← Back
Elevator cooperative
201 EAST 77 STREET
MANHATTAN · BIN 1044096
💬 Discuss this project
1965Year Built
19Stories
D4Building Class
C1-9Zoning
132,445 sfGross Floor Area
99Units
LL97 CoveredRent Stabilized9 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 201 E. 77 OWNERS CORP. · 9,705 sf lot · 13.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof6p · 6 filings · 20 docs
Penthouse1p · 1 filing · 13 docs
Floor 186p · 3 filings · 18 docs
Floor 171 filing · 2 docs
Floor 168p · 2 filings · 10 docs
Floor 151 filing · 2 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 52p · 1 filing · 3 docs
Floor 4
Floor 3
Floor 2
Floor 1
Cellar7p · 3 filings · 20 docs
2 jobs · most recent 04/06/2021
Others Refrigeration Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
04/06/2021——Others, Refrigeration Systems
Refrigeration
Aermec WWM0500 192 tons · Chiller ×1
Other
Taco FL 600 BTU · Condensing Unit ×3
12/16/2019Permit IssuedHI-TECH C.P.M. CORPHeating Systems
Heating
Daikin RX36NMVJU 36,000 BTU · Rooftop Unit ×1
3 jobs · most recent 03/17/2020
Water/Sanitary
FiledStatusContractorScope
03/17/2020——Water/Sanitary
11/07/2019Signed-offHYDROKINETIC PLBG & HTG IWater/Sanitary
08/20/2019——Water/Sanitary
22 jobs · most recent 05/28/2026
General Wiring
FiledStatusContractorScope
05/28/2026CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
02/10/2025CompleteENTERPRISE ELEC'L SYSTEMSGeneral Wiring
06/26/2024CompleteCONDUCTOR ELECL SVCS INC—
06/26/2024Permit IssuedCONDUCTOR ELECL SVCS INCGeneral Wiring
06/06/2024CompleteOPTIMAL ELECTRIC, INCGeneral Wiring
05/08/2024CompleteGS ELECTRIC INC—
06/16/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
01/29/2023CompleteFALCO ELEC'L SERVICES INCGeneral Wiring
12/07/2022CompleteRIDGE ELECTRIC CORP.General Wiring
04/07/2022Permit IssuedK.N.C ELECTRIC INCGeneral Wiring
03/24/2022Permit IssuedDREAM TEAM ELEC'L CORPGeneral Wiring
11/02/2021Permit IssuedDONALD MCGEACHY, INC.General Wiring
10/29/2021Permit IssuedDREAM TEAM ELEC'L CORPGeneral Wiring
06/29/2021CompleteGSA ELECTRIC CORP.General Wiring
04/22/2021CompleteKURT EBINGER ELEC CONST1 meters, 1 new_meters
1 job · most recent 03/13/2020
Steel
FiledStatusContractorScope
03/13/2020——Steel
1 job · most recent 08/25/2023
Scaffold
FiledStatusContractorScope
08/25/2023Permit IssuedCANIDO BASONAS CONST SVCScaffold
Building Lifecycle
All (225)Filed (38)Permit Issued (34)Signed Off (21)Facade (FISP) (12)Violation (53)Inspection (23)Objection (14)Special Inspection (30)
09/04/2026
Objection resolved — Resolved
09/01/2026
Objection raised — Scope
08/18/2026
Filed — Alteration
COMBINATION OF ADJACENT APARTMENTS 9A AND 9B UNDER TPPN 3/97. NO CHANGE TO EGRESS OR OCCUPANCY. PARTITION WORK, REMOVAL OF EXISTING 9A KITCHEN. RELATED PLUMBING WORK TO BE FILED SEPARATELY.
M01444507-I1
08/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL KARANTINIDIS, P.E.
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
08/11/2026
Special inspection requirement — Final
MICHAEL KARANTINIDIS, P.E.
04/07/2026
Signed off — Alteration
Interior renovations as shown. No change to use, occupancy, egress or floor area.
