← Back
Three families
1343 HARROD AVENUE
BRONX · Soundview-Bruckner-Bronx River · BIN 2027556
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R6Zoning
3,660 sfGross Floor Area
3Units
Rent Stabilized7 Open Violations ▸
Three families · Owner of record: 1343 H LLC · 2,500 sf lot · 1.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof10p · 1 filing · 20 docs
Floor 252p · 1 filing · 20 docs
Floor 151p · 1 filing · 20 docs
Basement55p · 1 filing · 20 docs
Site & exterior4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
711 E2807/08/2026
1343 H LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/15/2024$1.0M—— → —$277/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIKOLAI KATZ ARCHITECT601/27/2025
VASILIOS ARTEMIOU PE509/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJH CONSTRUCTION CORPGeneral Contractor307/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161101/27/2025
Building Lifecycle
All (99)Filed (11)Permit Issued (5)Signed Off (3)Violation (27)Inspection (7)Objection (16)Special Inspection (30)
06/07/2026
Violation issued (HPD, open)
A
06/07/2026
Violation issued (HPD, open)
B
06/07/2026
Violation issued (HPD, open)
A
06/07/2026
Violation issued (HPD, open)
A
06/07/2026
Violation issued (HPD, open)
C
08/12/2025
Violation issued (HPD, closed)
B
06/05/2025
Violation issued (HPD, closed)
A
05/18/2025
Violation issued (HPD, closed)
C
05/18/2025
Violation issued (HPD, closed)
C
05/18/2025
Violation issued (HPD, closed)
C
04/08/2025
Violation issued (HPD, closed)
C
04/08/2025
Violation issued (HPD, open)
C
04/04/2025
Violation issued (HPD, closed)
C
04/04/2025
Violation issued (HPD, closed)
A
02/02/2025
Violation issued (HPD, closed)
A
02/02/2025
Violation issued (HPD, closed)
B
01/27/2025
Filed — Alteration CO
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #X01001555-I1.
X01001555-P8
11/25/2024
Violation issued (HPD, closed)
I
10/16/2024
Filed — Alteration CO
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #X01001555-I1.
X01001555-P7
09/18/2024
Signed off — Alteration CO
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #X01001555-I1.
X01001555-S1
09/18/2024
Signed off — Alteration CO
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #X01001555-I1.
X01001555-S3
09/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
09/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
09/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/17/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
09/17/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
09/17/2024
Special inspection requirement — Final
FAHAD FATEH
09/17/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
09/17/2024
Special inspection requirement — Permanent certificate
FAHAD FATEH
09/17/2024
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
09/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
09/17/2024
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
09/17/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
09/13/2024
Filed — Alteration CO
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #X01001555-I1.
X01001555-P6
09/12/2024
Signed off — Alteration CO
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #X01001555-I1.
X01001555-S4
09/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/09/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
09/09/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
09/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/09/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/09/2024
Special inspection requirement — Final
FAHAD FATEH
09/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
09/09/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
09/09/2024
Special inspection requirement — Permanent certificate
FAHAD FATEH
09/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
09/09/2024
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
09/09/2024
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
09/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
08/19/2024
Objection resolved — Addressed
08/15/2024
Objection raised — Scope
08/13/2024
Filed — Alteration CO
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #X01001555-I1.
X01001555-P5
08/12/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
08/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
08/12/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/05/2024
Filed — Alteration CO
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #X01001555-I1.
X01001555-P4
07/30/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMJH CONSTRUCTION CORP06/11/2024
DOB NOWMechanical SystemsSigned-offMJH CONSTRUCTION CORP05/30/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC05/28/2024
DOB NOWPlumbingSigned-offYG SERVICES INC05/23/2024
DOB NOWGeneral ConstructionPermit IssuedMJH CONSTRUCTION CORP05/17/2024
1 project · most recent 01/27/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/27/2025Permit IssuedMJH CONSTRUCTION CORPHeating and Air Conditioning Systems
Heat / Cool
Daikin 4MXS36WMVJU9 36,000 BTU · Condensing Unit ×3
2MXS18WMVJU9 18,500 BTU · Condensing Unit ×2
RXF18AXVJU 18,300 BTU · Condensing Unit ×2
3MXS24WMVJU9 24,000 BTU · Condensing Unit ×1
5MXS48WVJU9 48,500 BTU · Condensing Unit ×1
RXF12AXVJU 13,500 BTU · Condensing Unit ×1
1 project · most recent 01/27/2025
Sprinkler System
FiledStatusContractorScope
01/27/2025Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 01/27/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/27/2025Signed-offYG SERVICES INCGas, Storm, Water/Sanitary
1 project · most recent 05/21/2024
General Wiring
FiledStatusContractorScope
05/21/2024CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/30/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/02/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/24/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
09/17/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
09/17/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
09/17/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/17/2024Mechanical SystemsFAHAD FATEHspecial
09/17/2024Post-installed AnchorsFAHAD FATEHspecial
09/17/2024FinalFAHAD FATEHprogress
09/17/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
09/17/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
09/17/2024Permanent certificateFAHAD FATEHenergy_progress
09/17/2024Ventilation and air distribution systemFAHAD FATEHenergy_progress
09/17/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
09/17/2024Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
09/17/2024Maintenance informationFAHAD FATEHenergy_progress
09/09/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/09/2024Mechanical SystemsFAHAD FATEHspecial
09/09/2024Post-installed AnchorsFAHAD FATEHspecial
09/09/2024Structural Stability – Alterations of existing buildings—special
09/09/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
09/09/2024FinalFAHAD FATEHprogress
09/09/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
09/09/2024Maintenance informationFAHAD FATEHenergy_progress
09/09/2024Permanent certificateFAHAD FATEHenergy_progress
09/09/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
09/09/2024Ventilation and air distribution systemFAHAD FATEHenergy_progress
09/09/2024Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
Latest 25 of 60.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/20/2026X01001555-P4Request digital key ↗
08/20/2026X01001555-P3Request digital key ↗
08/20/2026X01001555-P2Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X01001555-I1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/20/2026X01001555-P3Open ↗
08/20/2026X01001555-P2Open ↗
08/20/2026X01001555-S4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/14/2026X01001555-S1Open ↗
09/14/2026X01001555-S1Open ↗
09/02/2026X01001555-P4Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/14/2026X01001555-S1Open ↗
09/14/2026X01001555-S1Open ↗
09/02/2026X01001555-P4Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist6
08/13/2026X01001555-P3Open ↗
08/13/2026X01001555-P7Open ↗
08/13/2026X01001555-P2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/20/2026X01001555-P3Open ↗
08/20/2026X01001555-P2Open ↗
08/20/2026X01001555-S4Open ↗
Showing 3 of 11 on file for this type
▸Other Documents7
▸DOB NOWProperty Ownership Certification6
08/20/2026X01001555-P3Open ↗
08/20/2026X01001555-P2Open ↗
08/20/2026X01001555-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFinal Survey1
08/13/2026X01001555-I1Open ↗