← Back
Factory, heavy manufacturing, fireproof
1345 HALSEY STREET
BROOKLYN · Bushwick (East) · BIN 3078717
💬 Discuss this project
1928Year Built
1Stories
F1Building Class
M1-1Zoning
16,000 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Factory, heavy manufacturing, fireproof · Owner of record: MB-DJ REALTY LLC · 16,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 13p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SOBRE MASA1007/08/2026
MB-DJ REALTY403/22/2026
EURAMA FOOD INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARQUITECTURA VARELA506/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L & J DESIGN GROUP1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A&H EXPRESS PLBG&HTG CORPPlumbing207/08/2026
OSTRAVA ELECTRIC CORPElectrical103/22/2026
WILLDAN ELECTRICAL OF NYElectrical103/22/2026
INNOVATIVE VENTURES TEAMGeneral Contractor107/08/2026
Building Lifecycle
All (48)Filed (5)Permit Issued (3)Signed Off (1)Violation (8)Inspection (4)Objection (12)Special Inspection (15)
02/05/2026
Violation issued (FDNY_NOV, closed)
08/07/2025
Signed off — Alteration
GENERAL CONSTRUCTION IN EXISTING 1 STORY BUILDING. NEW PARTITIONS, REPLACE FLOORS, FINISHES, NEW FIXTURES THROUGHOUT, ALL AS PER PLANS SUBMITTED.- NO CHANGE IN OCCUPANCY, USE OR EGRESS OF THE BUILDING- THIS PORTION OF BUILDING WILL BE USED AS A FOOD.
B01039011-S1
03/14/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/28/2024
Filed — Alteration
GENERAL CONSTRUCTION IN EXISTING 1 STORY BUILDING. NEW PARTITIONS, REPLACE FLOORS, FINISHES, NEW FIXTURES THROUGHOUT, ALL AS PER PLANS SUBMITTED.- NO CHANGE IN OCCUPANCY, USE OR EGRESS OF THE BUILDING- THIS PORTION OF BUILDING WILL BE USED AS A FOOD.
B01039011-P2
06/10/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/31/2024
Filed — Alteration
GENERAL CONSTRUCTION IN EXISTING 1 STORY BUILDING. NEW PARTITIONS, REPLACE FLOORS, FINISHES, NEW FIXTURES THROUGHOUT, ALL AS PER PLANS SUBMITTED.- NO CHANGE IN OCCUPANCY, USE OR EGRESS OF THE BUILDING- THIS PORTION OF BUILDING WILL BE USED AS A FOOD.
B01039011-P1
05/23/2024
Permit issued — Plumbing
B01039011-S1-PL
05/09/2024
Permit issued — Plumbing
B01039011-S1-PL
05/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/02/2024
Filed — Alteration
GENERAL CONSTRUCTION IN EXISTING 1 STORY BUILDING. NEW PARTITIONS, REPLACE FLOORS, FINISHES, NEW FIXTURES THROUGHOUT, ALL AS PER PLANS SUBMITTED.- NO CHANGE IN OCCUPANCY, USE OR EGRESS OF THE BUILDING- THIS PORTION OF BUILDING WILL BE USED AS A FOOD.
B01039011-S1
04/29/2024
Permit issued — General Construction
B01039011-I1-GC
04/24/2024
Filed — Alteration
GENERAL CONSTRUCTION IN EXISTING 1 STORY BUILDING. NEW PARTITIONS, REPLACE FLOORS, FINISHES, NEW FIXTURES THROUGHOUT, ALL AS PER PLANS SUBMITTED.- NO CHANGE IN OCCUPANCY, USE OR EGRESS OF THE BUILDING- THIS PORTION OF BUILDING WILL BE USED AS A FOOD.
