
Objection raised — Inspections
11/20/2019
Objection resolved — Addressed
11/20/2019
Objection raised — Scope
11/20/2019
Objection resolved — Addressed
11/13/2019
Filed — Alteration
Mechanical Work in conjunction with Office Space Renovation for Suite 1001 as per plans filed herewith. No change in egress, use or occupancy.
M00253859-I1
11/13/2019
Filed — Alteration
Sprinkler Work in conjunction with Office Space Fit Out on 10th Floor Suite 1001 as per plans filed herewith. No change in egress, use or occupancy.
M00253831-I1
10/28/2019
Special inspection requirement — Shutoff dampers
Anthony Rini, III
10/28/2019
Special inspection requirement — Electrical motors
Anthony Rini, III
10/28/2019
Special inspection requirement — Mechanical Systems
Anthony Rini, III
10/28/2019
Special inspection requirement — Maintenance information
Anthony Rini, III
10/28/2019
Special inspection requirement — HVAC and service water heating system controls
Anthony Rini, III
10/28/2019
Special inspection requirement — Final
Anthony Rini, III
10/28/2019
Special inspection requirement — Energy Code Compliance Inspections
Anthony Rini, III
10/28/2019
Special inspection requirement — HVAC insulation and sealing
Anthony Rini, III
10/28/2019
Special inspection requirement — Permanent certificate
Anthony Rini, III
10/28/2019
Special inspection requirement — HVAC and service water heating equipment
Anthony Rini, III
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPark Contracting Group08/03/2026
DOB NOWSuspended ScaffoldPermit IssuedAzi Construction07/16/2026
DOB NOWGeneral ConstructionPermit IssuedMNK Enterprises07/06/2026
DOB NOWGeneral ConstructionPermit IssuedTJS NY03/17/2023
DOB NOWGeneral ConstructionPermit IssuedFidelis Construction Management11/29/2022
DOB NOWSupported ScaffoldPermit IssuedFidelis Construction Management11/29/2022
DOB NOWSupported ScaffoldPermit IssuedFidelis Construction Management10/27/2022
DOB NOWGeneral ConstructionPermit IssuedFidelis Construction Management10/26/2022
DOB NOWSidewalk ShedSigned-offCS Bridge09/01/2022
DOB NOWGeneral ConstructionPermit IssuedFidelis Construction Management12/28/2021
DOB NOWSupported ScaffoldPermit IssuedFidelis Construction Management11/16/2021
DOB NOWSidewalk ShedSigned-offCS Bridge09/01/2021
DOB NOWSprinklersSigned-offReem Plumbing & Heating01/16/2020
DOB NOWMechanical SystemsSigned-offDBJ Contracting12/31/2019
DOB NOWSprinklersSigned-offReem Plumbing & Heating12/26/2019
BISOTISSUEDTJS NY06/11/2020
BISOTISSUEDD.B.J. Contracting01/22/2020
BISMHISSUEDA.W. & S. Construction Co06/20/2019
BISOTISSUEDRinnovo Construction02/21/2019
BISOTISSUEDRinnovo Construction01/17/2019
BISSPISSUEDFull Capacity Fire12/18/2018
BISPLISSUEDWilliam C. Gerakaris P&H12/07/2018
BISMHISSUEDA.W. & S. Construction Co11/28/2018
BISOTISSUEDA.W. & S. Construction Co11/28/2018
BIS—ISSUEDD.B.J. Contracting11/07/2018
BISOTISSUEDFMG General Contracting *10/17/2018
BISMHISSUEDFMG General Contracting *10/17/2018
BISPLISSUEDPremier Flow Plumbing and Heating05/03/2018
BIS—ISSUEDD.B.J. Contracting12/04/2017
BISMHISSUEDKaback Enterprises05/18/2017
BISSPISSUEDFlow-Right Fire Supp04/21/2017
BISPLISSUEDZara Plumbing05/04/2016
BISMHISSUEDMetropolitan Builders of02/25/2016
BISOTISSUEDMetropolitan Builders of02/25/2016
BISMHISSUEDJorge Construction02/02/2016
BISOTISSUEDJorge Construction02/01/2016
BISSPISSUEDFlow-Right Fire Supp01/27/2016
BISPLISSUEDDV Plumbing01/22/2016
BISOTISSUEDMetropolitan Builders of01/21/2016
BISMHISSUEDMetropolitan Builders of01/21/2016
+ 25 more permits on file
8 projects · most recent 09/01/2026
General Wiring Lighting
FiledStatusContractorScope
09/01/2026Permit IssuedAccurate Electrical Contractors—
08/01/2026CompleteRichard Neu—
08/24/2023Permit IssuedKwong Ming Electric1 meters, 1 new_meters