M01191888-I1
01/09/2026
Signed off — Alteration
FILING HEREWITH PLANS TO INDICATE MECHANICAL DUCTWORK WITH INSTALLATION OF HVAC UNIT AS SHOWN ON PLANS. THERE WILL BE NO CHANGE IN USE,EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M01052673-I1
01/06/2026
Signed off — Alteration
M01052656-I1
12/09/2025
Special inspection requirement — Mechanical Systems
Ari Kamo
12/09/2025
Special inspection requirement — Final
Ari Kamo
12/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
11/18/2025
Filed — Alteration
FILING HEREWITH PLANS TO INDICATE MECHANICAL DUCTWORK WITH INSTALLATION OF HVAC UNIT AS SHOWN ON PLANS. THERE WILL BE NO CHANGE IN USE,EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M01052673-P1
10/23/2025
Special inspection requirement — Final
Ari Kamo
10/23/2025
Special inspection requirement — Mechanical Systems
Ari Kamo
10/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/17/2025
Permit issued — General Construction
M01191888-I1-GC
06/20/2025
Permit issued — General Construction
M01052656-I1-GC
06/18/2025
Permit issued — Mechanical Systems
M01052673-I1-MS
05/27/2025
Objection resolved — Addressed
05/20/2025
Objection resolved — Addressed
05/20/2025
Objection resolved — Addressed
05/14/2025
Objection raised — Admin
05/12/2025
Objection raised — Scope
05/12/2025
Objection raised — Cost
04/25/2025
Filed — Alteration
Interior renovations as shown. No change to use, occupancy, egress or floor area.
M01191888-I1
03/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
Richard Boschen
03/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Richard Boschen
03/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Richard Boschen
03/07/2025
Special inspection requirement — Lighting in dwelling units
Richard Boschen
03/07/2025
Special inspection requirement — Final
Richard Boschen
02/04/2025
Signed off — Alteration
FILING HEREWITH PLUMBING PLANS TO INDICATE PLUMBING MODIFICATIONS ON THE FIRST FLOOR WORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M01052692-I1
12/04/2024
Signed off — Alteration
Installation of outrigger for facade repair & inspection.
M00969284-I1
11/22/2024
Signed off — Alteration
PLUMBING WORK IN 5B FILED IN CONJUNCTION WITH DOB NOW BIS JOB. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01035185-I1
11/15/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/15/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/30/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/01/2024
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00891381-I1
07/23/2024
Cycle 9 facade report signed — SAFE
07/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/28/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/27/2024
Cycle 9 facade report submitted
06/20/2024
Permit issued — General Construction
M01052656-I1-GC
06/17/2024
Permit issued — Plumbing
M01052692-I1-PL
06/14/2024
Signed off — Alteration
FACADE AND ROOF REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00862119-I1
06/13/2024
Permit issued — Mechanical Systems
M01052673-I1-MS
06/04/2024
Cycle 9 facade inspection completed
05/24/2024
Filed — Alteration
M01052656-I1
05/22/2024
Permit issued — Supported Scaffold
M00918262-I1-SF
05/21/2024
Filed — Alteration
FILING HEREWITH PLANS TO INDICATE MECHANICAL DUCTWORK WITH INSTALLATION OF HVAC UNIT AS SHOWN ON PLANS. THERE WILL BE NO CHANGE IN USE,EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M01052673-I1
05/21/2024
Filed — Alteration
FILING HEREWITH PLUMBING PLANS TO INDICATE PLUMBING MODIFICATIONS ON THE FIRST FLOOR WORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M01052692-I1
05/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
05/16/2024
Special inspection requirement — Final
ADRIEL MESZNIK
05/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
05/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
05/13/2024
Permit issued — Plumbing
M01035185-I1-PL
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/26/2024
Filed — Alteration
PLUMBING WORK IN 5B FILED IN CONJUNCTION WITH DOB NOW BIS JOB. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01035185-I1
04/24/2024
Signed off — Alteration
INTERIOR RENOVATION OF 16TH FLOOR -APT16AE. WORK TO INCLUDE :MODIFICATIONS TO INTERIOR NON-BEARING PARTITIONS, NEW INTERIOR FINISHES AND LIGHTING INSTALLATION AS INDICATED ON PLANS-PLUMBING FILED UNDER SEPERATE APPLICATION.
