The Victoria and Lloyd Goldman Health Care Pavilion
1345 3RD AVENUE · BIN 1091945
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Active Violations
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsCross Country ConstructionUnder Construction6 filings
RoofRoof Scaffold Stair Tower3p · 5 filings
Floor 17Wall facade curb work1 filing · 2 docs
Floor 16Wall facade curb work1 filing
Floor 15Wall facade curb work1 filing
Floor 14Wall facade curb work1 filing
Floor 13Wall facade curb work1 filing
Floor 12Wall facade curb work1p · 2 filings
Floor 11
Floor 10
Floor 9Temporary monorail system for new building construction1 filing
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4DOKA STAXO temporary stair tower installation1 filing
Floor 3DOKA STAXO temporary stair tower installation1 filing
Floor 2Temporary loading platform1p · 2 filings
Floor 1Blue Sky 3rd Avenue Management LLC6 filings
CellarNew Cellar Hoist Installation1p · 1 filing
Site & exteriorNorthwell HealthUnder Construction9 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Northwell Health Lenox Hill Hospita2110/15/2026
Lend Lease US Construction LMB308/06/2026
3rd Avenue Blockfront208/04/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Safway AtlanticScaffold2109/22/2026
Sirina Fire ProtectionFire Protection907/02/2026
Parkview P&HPlumbing507/02/2026
Consigli Construction CoGeneral Contractor510/07/2026
Alliance PlumbingPlumbing407/02/2026
Cross Country ConstructionScaffold307/02/2026
Exterior Wall & BuildingScaffold207/02/2026
Lendlease (US) ConstructionGeneral Contractor207/02/2026
Urban IntelligenceScaffold108/06/2026
Consigli Construction CoScaffold108/04/2026
Lendlease (US) ConstructionScaffold107/02/2026
Arsenal ScaffoldScaffold107/02/2026
W & W GlassScaffold107/02/2026
Accurate MechanicalPlumbing107/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Future Tech Consultants O5893210/14/2026
Severud Associates2224207/21/2026
Socotec Engineering4983507/21/2026
Skyline Rigging7880204/02/2026
Mueser Rutledge Consulting977303/10/2026
G. Blinn Consulting28941207/29/2025
Building Lifecycle
All (300)Filed (80)Permit Issued (80)Signed Off (12)Violation (7)Inspection (14)Objection (77)Special Inspection (30)
10/14/2026
Filed — New Building
Installation of 19'-0' curb-cut [14' cut + (2) 2.5' splays] on the north side of East 76 Street, 50' east of the Third Avenue street line, in conjunction with New Building M08013299-I1.
M08013299-C6
10/06/2026
Signed off — New Building
Installation of 19'-0' curb-cut [14' cut + (2) 2.5' splays] on the north side of East 76 Street, 50' east of the Third Avenue street line, in conjunction with New Building M08013299-I1.
M08013299-Z5
10/06/2026
Permit issued — Curb Cut
M08013299-S8-CC
10/05/2026
Objection resolved — Resolved
10/02/2026
Objection raised — Other
10/02/2026
Objection raised — Other
10/02/2026
Objection resolved — Resolved
09/28/2026
Signed off — Alteration
M00984349-I1
09/25/2026
Special inspection requirement — Maintenance information
MARISA HARTE
09/25/2026
Special inspection requirement — Heating Systems
MARISA HARTE
09/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
MARISA HARTE
09/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MARISA HARTE
09/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
MARISA HARTE
09/21/2026
Permit issued — Sidewalk Shed
M01033663-I1-SH
09/16/2026
Permit issued — Construction Fence
M00980935-I1-FN
09/15/2026
Filed — New Building
Installation of 19'-0' curb-cut [14' cut + (2) 2.5' splays] on the north side of East 76 Street, 50' east of the Third Avenue street line, in conjunction with New Building M08013299-I1.
