← Back
Public elementary, junior or senior high
1340 SHERIDAN AVENUE
BRONX · Mount Eden-Claremont (West) · BIN 2094533
💬 Discuss this project
1925Year Built
4Stories
W1Building Class
R7-1Zoning
22,400 sfGross Floor Area
1Units
11 Open Violations 1 unresolved · 10 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 9,398 sf lot · 2.38 FAR built · Flood zone X
Locations of Work
Mechanical
Floor 12p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEPT OF EDUCATION P.S. 8403/22/2026
DEPT OF EDUCATION P.S.88603/22/2026
DOE 040203/22/2026
P.S.88 D.O.E. 0603/22/2026
DOE P.S. 88503/22/2026
DOE X 088 040103/22/2026
D.O.E. P.S.88 0103/22/2026
DEPARTMENT OF EDUCATION303/22/2026
DEPT. OF EDUCATION 0103/22/2026
PS 88.DOE403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EME GROUP/SALAS O'BRIEN109/12/2024
NYMS CONSULTING, LLC704/10/2024
ABC ENGINEERING PLLC209/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ABC ENGINEERING PLLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NORTH STAR MECHANICAL CORGeneral Contractor2007/08/2026
BRIAN CHEBUSKEElectrical303/21/2026
DOME ELECT & COMM CONT INElectrical203/22/2026
S & W WILSON ENTERPRISESGeneral Contractor203/21/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
FRANCIS RICHARDSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317504/10/2024
ABC ENGINEERING PLLC1515109/27/2022
Building Lifecycle
All (116)Filed (10)Permit Issued (14)Signed Off (1)Violation (60)Inspection (1)Objection (2)Special Inspection (28)
04/09/2026
Violation issued (ECB, open)
Construction
04/09/2026
Violation issued (ECB, open)
Construction
04/09/2026
Violation issued (ECB, open)
Construction
04/09/2026
Violation issued (ECB, open)
Construction
07/05/2025
Violation issued (ECB, open)
Construction
07/05/2025
Violation issued (ECB, open)
Construction
07/05/2025
Violation issued (ECB, open)
Construction
12/27/2024
Permit issued — Construction Fence
X00794213-I1-FN
09/12/2024
Filed — Alteration
X01109246-I1
09/12/2024
Special inspection requirement — Maintenance information
09/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
09/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
09/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
09/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/11/2024
Special inspection requirement — Post-installed Anchors
09/10/2024
Special inspection requirement — Final
09/10/2024
Special inspection requirement — Mechanical Systems
08/23/2024
Permit issued — Construction Fence
X00794213-I1-SH
07/26/2024
Violation issued (ECB, open)
Construction
07/26/2024
Violation issued (ECB, open)
Construction
07/26/2024
Violation issued (ECB, open)
Construction
05/29/2024
Permit issued — Mechanical Systems
X00794213-S2-MS
05/29/2024
Permit issued — Supported Scaffold
X00794213-S3-SF
04/10/2024
Filed — Alteration
PS 088X, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE, AND MAKE-UP WATER PIPING TO CONNECT TEMPORARY MOBILE BOILER DURING RENOVATION OF MAIN BUILDING HEATING PLANT IN CONJUNCTION WITH DOB # 201207942. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00794213-P3
04/10/2024
Special inspection requirement — Mechanical Systems
MIKHAIL ZEYGMAN
04/10/2024
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
04/10/2024
Special inspection requirement — Chimneys and vents
MIKHAIL ZEYGMAN
04/10/2024
Special inspection requirement — Final
MIKHAIL ZEYGMAN
04/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MIKHAIL ZEYGMAN
04/09/2024
Filed — Alteration
PS 088X, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE, AND MAKE-UP WATER PIPING TO CONNECT TEMPORARY MOBILE BOILER DURING RENOVATION OF MAIN BUILDING HEATING PLANT IN CONJUNCTION WITH DOB # 201207942. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00794213-P1
09/11/2023
Permit issued — Sidewalk Shed
X00794213-I1-SH
07/28/2023
Permit issued — Mechanical Systems
X00794213-S2-MS
07/20/2023
Permit issued — Supported Scaffold
X00794213-S3-SF
07/20/2023
Permit issued — Sidewalk Shed
X00794213-I1-FN
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/03/2023
Signed off — Alteration
FILE MECHANICAL WORK TO INSTALL HVAC UNITS AT SUB-CELLAR FOR PUBLIC SCHOOL X088. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00727410-I1
03/27/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/03/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
MIKHAIL ZEYGMAN
03/02/2023
Filed — Alteration
PS 088X, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE, AND MAKE-UP WATER PIPING TO CONNECT TEMPORARY MOBILE BOILER DURING RENOVATION OF MAIN BUILDING HEATING PLANT IN CONJUNCTION WITH DOB # 201207942. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00794213-P2
