← Back
BuildNYC
Two family brick
1341 FTELEY AVENUE
BRONX · BIN 2027607
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R6Zoning
2,296 sfGross Floor Area
2Units
Rent Stabilized1 Active Violation ▸
Two family brick · Owner of record: 1321 Mazel Adar · 2,442 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof4p · 1 filing · 20 docs
Floor 237p · 1 filing · 20 docs
Floor 139p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
Basement40p · 1 filing · 20 docs
Site & exterior10p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/29/2024$880K—Private party → 1321 MAZEL ADAR LLC$383/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Adb Associates701/22/2025
Vasilios Artemiou PE103/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC Design File803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mabe GroupGeneral Contractor204/09/2026
S&R Electrical & MechanicalsElectrical103/22/2026
A. M. Plumbing CompanyPlumbing107/08/2026
Prime Piping & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616801/22/2025
Building Lifecycle
02/02/2026
§ 26-1103 admin. Code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys…
HPD violation · closed
02/02/2026
§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that…
HPD violation · closed
02/02/2026
§ 27-2033 ADM code post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key…
HPD violation · closed
02/02/2026
§ 27-2104 ADM code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the…
HPD violation · closed
02/02/2026
§ 329, m/d law and dept. Rules and regs. Provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge…
HPD violation · closed
85 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offAmb Mechanical05/20/2024
DOB NOWMechanical SystemsSigned-offAB Builders NY05/01/2024
DOB NOWPlumbingSigned-offA. M. Plumbing Company04/11/2024
DOB NOWGeneral ConstructionPermit IssuedAB Builders NY03/19/2024
1 project · most recent 01/22/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
01/22/2025Signed-offMabe GroupHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 01/22/2025
Water/Sanitary
FiledStatusContractorScope
01/22/2025Signed-offA. M. Plumbing CompanyWater/Sanitary
3 projects · most recent 03/04/2025
General Wiring
FiledStatusContractorScope
03/04/2025CompleteS&R Electrical & Mechanicals—
09/13/2024CompleteS&R Electrical & MechanicalsGeneral Wiring
03/25/2024CompleteS&R Electrical & Mechanicals—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
11/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/02/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/09/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/16/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
01/24/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/24/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
01/24/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/24/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
01/21/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/21/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
01/21/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/21/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
01/21/2025Interior lighting powerFAHAD FATEHenergy_progress
01/21/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
01/21/2025Fenestration air leakageFAHAD FATEHenergy_progress
01/21/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
01/21/2025Fenestration areasFAHAD FATEHenergy_progress
01/21/2025MeteringFAHAD FATEHenergy_progress
01/21/2025Exterior lighting powerFAHAD FATEHenergy_progress
01/21/2025Lighting controlsFAHAD FATEHenergy_progress
01/21/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
01/21/2025Permanent certificateFAHAD FATEHenergy_progress
01/21/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
12/17/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/17/2024Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
12/17/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
12/17/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/17/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
12/17/2024MeteringFAHAD FATEHenergy_progress
Latest 25 of 48.
52 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account