M00873050-I1
Latest 60 of 225 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
51 EAST 90 APT5507/08/2026
PLATINUM SERVICES NY407/08/2026
HGC PARTNERS LLC1103/22/2026
PACE ENGINEERING P.C.403/22/2026
201 E 77 OWNERS1103/22/2026
STEEL SYSTEMS103/22/2026
201 EAST 77 OWNERS2303/22/2026
201 EAST 77 STREET OWNERS CORP3503/22/2026
OWNER OF 1343 3 AVE103/22/2026
MATTHEW ADAM PROPERTIES1203/22/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CANIDO BASONAS CONST SVCGeneral Contractor507/08/2026
CORTLANDT CONTRACTING CORPGeneral Contractor407/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor407/08/2026
ALMA C.T. INCGeneral Contractor307/08/2026
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
AA JEDSON COMPANY LLCGeneral Contractor303/21/2026
GORMAN, BARTHOLOMEWElectrical203/21/2026
HYDROKINETIC PLBG & HTG IPlumbing207/08/2026
HI-TECH C.P.M. CORPGeneral Contractor203/21/2026
INDUSTRIAL COOLING TCH INGeneral Contractor203/21/2026
KATSELNIK & KATSELNIK GRPGeneral Contractor207/08/2026
MCGEACHY, DONALDElectrical203/21/2026
RENOVATION BY MY HOME INCGeneral Contractor203/21/2026
HIM & WILMAN HOME IMPROVEGeneral Contractor104/09/2026
LOGIC CONSTRUCTION CORPGeneral Contractor107/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor107/08/2026
ZAIM CONTRACTOR CORPGeneral Contractor107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
DELTA-SIGMA MECH CORPPlumbing107/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
MASTER TECH PLUMBING LLCPlumbing107/08/2026
NEW YORK PARK PLBG&HTG COPlumbing107/08/2026
NICE PLUMBING CORPPlumbing107/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
CMY ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTERNATIONAL GEOTEHCNICA1795108/18/2026
AK ENGINEERING PC678511/18/2025
BOSCHEN DESIGN, ARCHITECT2477104/25/2025
PATH ARCHITECTURE P.C.1567109/06/2023
JONATHAN B. HELD AIA ARCH1288406/28/2023
PARADIGM ARCHITECTURE5931105/31/2023
AMERILAND BROOK LLC1506202/02/2023
JOCK DEBOER, AIA - SIA7008112/09/2022
CATALPA SPECIAL INSPECTIO2004307/29/2021
WONG ARCHITECT1272206/06/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHIM & WILMAN HOME IMPROVE07/17/2025
DOB NOWGeneral ConstructionSigned-offCORTLANDT CONTRACTING COR06/20/2025
DOB NOWMechanical SystemsSigned-offCORTLANDT CONTRACTING COR06/18/2025
DOB NOWGeneral ConstructionSigned-offCORTLANDT CONTRACTING COR06/20/2024
DOB NOWPlumbingSigned-offMASTER TECH PLUMBING LLC06/17/2024
DOB NOWMechanical SystemsSigned-offCORTLANDT CONTRACTING COR06/13/2024
DOB NOWSupported ScaffoldPermit IssuedCANIDO BASONAS CONST SVC05/22/2024
DOB NOWPlumbingSigned-offNEW YORK PARK PLBG&HTG CO05/13/2024
DOB NOWGeneral ConstructionSigned-offKATSELNIK & KATSELNIK GRP01/22/2024
DOB NOWGeneral ConstructionSigned-offCANIDO BASONAS CONST SVC12/11/2023
DOB NOWSuspended ScaffoldSigned-offCANIDO BASONAS CONST. COR12/05/2023
DOB NOWPlumbingSigned-offDELTA-SIGMA MECH CORP11/15/2023
DOB NOWGeneral ConstructionSigned-offKATSELNIK & KATSELNIK GRP09/26/2023
DOB NOWSupported ScaffoldPermit IssuedCANIDO BASONAS CONSTRUCTI08/25/2023
DOB NOWGeneral ConstructionSigned-offCANIDO BASONAS CONST SVC08/08/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC06/21/2023
DOB NOWGeneral ConstructionSigned-offALMA C.T. INC03/06/2023
