← Back
One story - permanent living quarter
1344 83 STREET
BROOKLYN · BIN 3164345
💬 Discuss this project
1965Year Built
1Stories
A2Building Class
R4-1Zoning
1,384 sfGross Floor Area
1Units
One story - permanent living quarter · 6,200 sf lot · 0.22 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC206/14/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.B.I. CONSTRUCTION GROUPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116206/14/2024
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
06/18/2024
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B00996336-I1
06/14/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B00996336-P1
06/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
06/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
06/07/2024
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
06/07/2024
Special inspection requirement — Final
VYACHESLAV NECHAYEV
06/07/2024
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
02/16/2024
Permit issued — Solar
B00996336-I1-SL
02/05/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B00996336-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. CONSTRUCTION GROUP02/16/2024
1 project · most recent 01/31/2024
FiledStatusContractorScope
01/31/2024CompleteJSP ELECTL CNTNG CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/07/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
06/07/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
06/07/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
06/07/2024FinalVYACHESLAV NECHAYEVprogress
06/07/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026B00996336-I1Request digital key ↗
08/26/2026B00996336-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026B00996336-I1Open ↗
08/13/2026B00996336-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B00996336-P1Open ↗
08/24/2026B00996336-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B00996336-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026B00996336-I1Open ↗
08/13/2026B00996336-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B00996336-I1Open ↗