02/27/2023
Special inspection requirement — Chimneys and vents
MIKHAIL ZEYGMAN
02/27/2023
Special inspection requirement — Mechanical Systems
MIKHAIL ZEYGMAN
02/27/2023
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
02/27/2023
Special inspection requirement — Final
MIKHAIL ZEYGMAN
02/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MIKHAIL ZEYGMAN
02/27/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
MIKHAIL ZEYGMAN
10/31/2022
Permit issued — Boiler Equipment
X00794213-S1-BE
10/17/2022
Permit issued — Supported Scaffold
X00794213-S3-SF
10/12/2022
Filed — Alteration
PS 088X, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE, AND MAKE-UP WATER PIPING TO CONNECT TEMPORARY MOBILE BOILER DURING RENOVATION OF MAIN BUILDING HEATING PLANT IN CONJUNCTION WITH DOB # 201207942. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00794213-S3
10/11/2022
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
10/01/2022
Permit issued — Mechanical Systems
X00727410-I1-MS
09/30/2022
Permit issued — Mechanical Systems
X00794213-S2-MS
09/27/2022
Filed — Alteration
FILE MECHANICAL WORK TO INSTALL HVAC UNITS AT SUB-CELLAR FOR PUBLIC SCHOOL X088. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00727410-I1
09/07/2022
Objection raised — Other
09/07/2022
Objection resolved — Addressed
09/06/2022
Filed — Alteration
PS 088X, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE, AND MAKE-UP WATER PIPING TO CONNECT TEMPORARY MOBILE BOILER DURING RENOVATION OF MAIN BUILDING HEATING PLANT IN CONJUNCTION WITH DOB # 201207942. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00794213-S2
08/22/2022
Permit issued — Construction Fence
X00794213-I1-SH
08/18/2022
Permit issued — Sidewalk Shed
X00794213-I1-FN
08/17/2022
Filed — Alteration
PS 088X, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE, AND MAKE-UP WATER PIPING TO CONNECT TEMPORARY MOBILE BOILER DURING RENOVATION OF MAIN BUILDING HEATING PLANT IN CONJUNCTION WITH DOB # 201207942. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00794213-I1
08/17/2022
Filed — Alteration
PS 088X, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE, AND MAKE-UP WATER PIPING TO CONNECT TEMPORARY MOBILE BOILER DURING RENOVATION OF MAIN BUILDING HEATING PLANT IN CONJUNCTION WITH DOB # 201207942. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00794213-S1
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedNORTH STAR MECHANICAL COR12/27/2024
DOB NOWConstruction FencePermit IssuedNORTH STAR MECHANICAL COR08/23/2024
DOB NOWMechanical SystemsPermit IssuedNORTH STAR MECHANICAL COR05/29/2024
DOB NOWSupported ScaffoldPermit IssuedNORTH STAR MECHANICAL COR05/29/2024
DOB NOWSidewalk ShedPermit IssuedNORTH STAR MECHANICAL COR09/11/2023
DOB NOWMechanical SystemsPermit IssuedNORTH STAR MECHANICAL COR07/28/2023
DOB NOWSupported ScaffoldPermit IssuedNORTH STAR MECHANICAL COR07/20/2023
DOB NOWSidewalk ShedPermit IssuedNORTH STAR MECHANICAL COR07/20/2023
DOB NOWBoiler EquipmentSigned-offPETRO INC10/31/2022
DOB NOWSupported ScaffoldPermit IssuedNORTH STAR MECHANICAL COR10/17/2022
DOB NOWMechanical SystemsSigned-offS & W WILSON ENTERPRISES10/01/2022
DOB NOWMechanical SystemsPermit IssuedNORTH STAR MECHANICAL COR09/30/2022
DOB NOWConstruction FencePermit IssuedNORTH STAR MECHANICAL COR08/22/2022
DOB NOWSidewalk ShedPermit IssuedNORTH STAR MECHANICAL COR08/18/2022
BISOTISSUEDNORTH STAR MECHANICAL COR01/21/2026
BISPLISSUEDV. C. VITANZA SONS INC10/23/2025
BISPLISSUEDV. C. VITANZA SONS INC11/14/2024
BISOTISSUEDNORTH STAR MECHANICAL COR06/11/2024
BISOTISSUEDNORTH STAR MECHANICAL COR06/11/2024
BISMHISSUEDNORTH STAR MECHANICAL COR06/11/2024
BISFBISSUEDSTUART N SCHWARTZ06/07/2024
BISPLISSUEDV. C. VITANZA SONS INC12/04/2023
BISOTISSUEDNORTH STAR MECHANICAL COR05/25/2023
BISOTISSUEDNORTH STAR MECHANICAL COR05/25/2023
BISMHISSUEDNORTH STAR MECHANICAL COR05/25/2023
BISFBISSUEDSTUART N SCHWARTZ05/09/2023
BISPLISSUEDV. C. VITANZA SONS INC12/16/2022
BISPLISSUEDV. C. VITANZA SONS INC12/15/2022
BISBLISSUEDSTUART N SCHWARTZ12/15/2022
BISOTISSUEDNORTH STAR MECHANICAL COR12/15/2022
BISOTISSUEDNORTH STAR MECHANICAL COR12/15/2022
BISPLISSUEDVARSITY PLBG AND HTG INC05/24/2010
BISEQISSUEDM.S.T GENERAL CONTRACTING04/05/2010
BISPLISSUEDVARSITY PLBG AND HTG INC04/17/2009
BISOTISSUEDKNC ELECTRIC INC.04/21/2008
BISPLISSUEDVARSITY PLBG AND HTG INC04/16/2008
BISMHISSUEDTRYALL INC04/16/2008
BISEQISSUEDKNC ELECTRIC INCORPORATED04/15/2008