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.03/01/2023
DOB NOWMechanical SystemsSigned-offKLE CONSTRUCTION INC02/13/2023
DOB NOWPlumbingSigned-offNICE PLUMBING CORP01/31/2023
DOB NOWGeneral ConstructionSigned-offALMA C.T. INC01/20/2023
DOB NOWGeneral ConstructionPermit IssuedLOGIC CONSTRUCTION CORP12/28/2022
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR11/01/2022
DOB NOWGeneral ConstructionSigned-offSUFFOLK CONSTRUCT CO. INC09/14/2022
DOB NOWGeneral ConstructionSigned-offRENOVATION BY MY HOME INC07/07/2021
DOB NOWPlumbingSigned-offTMS PLBG & HEATING CORP07/01/2021
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I06/01/2021
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC01/11/2021
DOB NOWMechanical SystemsSigned-offAA JEDSON COMPANY LLC01/07/2021
DOB NOWMechanical SystemsPermit IssuedINDUSTRIAL COOLING TCH IN09/29/2020
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I02/07/2020
DOB NOWMechanical SystemsPermit IssuedHI-TECH C.P.M. CORP12/27/2019
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC12/28/2018
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC07/27/2018
BISPLISSUEDFLINT MECHANICAL CORP10/31/2025
BISOTISSUEDD.S.C.CONSTRUCTION INC05/08/2024
BISOTISSUEDMP RENOVATIONS INC08/31/2021
BISOTISSUEDMP RENOVATIONS INC03/22/2021
BISOTISSUEDRENWOOD INTERIORS CORP03/18/2021
BISOTISSUEDAA JEDSON COMPANY LLC01/25/2021
+ 44 more permits on file
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
11/15/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/28/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/17/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/24/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/19/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
08/11/2026Fire-Resistance Rated ConstructionMICHAEL KARANTINIDIS, P.E.progress
08/11/2026Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
08/11/2026FinalMICHAEL KARANTINIDIS, P.E.progress
12/09/2025FinalAri Kamoprogress
12/09/2025Mechanical SystemsAri Kamospecial
12/09/2025Tenant Protection Plan ComplianceAri Kamospecial
10/23/2025FinalAri Kamoprogress
10/23/2025Tenant Protection Plan Compliance—special
10/23/2025Mechanical SystemsAri Kamospecial
03/07/2025Fire-Resistance Rated ConstructionRichard Boschenprogress
03/07/2025Fire-Resistant Penetrations and JointsRichard Boschenspecial
03/07/2025Energy Code Compliance InspectionsRichard Boschenprogress
03/07/2025FinalRichard Boschenprogress
03/07/2025Lighting in dwelling unitsRichard Boschenenergy_progress
05/20/2024Tenant Protection Plan ComplianceAri Kamospecial
05/16/2024FinalADRIEL MESZNIKprogress
05/16/2024Fire-Resistant Penetrations and JointsAri Kamospecial
05/16/2024Tenant Protection Plan ComplianceAri Kamospecial
02/25/2024Structural Steel - Details—special
11/29/2023Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
06/28/2023Fire-Resistant Penetrations and JointsJONATHAN HELDspecial
06/22/2023Fire-Resistant Penetrations and JointsJONATHAN HELDspecial
05/10/2023Lighting in dwelling unitsAjay Chopraenergy_progress
05/10/2023Energy Code Compliance InspectionsAjay Chopraprogress
05/10/2023Fire-Resistant Penetrations and JointsWOJCIECH OKTAWIECspecial
Latest 25 of 82.