03/16/2023Permit IssuedAL-Lectric Elect'l ContractingGeneral Wiring
08/24/2021CompleteNash Electric Services—
01/08/2020CompleteJer ElectricGeneral Wiring, Lighting
06/20/2019CompleteWilldan Electrical of NYGeneral Wiring
11/29/2018Permit IssuedQueue Electrical ContractorsGeneral Wiring
2 projects · most recent 08/01/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
08/01/2026Signed-offPark Contracting GroupSidewalk Shed
11/15/2021Permit IssuedFidelis Construction ManagementScaffold
1 project · most recent 07/03/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/03/2026Permit IssuedAzi ConstructionSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
08/26/2026Energy Code Compliance InspectionsJaeyoung Jangprogress
08/26/2026FinalJaeyoung Jangprogress
07/03/2026Post-installed AnchorsMd Rashidspecial
06/03/2026MasonryDavid Merabyanspecial
03/19/2026FinalDavid Merabyanprogress
03/19/2026Post-installed AnchorsDavid Merabyanspecial
03/19/2026Structural Stability – Alterations of existing buildingsDavid Merabyanspecial
10/28/2019Shutoff dampersAnthony Rini, IIIenergy_progress
10/28/2019Electrical motorsAnthony Rini, IIIenergy_progress
10/28/2019Mechanical SystemsAnthony Rini, IIIspecial
10/28/2019Maintenance informationAnthony Rini, IIIenergy_progress
10/28/2019HVAC and service water heating system controls Anthony Rini, IIIenergy_progress
10/28/2019FinalAnthony Rini, IIIprogress
10/28/2019Energy Code Compliance InspectionsAnthony Rini, IIIprogress
10/28/2019HVAC insulation and sealing Anthony Rini, IIIenergy_progress
10/28/2019Permanent certificateAnthony Rini, IIIenergy_progress
10/28/2019HVAC and service water heating equipment Anthony Rini, IIIenergy_progress
10/28/2019Duct leakage testing Anthony Rini, IIIenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Schwartz, Ponterio & LevensonOfficeFloor 10
Project M00253831 Alteration · LOC Issued · 11/13/2019
Project M00253859 Alteration · LOC Issued · 11/13/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 487 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch9
10/13/2026M01451892-I1Request digital key ↗
09/03/2026M00581552-I1Request digital key ↗
09/03/2026M00630569-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00253859-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00253831-I1Request digital key ↗
▸Applications & Permits99
▸BISPLAN / WORK APPROVAL APPLICATION48
05/06/2020123911348Open ↗
01/02/2020140876194Open ↗
11/22/2019140876194Open ↗
Showing 3 of 48 on file for this type
▸BISWORK PERMIT APPLICATION48
06/11/2020123911348Open ↗
01/22/2020140876194Open ↗
06/26/2019123767183Open ↗
Showing 3 of 48 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
06/11/2020123911348Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/21/2018123161327Open ↗
▸BISPLACE OF ASSEMBLY1
11/23/2018123418275Open ↗
▸Seals & Professional Certifications135
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION57
05/06/2020123911348Open ↗
06/28/2019123767183Open ↗
01/18/2019123655543Open ↗
Showing 3 of 57 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST23
05/06/2020123911348Open ↗
06/28/2019123767183Open ↗
01/14/2019123655543Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT18
05/06/2020123911348Open ↗
06/28/2019123767183Open ↗
01/14/2019123655543Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
10/14/2026M01451892-I1Open ↗
10/14/2026M01451892-I1Open ↗
08/31/2026M00253859-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
10/13/2026M01451892-I1Open ↗
09/03/2026M00581552-I1Open ↗
09/03/2026M00613402-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026M00253859-I1Open ↗
08/27/2026M01375150-I1Open ↗
08/24/2026M01419447-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/22/2019140876194Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment30
