← Back
Elevator cooperative
134 WEST 82 STREET
MANHATTAN · BIN 1032032
💬 Discuss this project
1886Year Built
4Stories
D4Building Class
R8BZoning
10,568 sfGross Floor Area
20Units
Rent Stabilized8 Open Violations ▸
Elevator cooperative · Owner of record: 134 136 W 82ND ST OWNERS CORP · 3,882 sf lot · 2.72 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Roof2p · 2 filings · 11 docs
Cellar2p · 1 filing · 10 docs
Basement11p · 2 filings · 20 docs
Sub-Basement4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VERITAS PROPERTY MANAGEMENT1807/08/2026
134 136 W 82ND ST OWNERS CORP1203/22/2026
134-136 WEST 82ND ST OWNERS1303/22/2026
134/136 W 82ND OWNERS COR103/22/2026
WKR CONSTRUCTION203/22/2026
THE ANDREWS ORGANIZATION203/21/2026
134-136 W 82 OWN CORP C/O ANDREW203/21/2026
134-136 W 82 OWN CORP C O ANDREW203/21/2026
134 WEST 82ND ST OWNERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN GROUP IN H&K LLC706/14/2025
RIGID STRUCTURAL DESIGN, LLC310/22/2024
MVN ARCHITECT LLC206/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOMMA DESIGN CONSULTING1003/21/2026
DESIGN GROUP IN H K803/21/2026
Rigid Structural Design, LLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTERSYSTEMS INSTAL S&SGeneral Contractor507/08/2026
KH FOREST INCGeneral Contractor207/08/2026
LUKASZ TYKAElectrical103/21/2026
MATTHEW DETOREElectrical103/21/2026
ROBERT MARCHISOTTOElectrical103/21/2026
TROADIO MENENDEZElectrical103/21/2026
TYKA LUKASZElectrical103/21/2026
ALL CITY REMODELING, INCGeneral Contractor107/08/2026
WKR CONSTRUCTION, INCGeneral Contractor104/09/2026
DEO SINGHElectrical103/21/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
GLENDALE ELECTL CONTNG INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DESIGN GROUP IN H&K LLC1363706/14/2025
MUNICIPAL TESTING LABORAT230106/27/2024
INNOVATIVE ENGINEERING LA6593108/29/2023
Building Lifecycle
All (119)Filed (12)Permit Issued (8)Signed Off (7)Violation (60)Inspection (4)Objection (14)Special Inspection (14)
12/02/2025
Signed off — Alteration
Application filed for front and rear facades, and front entrance repairs as per drawings filed herewith.
M00995615-I1
10/06/2025
Signed off — Alteration
Application filed for interior apartment renovation unit 1BC as per drawings filed herewith.
M01082426-S2
10/06/2025
Signed off — Alteration
Application filed for interior apartment renovation unit 1BC as per drawings filed herewith.
M01082426-S1
09/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/08/2025
Violation issued (HPD, open)
B
07/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/29/2025
Signed off — Alteration
M01126789-I1
07/29/2025
Signed off — Alteration
M01126760-I1
07/29/2025
Signed off — Alteration
Installation of temporary material hoist as per plans submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01128108-I1
07/16/2025
Violation issued (ECB, closed)
Construction
07/16/2025
Violation issued (ECB, closed)
Unknown
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUKHWAN KIM
07/02/2025
Objection resolved — Addressed
07/02/2025
Objection resolved — Addressed
07/02/2025
Objection resolved — Addressed
06/30/2025
Objection raised — Plumbing
06/30/2025
Objection raised — Plumbing
06/30/2025
Objection raised — Scope
06/14/2025
Filed — Alteration
Application filed for interior apartment renovation unit 1BC as per drawings filed herewith.
M01082426-P4
06/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUKHWAN KIM
06/12/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/21/2025
Special inspection requirement — Mechanical Systems
SUKHWAN KIM
04/21/2025
Special inspection requirement — Final
SUKHWAN KIM
04/17/2025
Filed — Alteration
Application filed for interior apartment renovation unit 1BC as per drawings filed herewith.
M01082426-P1
04/17/2025
Filed — Alteration
Application filed for interior apartment renovation unit 1BC as per drawings filed herewith.
M01082426-P3
04/17/2025
Filed — Alteration
Application filed for interior apartment renovation unit 1BC as per drawings filed herewith.
M01082426-P2
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUKHWAN KIM
04/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUKHWAN KIM
04/15/2025
Special inspection requirement — Final
SUKHWAN KIM
04/15/2025
Special inspection requirement — Preliminary
SUKHWAN KIM
12/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/08/2024
Signed off — Alteration
Application filed for work in cellar, basement, OSP, facade to remediate water penetration issues; as per drawings filed herewith. no change to use, egress or occupancy as a part of this application.