▾Documents — 740 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch28
09/06/2026M00062651-I1Request digital key ↗
09/04/2026M00439983-S1Request digital key ↗
09/03/2026M00534417-I1Request digital key ↗
Showing 3 of 28 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00275211-I1Request digital key ↗
09/05/2026M00316744-I1Request digital key ↗
09/04/2026M00439983-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00204655-I1Request digital key ↗
09/05/2026M00332414-I1Request digital key ↗
09/04/2026M00349738-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00332220-I1Request digital key ↗
▸Applications & Permits113
▸BISWORK PERMIT APPLICATION62
10/31/2025121918880Open ↗
05/08/2024123129792Open ↗
04/29/2022140991728Open ↗
Showing 3 of 62 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION51
10/14/2025121918880Open ↗
04/24/2024123129792Open ↗
04/10/2024123129792Open ↗
Showing 3 of 51 on file for this type
▸Seals & Professional Certifications226
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION67
03/06/2020123902376Open ↗
01/31/2020123739810Open ↗
01/31/2020123739810Open ↗
Showing 3 of 67 on file for this type
▸DOB NOWProgress Inspector Seal & Signature46
09/29/2026M01052673-I1Open ↗
09/15/2026M01052673-P1Open ↗
09/01/2026M00873050-I1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature37
09/06/2026M00062651-I1Open ↗
09/03/2026M00349748-P1Open ↗
09/03/2026M00349748-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/29/2026M01052673-I1Open ↗
09/29/2026M01052673-I1Open ↗
09/15/2026M01052673-P1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
05/14/2019123902376Open ↗
07/10/2018123521073Open ↗
02/14/2018123360683Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
07/10/2020140903565Open ↗
05/13/2019123902376Open ↗
05/13/2019123902376Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
02/20/2021140991728Open ↗
07/10/2020140903565Open ↗
Showing 2 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
07/10/2020140903565Open ↗
Showing 1 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/20/2021140991728Open ↗
▸Trade Schedules & Equipment39
▸BISSELF-CERT PLUMBING NOTICE18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISSCHEDULE B - PLUMBING9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
10/07/2019123656908Open ↗
09/19/2019123656908Open ↗
02/14/2019123656908Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection23
▸BISTenant Protection Plan and Notes12
11/06/2019123739810Open ↗
08/26/2019123801449Open ↗
08/21/2019123782898Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWTenant Protection Plan9
09/03/2026M00349748-I1Open ↗
09/03/2026M00349748-P1Open ↗
08/13/2026M00332220-I1Open ↗
Showing 3 of 9 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
04/20/2021140991728Open ↗
▸Environmental & Asbestos63
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
09/03/2026M00349748-P1Open ↗
09/03/2026M00349748-I1Open ↗
09/02/2026M00770918-P1Open ↗
Showing 3 of 30 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)17
03/08/2021140991728Open ↗
11/06/2019123739810Open ↗
08/26/2019123801449Open ↗
Showing 3 of 17 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/15/2020140903565Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance57
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
01/31/2020123739810Open ↗
10/21/2019123656908Open ↗
10/21/2019123656908Open ↗
Showing 3 of 21 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
12/20/2024123129792Open ↗
10/21/2019123656908Open ↗
10/02/2018123185579Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
12/20/2024123129792Open ↗
08/13/2021140903565Open ↗
08/13/2021140903565Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
02/20/2021140991728Open ↗
07/10/2020140903565Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
08/13/2021140903565Open ↗
12/03/2020123782898Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00534417-I1Open ↗
08/13/2026M00534485-I1Open ↗
▸BISINTERIOR LIGHTING POWER1
08/13/2021140903565Open ↗
▸BISLIGHTING CONTROLS1
08/13/2021140903565Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY13
12/20/2024123129792Open ↗
08/13/2021140903565Open ↗
08/13/2021140903565Open ↗
Showing 3 of 13 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
11/22/2024123129792Open ↗
08/13/2021140903565Open ↗
▸Approvals, Objections & Sign-offs41
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST22
12/23/2024123129792Open ↗
08/13/2021140903565Open ↗
12/08/2020123782898Open ↗
Showing 3 of 22 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
05/08/2020123902376Open ↗
07/12/2018121870840Open ↗
Showing 2 of 4 on file for this type
▸BISSUPERSEDING LETTER4
10/31/2025121918880Open ↗
04/29/2022140991728Open ↗
04/29/2022140991728Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL1
08/13/2021140903565Open ↗
▸Cost, Insurance & Ownership57
▸BISCOST AFFIDAVIT52
02/20/2021140991728Open ↗
08/03/2020123902376Open ↗
07/10/2020140903565Open ↗
Showing 3 of 52 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
12/20/2024123129792Open ↗
08/13/2021140903565Open ↗
12/03/2020123782898Open ↗
▸BISWELDERS AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms61
▸BISEFILING COVER SHEET32
11/06/2019123739810Open ↗
08/07/2019123711037Open ↗
08/02/2019123801449Open ↗
Showing 3 of 32 on file for this type
▸BISBOROUGH INTAKE FORM17
10/31/2025121918880Open ↗
04/29/2022140991728Open ↗
04/29/2022140991728Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION6
11/06/2019123739810Open ↗
10/09/2019123656908Open ↗
02/14/2019123656908Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
02/20/2021140991728Open ↗
07/10/2020140903565Open ↗
Showing 2 of 6 on file for this type
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
03/12/2019123656908Open ↗
10/02/2018123185579Open ↗
Showing 2 of 3 on file for this type
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M00969284-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M00969284-I1Open ↗