M08013299-C5
09/14/2026
Signed off — New Building
Installation of 19'-0' curb-cut [14' cut + (2) 2.5' splays] on the north side of East 76 Street, 50' east of the Third Avenue street line, in conjunction with New Building M08013299-I1.
M08013299-Z1
09/14/2026
Inspection — Under Review Boiler Equipment Inspection
Under Review
View inspection ↗
09/11/2026
Special inspection requirement — Post-installed Anchors
MARISA HARTE
09/11/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MARISA HARTE
09/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
09/08/2026
Filed — New Building
Installation of 19'-0' curb-cut [14' cut + (2) 2.5' splays] on the north side of East 76 Street, 50' east of the Third Avenue street line, in conjunction with New Building M08013299-I1.
M08013299-C3
09/03/2026
Filed — New Building
Installation of 19'-0' curb-cut [14' cut + (2) 2.5' splays] on the north side of East 76 Street, 50' east of the Third Avenue street line, in conjunction with New Building M08013299-I1.
M08013299-C2
08/21/2026
Special inspection requirement — Concrete - Cast-In-Place
Brian Falconer
08/21/2026
Special inspection requirement — Final
Jieming Wang
08/21/2026
Special inspection requirement — Masonry
MARISA HARTE
08/21/2026
Special inspection requirement — Post-installed Anchors
MARISA HARTE
08/21/2026
Special inspection requirement — Structural Steel - Welding
MARISA HARTE
08/21/2026
Special inspection requirement — Structural Steel - Details
MARISA HARTE
08/21/2026
Special inspection requirement — Structural Steel - High Strength Bolting
MARISA HARTE
08/17/2026
Special inspection requirement — Post-installed Anchors
MARISA HARTE
08/17/2026
Special inspection requirement — Sprinkler Systems
MARISA HARTE
08/17/2026
Special inspection requirement — Post-installed Anchors
MARISA HARTE
08/17/2026
Special inspection requirement — Sprinkler Systems
MARISA HARTE
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
08/17/2026
Special inspection requirement — Standpipe Systems
MARISA HARTE
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
08/05/2026
Permit issued — Sidewalk Shed
M00984349-I1-SH
08/03/2026
Permit issued — Construction Fence
M08013299-S9-FN
08/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/21/2026
Filed — New Building
Installation of 19'-0' curb-cut [14' cut + (2) 2.5' splays] on the north side of East 76 Street, 50' east of the Third Avenue street line, in conjunction with New Building M08013299-I1.
M08013299-B8
07/08/2026
Filed — New Building
Installation of 19'-0' curb-cut [14' cut + (2) 2.5' splays] on the north side of East 76 Street, 50' east of the Third Avenue street line, in conjunction with New Building M08013299-I1.
M08013299-B7
06/26/2026
Permit issued — Plumbing
M08013299-Z3-PL
06/18/2026
Signed off — New Building
Installation of 19'-0' curb-cut [14' cut + (2) 2.5' splays] on the north side of East 76 Street, 50' east of the Third Avenue street line, in conjunction with New Building M08013299-I1.
M08013299-S2
06/17/2026
Special inspection requirement — Luminous Exit Path Markings
MARISA HARTE
06/17/2026
Special inspection requirement — Masonry
MARISA HARTE
06/17/2026
Special inspection requirement — Air barrier - visual inspection
Stephen Marchese
06/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Tony Canale
06/17/2026
Special inspection requirement — Fenestration air leakage
Stephen Marchese
06/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
06/17/2026
Special inspection requirement — Lighting controls
Stephen Marchese
06/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Stephen Marchese
05/28/2026
Permit issued — General Construction
M08013299-I1-GC
05/27/2026
Permit issued — General Construction
M08013299-I1-GC
05/20/2026
Signed off — Alteration
Installation and use of contractor shed as per plans filed herewith. This application is filed in conjunction with NB-M08013299-I1.