M00921830-I1
10/31/2024
Permit issued — General Construction
M00995615-I1-GC
10/25/2024
Permit issued — Plumbing
M01082426-S2-PL
10/24/2024
Permit issued — Protection and Mechanical Methods
M01128108-I1-PMM
10/22/2024
Filed — Alteration
M01126789-I1
10/22/2024
Filed — Alteration
M01126760-I1
10/22/2024
Permit issued — Sidewalk Shed
M01126760-I1-SH
10/22/2024
Permit issued — Supported Scaffold
M01126789-I1-SF
10/21/2024
Filed — Alteration
Installation of temporary material hoist as per plans submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01128108-I1
10/15/2024
Permit issued — General Construction
M01082426-I1-GC
10/11/2024
Permit issued — Mechanical Systems
M01082426-S1-MS
09/24/2024
Filed — Alteration
Application filed for interior apartment renovation unit 1BC as per drawings filed herewith.
M01082426-S2
09/24/2024
Filed — Alteration
Application filed for interior apartment renovation unit 1BC as per drawings filed herewith.
M01082426-S1
09/19/2024
Objection resolved — Addressed
08/22/2024
Objection raised — Scope
08/12/2024
Objection resolved — Addressed
08/12/2024
Objection resolved — Addressed
08/08/2024
Objection raised — Scope
08/08/2024
Objection raised — Other
07/30/2024
Filed — Alteration
Application filed for interior apartment renovation unit 1BC as per drawings filed herewith.
M01082426-I1
06/27/2024
Filed — Alteration
Application filed for front and rear facades, and front entrance repairs as per drawings filed herewith.
M00995615-I1
04/24/2024
Violation issued (HPD, closed)
C
01/25/2024
Violation issued (HPD, closed)
C
10/19/2023
Permit issued — General Construction
M00921830-I1-GC
09/26/2023
Objection resolved — Addressed
08/30/2023
Objection raised — Scope
08/29/2023
Filed — Alteration
Application filed for work in cellar, basement, OSP, facade to remediate water penetration issues; as per drawings filed herewith. no change to use, egress or occupancy as a part of this application.
M00921830-I1
08/21/2023
Special inspection requirement — Fire-Resistance Rated Construction
AIMAN ELTOHAMY
08/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
AIMAN ELTOHAMY
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWKR CONSTRUCTION, INC10/31/2024
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC10/25/2024
DOB NOWProtection and Mechanical MethodsSigned-offINTERSYSTEMS INSTAL S&S10/24/2024
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S10/22/2024
DOB NOWSupported ScaffoldSigned-offINTERSYSTEMS INSTAL S&S10/22/2024
DOB NOWGeneral ConstructionPermit IssuedKH FOREST INC10/15/2024
DOB NOWMechanical SystemsSigned-offKH FOREST INC10/11/2024
DOB NOWGeneral ConstructionSigned-offALL CITY REMODELING, INC10/19/2023
BISPLISSUEDORBIT PLBG & HTG INC01/22/2019
BISOTISSUEDPOLER CONTRACTING INC03/23/2018
BISPLISSUEDCHAMP PLUMBING & HTG CORP06/16/2017
BISOTISSUEDPOLER CONTRACTING INC06/12/2017
BISOTISSUEDTOTAL STRUCTURAL CONCEPTS INC01/24/2013
BISOTISSUEDTOTAL STRUCTURAL CONCEPTS INC11/27/2012
BISEQISSUEDEVEREST SCAFFOLDING INC08/27/2012
BISEQISSUEDEVEREST SCAFFOLDING INC08/23/2012
BISOTISSUEDDEAN YODER INTERIORS LLC03/27/2012
BISOTISSUEDDEAN YODER INTERIORS LLC10/04/2010
BISOTISSUEDBRAS AL CONSTRUCTION07/10/2009
BISOTISSUEDDEAN YODER INTERIORS LLC02/20/2009
BISOTISSUEDBRASAL CONSTRUCTION07/15/2008
BISEQISSUEDROCKLEDGE SCAFFOLD CORP04/23/2008
BISOTISSUEDAMERICAN INDUSTRIES LLC08/09/2007
BISFBISSUEDCHAMPION COMBUSTION CORP11/06/2006
BISEQISSUEDROCKLEDGE SCAFFOLD CORP04/07/2004
BISPLISSUEDTMS PLMBG & HTG CORP03/15/2001
BISOTISSUEDGARY NEIHEISEL12/23/1998
BISBLISSUEDDUAL FUEL PLUMBING&HEATING CORP.05/13/1992
1 project · most recent 06/14/2025
Gas Water/Sanitary
FiledStatusContractorScope
06/14/2025Signed-offAMC PLBG, HTG & CLNG, INCGas, Water/Sanitary
8 projects · most recent 09/15/2026
General Wiring Boiler Controls Lighting
FiledStatusContractorScope
09/15/2026Permit IssuedGLENDALE ELECTL CONTNG INGeneral Wiring
07/29/2025CompleteASKO ELEC CONST & MAIN INGeneral Wiring
07/02/2025CompleteMULTI-TECH ELECTRIC, INC—
10/23/2024CompleteAURORA ELECL CONTG INC—
04/26/2022CompleteTIMOTHY COLEMAN LICENSEDGeneral Wiring
05/26/2021CompleteDEMAND ELECTRIC INCBoiler Controls
04/08/2019CompleteRESPONSE ELECTRIC INC.General Wiring
02/18/2019CompleteGLENDALE ELECTL CONTNG INGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/12/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
07/14/2025Fire-Resistant Penetrations and JointsSUKHWAN KIMspecial
06/13/2025Fire-Resistant Penetrations and JointsSUKHWAN KIMspecial
04/21/2025Mechanical SystemsSUKHWAN KIMspecial
04/21/2025FinalSUKHWAN KIMprogress