B01039011-I1
04/19/2024
Special inspection requirement — Lighting controls
Vicente Varela
04/19/2024
Special inspection requirement — Interior lighting power
Vicente Varela
04/19/2024
Special inspection requirement — Energy Code Compliance Inspections
Vicente Varela
04/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
Vicente Varela
04/19/2024
Special inspection requirement — Final
Vicente Varela
12/27/2023
Objection resolved — Resolved
12/27/2023
Objection resolved — Resolved
12/18/2023
Objection raised — Zoning
12/13/2023
Objection raised — Mechanical
12/13/2023
Objection raised — Fire_Protection
12/13/2023
Objection raised — Fire_Protection
12/13/2023
Objection raised — Fire_Protection
12/13/2023
Objection raised — Structural
12/13/2023
Objection raised — Fire_Protection
12/13/2023
Objection raised — Fire_Protection
12/13/2023
Objection raised — Plumbing
12/13/2023
Objection raised — Fire_Protection
12/08/2023
Filed — Alteration
GENERAL CONSTRUCTION IN EXISTING 1 STORY BUILDING. NEW PARTITIONS, REPLACE FLOORS, FINISHES, NEW FIXTURES THROUGHOUT AL AS PER PLANS SUBMITED.
B00964197-I1
11/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/30/2023
Special inspection requirement — Interior lighting power
Vicente Varela
11/30/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Vicente Varela
11/30/2023
Special inspection requirement — Lighting controls
Vicente Varela
11/30/2023
Special inspection requirement — Energy Code Compliance Inspections
Vicente Varela
11/30/2023
Special inspection requirement — Fire-Resistance Rated Construction
Vicente Varela
11/30/2023
Special inspection requirement — Fenestration areas
Vicente Varela
11/30/2023
Special inspection requirement — Fenestration air leakage
Vicente Varela
11/16/2023
Special inspection requirement — Final
11/16/2023
Special inspection requirement — Mechanical Systems
10/03/2022
Violation issued (ECB, closed)
Construction
09/01/2020
Violation issued (FDNY_NOV, closed)
06/25/2020
Violation issued (FDNY_NOV, closed)
11/12/2014
Violation issued (FDNY_NOV, closed)
02/02/2009
Violation issued (FDNY_NOV, closed)
01/25/2007
Violation issued (FDNY_NOV, closed)
08/07/2006
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP05/23/2024
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP05/09/2024
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE VENTURES TEAM04/29/2024
BISPLISSUEDCITY TESTING & PLUMBING I01/21/2000
BISMHISSUEDCHRIS OWEN PLG HTNG01/19/2000
1 project · most recent 06/28/2024
Gas Water/Sanitary
FiledStatusContractorScope
06/28/2024Signed-offDEPENDABLE MECH CORPGas, Water/Sanitary
2 projects · most recent 08/25/2024
General Wiring
FiledStatusContractorScope
08/25/2024CompleteOSTRAVA ELECTRIC CORPGeneral Wiring
02/25/2019CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
04/19/2024Lighting controlsVicente Varelaenergy_progress
04/19/2024Interior lighting powerVicente Varelaenergy_progress
04/19/2024Energy Code Compliance InspectionsVicente Varelaprogress
04/19/2024Fire-Resistance Rated ConstructionVicente Varelaprogress
04/19/2024FinalVicente Varelaprogress
11/30/2023Fire-Resistant Penetrations and Joints—special
11/30/2023Interior lighting powerVicente Varelaenergy_progress
11/30/2023Fenestration and door U-factor and product ratingsVicente Varelaenergy_progress
11/30/2023Lighting controlsVicente Varelaenergy_progress
11/30/2023Energy Code Compliance InspectionsVicente Varelaprogress
11/30/2023Fire-Resistance Rated ConstructionVicente Varelaprogress
11/30/2023Fenestration areasVicente Varelaenergy_progress
11/30/2023Fenestration air leakageVicente Varelaenergy_progress
11/16/2023Final—progress
11/16/2023Mechanical Systems—special
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026B01039011-P1Request digital key ↗
08/25/2026B01039011-S1Request digital key ↗
08/25/2026B01039011-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026B01039011-P1Open ↗
08/25/2026B01039011-S1Open ↗
08/13/2026B00964197-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026B01039011-I1Open ↗
08/26/2026B01039011-I1Open ↗