M01166335-I1
05/15/2026
Permit issued — Sidewalk Shed
M00984349-I1-SH
04/30/2026
Signed off — New Building
Installation of 19'-0' curb-cut [14' cut + (2) 2.5' splays] on the north side of East 76 Street, 50' east of the Third Avenue street line, in conjunction with New Building M08013299-I1.
M08013299-S1
04/24/2026
Violation issued (ECB, closed)
Unknown
04/24/2026
Objection raised — Energy
04/23/2026
Objection raised — Other
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutPermit IssuedConsigli Construction Co10/06/2026
DOB NOWSidewalk ShedPermit IssuedSafway Atlantic09/21/2026
DOB NOWConstruction FencePermit IssuedSafway Atlantic09/16/2026
DOB NOWSidewalk ShedSigned-offUrban Intelligence08/05/2026
DOB NOWConstruction FencePermit IssuedConsigli Construction Co08/03/2026
DOB NOWPlumbingSigned-offParkview P&H06/26/2026
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co05/28/2026
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co05/27/2026
DOB NOWSidewalk ShedSigned-offUrban Intelligence05/15/2026
DOB NOWPlumbingPermit IssuedCardoza Plumbing Wmbe04/10/2026
DOB NOWSuspended ScaffoldPermit IssuedDoria Scaffolding03/24/2026
DOB NOWBoiler EquipmentPermit IssuedAnthony Disabato03/17/2026
DOB NOWPlumbingPermit IssuedCardoza Plumbing Wmbe03/05/2026
DOB NOWSprinklersPermit IssuedSirina Fire Protection03/04/2026
DOB NOWMechanical SystemsPermit IssuedConsigli Construction Co03/02/2026
DOB NOWPlumbingPermit IssuedParkview P&H01/30/2026
DOB NOWSupported ScaffoldPermit IssuedSafway Atlantic01/13/2026
DOB NOWSidewalk ShedSigned-offExterior Wall & Building12/31/2025
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co12/31/2025
DOB NOWPlumbingPermit IssuedCardoza Plumbing Wmbe12/16/2025
DOB NOWSprinklersPermit IssuedSirina Fire Protection12/08/2025
DOB NOWStandpipePermit IssuedSirina Fire Protection12/08/2025
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co11/25/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedW W Glass10/23/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedW W Glass10/23/2025
DOB NOWSidewalk ShedPermit IssuedSafway Atlantic09/30/2025
DOB NOWSuspended ScaffoldPermit IssuedSafway Atlantic09/26/2025
DOB NOWSupported ScaffoldPermit IssuedSafway Atlantic09/26/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSafway Atlantic09/26/2025
DOB NOWConstruction FencePermit IssuedSafway Atlantic09/25/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSafway Atlantic09/25/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSafway Atlantic09/25/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSafway Atlantic09/25/2025
DOB NOWStructuralPermit IssuedConsigli Construction Co09/24/2025
DOB NOWConstruction FencePermit IssuedConsigli Construction Co09/02/2025
DOB NOWBoiler EquipmentSigned-offApproved Oil Co. of Brook08/21/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedW W Glass07/25/2025
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co06/27/2025
DOB NOWConstruction FencePermit IssuedConsigli Construction Co06/24/2025
DOB NOWPlumbingSigned-offParkview P&H05/08/2025
+ 10 more permits on file
1 project · most recent 10/14/2026
Air Conditioning Systems Generators Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/14/2026Permit IssuedConsigli Construction CoAir Conditioning Systems, Generators, Heating and Air Conditioning Systems, Heating Systems
Cooling
Liebert Model # CW060U 107,000 BTU · Crac Unit ×4
Nortek Model # 0000000000 773,700 BTU · Fan Coil Indoor ×1
ENERGY RECOVERY RATIO = 60.5% HEATING; 37.5% COOLING 773,700 BTU · Erv ×1
Heat / Cool
Nortek Model # 0000000000 776,300 BTU · Fan Coil Indoor ×19
Model # CSU-6K HW/CHW 494 BTU · Ahu ×10