04/17/2025Fire-Resistant Penetrations and JointsSUKHWAN KIMspecial
04/15/2025Fire-Resistant Penetrations and JointsSUKHWAN KIMspecial
04/15/2025FinalSUKHWAN KIMprogress
04/15/2025PreliminarySUKHWAN KIMprogress
08/21/2023Fire-Resistance Rated ConstructionAIMAN ELTOHAMYprogress
08/18/2023Structural Stability – Alterations of existing buildingsAIMAN ELTOHAMYspecial
08/18/2023PreliminaryMichael Notaroprogress
08/18/2023FinalMichael Notaroprogress
08/18/2023Fire-Resistant Penetrations and JointsAIMAN ELTOHAMYspecial
08/18/2023MasonryAIMAN ELTOHAMYspecial
▾Documents — 219 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/29/2026M00921830-I1Request digital key ↗
08/27/2026M00995615-I1Request digital key ↗
08/26/2026M01128108-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits51
▸BISPLAN / WORK APPROVAL APPLICATION24
01/21/2020123167045Open ↗
12/19/2019123167045Open ↗
12/11/2019123167045Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION17
01/23/2019123167045Open ↗
11/27/2018123167045Open ↗
03/23/2018121287213Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWLPC Approval/Permit10
08/13/2026M00921830-I1Open ↗
08/13/2026M00995615-I1Open ↗
08/13/2026M01082426-P2Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications58
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
02/28/2020123167045Open ↗
02/28/2020123167045Open ↗
12/26/2019121287213Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/29/2026M00921830-I1Open ↗
08/27/2026M00995615-I1Open ↗
08/26/2026M01128108-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026M00921830-I1Open ↗
09/01/2026M00921830-I1Open ↗
09/01/2026M00921830-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
12/21/2017123167045Open ↗
05/19/2017121287213Open ↗
05/19/2017121287213Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
08/27/2012121357487Open ↗
08/24/2012121354881Open ↗
05/06/2008110159845Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M00921830-I1Open ↗
09/01/2026M00921830-I1Open ↗
09/01/2026M01082426-S1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/21/2017123167045Open ↗
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
01/21/2020123167045Open ↗
12/11/2019123167045Open ↗
11/07/2019121287213Open ↗
Showing 3 of 12 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
03/24/2011110156090Open ↗
03/17/2011110156090Open ↗
02/02/2011110156090Open ↗
▸BISSCHEDULE B - PLUMBING2
01/07/2010110156090Open ↗
05/02/2008110156090Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
12/21/2017123167045Open ↗
05/19/2017121287213Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/29/2026M00921830-I1Open ↗
08/27/2026M00995615-I1Open ↗
08/24/2026M01082426-P4Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
12/21/2017123167045Open ↗
05/19/2017121287213Open ↗
08/27/2012121357487Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
05/06/2008110159845Open ↗
04/23/2008110144040Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
07/09/2008110112903Open ↗
05/02/2008110156090Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
11/27/2012121348158Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
12/26/2019121287213Open ↗
12/26/2019121287213Open ↗
10/20/2015121348158Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
12/26/2019121287213Open ↗
10/20/2015121348158Open ↗
▸Approvals, Objections & Sign-offs21
▸BISADMINISTRATIVE OBJECTIONS7
08/27/2012121357487Open ↗
08/24/2012121354881Open ↗
08/21/2012121348158Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
02/28/2020123167045Open ↗
12/26/2019121287213Open ↗
10/20/2015121348158Open ↗
Showing 3 of 7 on file for this type
▸BISLANDMARKS APPROVAL6
02/28/2020123167045Open ↗
10/20/2015121348158Open ↗
08/21/2012121348158Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/13/2012110159845Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
02/28/2020123167045Open ↗
12/26/2019121287213Open ↗
12/21/2017123167045Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms22
▸BISEFILING COVER SHEET8
12/21/2017123167045Open ↗
05/19/2017121287213Open ↗
08/27/2012121357487Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM8
02/28/2020123167045Open ↗
12/26/2019121287213Open ↗
12/11/2019123167045Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION6
11/07/2019121287213Open ↗
04/01/2019123167045Open ↗
01/04/2018121287213Open ↗
Showing 3 of 6 on file for this type
▸Other Documents5
▸DOB NOWProof of Historic Building4
08/13/2026M00995615-I1Open ↗
08/13/2026M00921830-I1Open ↗
08/13/2026M01082426-P1Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/31/2012110144040Open ↗