BISOTISSUEDS & L INDUSTRIES INC04/14/2006
BISPLISSUEDEAGLE 1 MECHANICAL, INC02/28/2002
+ 1 more permits on file
12 projects · most recent 06/25/2026
General Wiring Lighting
FiledStatusContractorScope
06/25/2026Permit IssuedLERCO ELECTRIC LLCGeneral Wiring
11/10/2025CompleteDOME ELECT & COMM CONT INGeneral Wiring
10/02/2025CompleteSUNRISE ELEC'L SERVICESGeneral Wiring
03/28/2024CompleteANCO ELECTL CONTCTNG INC—
01/16/2023Permit IssuedSUMMIT ELECTRIC CORP—
01/16/2023Permit IssuedDOME ELECT & COMM CONT IN—
07/18/2022Permit IssuedDOME ELECT & COMM CONT INGeneral Wiring
09/14/2021CompleteMNBC ELECTRICAL CORPGeneral Wiring
06/29/2021CompleteKLK ELECTRIC, INCLighting
04/26/2021CompleteKLK ELECTRIC, INCGeneral Wiring
02/06/2020CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
02/05/2020CompleteCHARAN ELEC'L ENTERP'S IN—
1 project · most recent 04/10/2024
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
04/10/2024Permit IssuedNORTH STAR MECHANICAL CORFence, Scaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/27/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
09/12/2024Maintenance information—energy_progress
09/12/2024HVAC-R and service water heating equipment—energy_progress
09/12/2024HVAC-R and service water heating system controls—energy_progress
09/12/2024HVAC-R and service water piping design and insulation—energy_progress
09/11/2024Fire-Resistant Penetrations and Joints—special
09/11/2024Post-installed Anchors—special
09/10/2024Final—progress
09/10/2024Mechanical Systems—special
04/10/2024Mechanical SystemsMIKHAIL ZEYGMANspecial
04/10/2024Post-installed AnchorsMIKHAIL ZEYGMANspecial
04/10/2024Chimneys and ventsMIKHAIL ZEYGMANspecial
04/10/2024FinalMIKHAIL ZEYGMANprogress
04/10/2024HVAC-R and service water piping design and insulationMIKHAIL ZEYGMANenergy_progress
03/03/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsMIKHAIL ZEYGMANspecial
02/27/2023Chimneys and ventsMIKHAIL ZEYGMANspecial
02/27/2023Mechanical SystemsMIKHAIL ZEYGMANspecial
02/27/2023Post-installed AnchorsMIKHAIL ZEYGMANspecial
02/27/2023FinalMIKHAIL ZEYGMANprogress
02/27/2023HVAC-R and service water piping design and insulationMIKHAIL ZEYGMANenergy_progress
02/27/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsMIKHAIL ZEYGMANspecial
10/11/2022Post-installed AnchorsMIKHAIL ZEYGMANspecial
04/28/2022Mechanical SystemsHUI ZENGspecial
04/28/2022Fire-Resistant Penetrations and JointsHUI ZENGspecial
04/28/2022FinalHUI ZENGprogress
04/28/2022HVAC-R and service water piping design and insulationHUI ZENGenergy_progress
Latest 25 of 28.
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/24/2026X00514005-I1Request digital key ↗
08/24/2026X00727410-I1Request digital key ↗
08/21/2026X00794213-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits8
▸BISWORK PERMIT APPLICATION7
06/11/2024201207942Open ↗
06/11/2024201207942Open ↗
06/11/2024201207942Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
04/05/2010220054848Open ↗
▸Seals & Professional Certifications32
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026X00794213-S1Open ↗
09/01/2026X00727410-I1Open ↗
09/01/2026X00727410-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/24/2026X00514005-I1Open ↗
08/24/2026X00727410-I1Open ↗
08/21/2026X00794213-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026X00727410-I1Open ↗
09/01/2026X00727410-I1Open ↗
09/01/2026X00727410-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/05/2010220054848Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/05/2010220054848Open ↗
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026X00794213-I1Open ↗
08/13/2026X00794213-S3Open ↗
08/13/2026X00794213-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026X00514005-I1Open ↗
08/24/2026X00727410-I1Open ↗
08/21/2026X00794213-P3Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/05/2010220054848Open ↗
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/24/2026X00514005-I1Open ↗
08/13/2026X00727410-I1Open ↗
08/13/2026X00794213-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)8
08/13/2026X00794213-S3Open ↗
08/13/2026X00794213-S1Open ↗
08/13/2026X01109246-I1Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
04/05/2010220054848Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/05/2010220054848Open ↗
▸Other Documents9
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal8
08/13/2026X00794213-S2Open ↗
08/13/2026X00794213-I1Open ↗
08/13/2026X00794213-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWNYCSCA Exhibit 21
08/13/2026X01109246-I1Open ↗