ENERGY RECOVERY RATIO = 60.5% HEATING; 37.5% COOLING 776,300 BTU · Erv ×5
Model # CSU-10K HW/CHW 817 BTU · Ahu ×1
Model # CSU-13K HW/CHW 1,053 BTU · Ahu ×1
Model # CSU-18K HW/CHW 1,448 BTU · Ahu ×1
Model # CSU-6K HW/CH 494 BTU · Ahu ×1
Model # CSU-8K HW/CHW 480 BTU · Ahu ×1
__Junk__ Model # 0000000000 6,040,000 BTU ×1
Tsi Model # FOSSILX-LT 8 6,040,000 BTU ×3
Heating
Kampmann Model # 0000000000 7,700 BTU · Fan Coil Indoor ×5
Model # KATHERM HK 7,700 BTU · Fan Coil Indoor ×5
Unknown Model # 0000000000 197,000 BTU ×2
Ventilation
Twin City Fan Model # 0000000000 30,000 CFM ×15
Model # 3LFL 3,600 CFM · Exhaust Fan ×7
Model # MF-D 8,700 CFM · Exhaust Fan ×3
Model # SOUND TRAP 2,600 CFM · Exhaust Fan ×1
SMOKE EXHAUST 30,000 CFM · Exhaust Fan ×1
Iac Sound Trap for STAIR PRESSURIZATION 14,000 CFM · Exhaust Fan ×3
Generators
Caterpillar Caterpillar LYM04854 2500KW / 3125 KVA. Note Fuel Oil Piping and Storage under [BE] # M0801299-[Z5] DOB Electrical Plan Review APPROVAL secured 04-19-24 under [EPR] MN02260A1 2,500 kW · Generator ×2
1 project · most recent 10/14/2026
Sprinkler System
FiledStatusContractorScope
10/14/2026Permit IssuedSirina Fire ProtectionSprinkler System
1 project · most recent 10/14/2026
Medical Gas Storm Water/Sanitary
FiledStatusContractorScope
10/14/2026Signed-offParkview P&HMedical Gas, Storm, Water/Sanitary
12 projects · most recent 07/30/2024
General Wiring Lighting
FiledStatusContractorScope
07/30/2024Permit IssuedA.S.R. Electrical ContractingGeneral Wiring, Lighting
05/24/2024Permit IssuedA.S.R. Electrical Contracting—
04/30/2024Permit IssuedA.S.R. Electrical Contracting—
04/18/2024Permit IssuedCorporate Electric Group—
04/12/2024Permit IssuedA.S.R. Electrical Contracting—
03/18/2024Permit IssuedA'S Electric Contracting—
11/02/2023Permit IssuedA.S.R. Electrical Contracting—
09/19/2023Permit IssuedRobert B SamuelsGeneral Wiring
05/16/2023Permit IssuedA.S.R. Electrical ContractingGeneral Wiring
06/28/2022Permit IssuedNash Electric Services—
04/03/2019CompleteNash Electric Services—
03/07/2019Permit IssuedPolaris Electrical Construction—
1 project · most recent 10/14/2026
Steel Concrete Masonry
FiledStatusContractorScope
10/14/2026Permit IssuedConsigli Construction CoSteel, Concrete, Masonry
4 projects · most recent 10/14/2026
Fence Scaffold
FiledStatusContractorScope
10/14/2026Permit IssuedConsigli Construction CoFence
08/29/2025Permit IssuedSafway AtlanticScaffold
04/25/2024Permit IssuedCross Country ConstructionScaffold
01/04/2024Permit IssuedSafway AtlanticFence
1 project · most recent 04/02/2026
Suspended Scaffold
FiledStatusContractorScope
04/02/2026Permit IssuedDoria ScaffoldingSuspended Scaffold
3 projects · most recent 04/02/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/02/2026Permit IssuedDoria ScaffoldingSuspended Scaffold (SC)
07/29/2025Permit IssuedSafway AtlanticSuspended Scaffold (SC)
12/17/2024Permit IssuedW & W GlassSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
09/14/2026Under Review Boiler Equipment InspectionUnder ReviewView ↗
08/03/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/02/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/09/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
01/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/15/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
07/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/05/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
03/27/2024Pass-Final PL - UndergroundPassView ↗
03/06/2024Pass-Final PL - UndergroundPassView ↗
01/23/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/25/2026Maintenance informationMARISA HARTEenergy_progress
