← Back
BuildNYC
Three families
1343 HARROD AVENUE
BRONX · BIN 2027556
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R6Zoning
3,660 sfGross Floor Area
3Units
Rent Stabilized6 Active Violations ▸
Three families · Owner of record: 1343 H LLC · 2,500 sf lot · 1.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMetcalfPark project10p · 1 filing · 20 docs
Floor 2Unit 2A, Unit 2B, Unit 2C +151p · 1 filing · 20 docs
Floor 1Unit 1, Unit 1A, Unit 1B +250p · 1 filing · 20 docs
BasementMetcalfPark project54p · 1 filing · 20 docs
Site & exteriorMetcalfPark project4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
7-11 Associates2807/08/2026
1343 H LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/15/2024$1.0M—Private party → 1343 H LLC$277/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nikolai Katz Architect601/27/2025
Vasilios Artemiou PE509/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Express Filing2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJH ConstructionGeneral Contractor207/08/2026
MJH Constructionspecialty_contractor104/09/2026
Mpi PlumbingPlumbing107/08/2026
Prime Piping & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161101/27/2025
Building Lifecycle
06/07/2026
§ 27-2053 ADM code post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of…
HPD violation · open
06/07/2026
§ 27-2104 ADM code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the…
HPD violation · open
06/07/2026
§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that…
HPD violation · open
06/07/2026
§ 27-2033 ADM code post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key…
HPD violation · open
08/12/2025
§ 27-2010, 2011, 2012 ADM code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the the floor at front areaway
HPD violation · closed
96 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMJH Construction06/11/2024
DOB NOWMechanical SystemsSigned-offMJH Construction05/30/2024
DOB NOWSprinklersSigned-offAmb Mechanical05/28/2024
DOB NOWPlumbingSigned-offYG Services05/23/2024
DOB NOWGeneral ConstructionPermit IssuedMJH Construction05/17/2024
1 project · most recent 01/27/2025
Heating and Air Conditioning Systems
FiledStatusContractorScope
01/27/2025Permit IssuedMJH ConstructionHeating and Air Conditioning Systems
1 project · most recent 01/27/2025
Sprinkler System
FiledStatusContractorScope
01/27/2025Signed-offPrime Piping & HeatingSprinkler System
1 project · most recent 01/27/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/27/2025Signed-offYG ServicesGas, Storm, Water/Sanitary
1 project · most recent 05/21/2024
General Wiring
FiledStatusContractorScope
05/21/2024CompleteS&R ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/30/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/02/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/24/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
01/22/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/22/2025Fenestration areasFAHAD FATEHenergy_progress
01/22/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
01/22/2025Maintenance informationFAHAD FATEHenergy_progress
01/22/2025MeteringFAHAD FATEHenergy_progress
01/22/2025Permanent certificateFAHAD FATEHenergy_progress
01/22/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
01/22/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
01/22/2025Fenestration air leakageFAHAD FATEHenergy_progress
01/22/2025Interior lighting powerFAHAD FATEHenergy_progress
01/22/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/22/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
01/22/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
09/17/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
09/17/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
09/17/2024Maintenance informationFAHAD FATEHenergy_progress
09/17/2024Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
09/17/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
09/17/2024Ventilation and air distribution systemFAHAD FATEHenergy_progress
09/17/2024Permanent certificateFAHAD FATEHenergy_progress
09/17/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
09/17/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
09/17/2024FinalFAHAD FATEHprogress
09/17/2024Post-installed AnchorsFAHAD FATEHspecial
09/17/2024Mechanical SystemsFAHAD FATEHspecial
Latest 25 of 78.
71 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account