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
10/17/2018123543380Open ↗
04/30/2018123432062Open ↗
12/20/2016122648821Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
08/26/2020123767183Open ↗
08/25/2020123767183Open ↗
05/15/2017122622885Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS3
08/26/2020123767183Open ↗
08/25/2020123767183Open ↗
05/15/2017122622885Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSPRINKLER SYSTEMS1
01/07/2022123543380Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
10/17/2017123161327Open ↗
Showing 1 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/06/2020123911348Open ↗
▸Environmental & Asbestos38
▸BISASBESTOS: CERTIFICATION (DEP ACP5)22
05/06/2020123911348Open ↗
11/22/2019140876194Open ↗
06/28/2019123767183Open ↗
Showing 3 of 22 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
10/13/2026M01451892-I1Open ↗
09/03/2026M00613402-I1Open ↗
08/31/2026M00808183-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS23
05/06/2020123911348Open ↗
06/28/2019123767183Open ↗
01/18/2019123655543Open ↗
Showing 3 of 23 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
08/25/2020123767183Open ↗
06/07/2017123035134Open ↗
04/18/2017122622885Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
01/07/2022123543380Open ↗
08/25/2020123767183Open ↗
01/22/2020140876194Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/07/2022123543380Open ↗
08/04/2020140876194Open ↗
▸BISINTERIOR LIGHTING POWER2
01/07/2022123543380Open ↗
08/04/2020140876194Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
01/07/2022123543380Open ↗
08/04/2020140876194Open ↗
▸BIS* HVAC INSULATION AND SEALING1
01/07/2022123543380Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY5
01/07/2022123543380Open ↗
08/25/2020123767183Open ↗
01/22/2020140876194Open ↗
Showing 3 of 5 on file for this type
▸BISTR1 ACKNOWLEDGING RDP WILL BE RESPONSIBLE FOR FINAL INSPECTION (3A)1
08/04/2020140876194Open ↗
▸BISPOST-INSTALLED ANCHORS1
01/07/2022123543380Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
06/11/2020123911348Open ↗
▸BISTR1 CERTIFYING COMPLETION OF FINAL INSPECTION (3C)1
08/04/2020140876194Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/07/2022123543380Open ↗
▸BISTR1 IDENTIFYING RDP ASSUMING RESPONSIBILITY FOR FINAL ISPECTION (3B)1
08/04/2020140876194Open ↗
▸BISMECHANICAL SYSTEMS1
01/07/2022123543380Open ↗
▸Approvals, Objections & Sign-offs34
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
10/11/2022123543380Open ↗
08/25/2020123767183Open ↗
08/04/2020140876194Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUPERSEDING LETTER2
11/28/2018123543380Open ↗
11/28/2018123543380Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
10/11/2017123161327Open ↗
01/11/2017122648821Open ↗
▸BISFINAL1
01/07/2022123543380Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership44
▸BISCOST AFFIDAVIT42
08/25/2020123767183Open ↗
05/06/2020123911348Open ↗
11/22/2019140876194Open ↗
Showing 3 of 42 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
10/05/2022123543380Open ↗
08/04/2020140876194Open ↗
▸Filing & Intake Forms35
▸BISEFILING COVER SHEET23
05/06/2020123911348Open ↗
06/28/2019123767183Open ↗
01/14/2019123655543Open ↗
Showing 3 of 23 on file for this type
▸BISADDITIONAL INFORMATION6
01/17/2020140876194Open ↗
02/07/2017122622885Open ↗
01/11/2017122648821Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
05/06/2020123911348Open ↗
12/19/2018123543380Open ↗
11/21/2018123161327Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
11/22/2019140876194Open ↗
Showing 1 of 3 on file for this type
▸Other Documents4
▸BISMAINTENANCE INFORMATION1
01/07/2022123543380Open ↗
▸BISPLOT DIAGRAM1
10/11/2017123161327Open ↗
▸DOB NOWCalculations1
08/16/2026M01419447-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01419447-I1Open ↗