09/25/2026HVAC-R and service water piping design and insulationMARISA HARTEenergy_progress
09/25/2026Heating SystemsMARISA HARTEspecial
09/25/2026HVAC-R and service water heating system controlsMARISA HARTEenergy_progress
09/25/2026HVAC-R and service water heating equipmentMARISA HARTEenergy_progress
09/11/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMARISA HARTEspecial
09/11/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
09/11/2026Post-installed AnchorsMARISA HARTEspecial
08/21/2026Structural Steel - DetailsMARISA HARTEspecial
08/21/2026MasonryMARISA HARTEspecial
08/21/2026Structural Steel - High Strength BoltingMARISA HARTEspecial
08/21/2026Structural Steel - WeldingMARISA HARTEspecial
08/21/2026FinalJieming Wangprogress
08/21/2026Post-installed AnchorsMARISA HARTEspecial
08/21/2026Concrete - Cast-In-PlaceBrian Falconerspecial
08/17/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
08/17/2026Post-installed AnchorsMARISA HARTEspecial
08/17/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
08/17/2026Sprinkler SystemsMARISA HARTEspecial
08/17/2026Post-installed AnchorsMARISA HARTEspecial
08/17/2026Standpipe SystemsMARISA HARTEspecial
08/17/2026Sprinkler SystemsMARISA HARTEspecial
06/17/2026Interior lighting powerStephen Marcheseenergy_progress
06/17/2026Lighting controlsStephen Marcheseenergy_progress
06/17/2026Air barrier - visual inspectionStephen Marcheseenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Northwell HealthMedical / Healthcare—
Project M08005109 Alteration · LOC Issued · 09/20/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 325 on file (BIS + DOB NOW)
▸Plans & Drawings90
▸DOB NOWPlans/Sketch85
09/01/2026M08005109-I1Request digital key ↗
08/31/2026M00852570-I1Request digital key ↗
08/29/2026M00897018-I1Request digital key ↗
Showing 3 of 85 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
09/05/2026M00129037-I1Request digital key ↗
09/05/2026M00129037-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00129066-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00129010-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
09/01/2026M08005334-I1Request digital key ↗
▸Applications & Permits4
▸DOB NOWDEP Stormwater Maintenance Permit/Notice of Termination2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP Stormwater Construction Permit2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZoning Exhibit form (1-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications184
▸DOB NOWDPL-1: Design Professional Seal & Signature92
10/16/2026M08013299-C6Open ↗
09/15/2026M08013299-C5Open ↗
09/15/2026M08013299-C3Open ↗
Showing 3 of 92 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature56
10/16/2026M08013299-C6Open ↗
09/30/2026M01081852-I1Open ↗
09/23/2026M08013299-C5Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWProgress Inspector Seal & Signature36
10/16/2026M08013299-C6Open ↗
09/02/2026M08013299-B1Open ↗
09/02/2026M08013299-B1Open ↗
Showing 3 of 36 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR5 Test Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs21
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter21
10/16/2026M08013299-C6Open ↗
09/15/2026M08013299-C5Open ↗
09/01/2026M08005109-I1Open ↗
Showing 3 of 21 on file for this type
▸Other Documents21
▸DOB NOWCalculations7
08/25/2026M01081852-I1Open ↗
08/25/2026M01081852-P1Open ↗
08/25/2026M01081852-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWManufacturer's Specifications7
08/25/2026M01081852-I1Open ↗
08/25/2026M01081852-P1Open ↗
08/25/2026M01081852-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSite Survey: Initial1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type