← Back
Two stories - detached, small or mid-size
1349 EAST 65 STREET
BROOKLYN · Marine Park-Mill Basin-Bergen Beach · BIN 3235977
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R3-2Zoning
1,240 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: KKP1 GROUP LLC · 4,800 sf lot · 0.26 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentGeneral
Attic30p · 1 filing · 20 docs
Floor 231p · 1 filing · 20 docs
Floor 131p · 1 filing · 20 docs
Cellar32p · 1 filing · 20 docs
Site & exterior17p · 2 filings · 20 docs
Filed — no permit issued1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ATOMIC CONTRACTING4609/13/2026
KALICO GROUP103/22/2026
KKPI GROUP INC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/02/2024$530K—— → —$427/sf building
07/30/2024$388K—Private party → Private party$313/sf building
09/13/2022$1.1M—Private party → Private party$921/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC1804/03/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor507/08/2026
POWER SURGE ELECTRIC, INCElectrical203/22/2026
RENEW PLUMBING CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SION CONSULTING ENG. PC11081604/03/2026
TRIANGLE INSPECTION & TES74951004/03/2026
Building Lifecycle
All (139)Filed (18)Permit Issued (5)Signed Off (3)Violation (3)Inspection (14)Objection (66)Special Inspection (30)
08/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/28/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/14/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
THIS PLUMBING APPLICATION IS FILED TO ADD NEW PLUMBING FIXTURES
B01168359-I1
04/30/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
THIS PLUMBING APPLICATION IS FILED TO ADD NEW PLUMBING FIXTURES
B01168359-S2
04/13/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/10/2026
Objection raised — Admin
04/10/2026
Objection resolved — Addressed
04/09/2026
Objection resolved — Addressed
04/07/2026
Objection raised — Zoning
04/03/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
THIS PLUMBING APPLICATION IS FILED TO ADD NEW PLUMBING FIXTURES
B01168359-A5
04/03/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/03/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
04/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
04/03/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
sion hourizadeh
04/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
04/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
04/03/2026
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
04/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
04/02/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
THIS PLUMBING APPLICATION IS FILED TO ADD NEW PLUMBING FIXTURES
B01168359-A4
03/05/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
THIS PLUMBING APPLICATION IS FILED TO ADD NEW PLUMBING FIXTURES
B01168359-A3
03/05/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
sion hourizadeh
03/05/2026
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
03/05/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
03/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
03/05/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
03/05/2026
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
03/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
03/05/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
sion hourizadeh
03/05/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
03/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
03/05/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
03/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
03/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
03/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
02/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/04/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
THIS PLUMBING APPLICATION IS FILED TO ADD NEW PLUMBING FIXTURES
B01168359-A2
02/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
02/04/2026
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
02/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
02/04/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
02/04/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
02/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
01/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
THIS PLUMBING APPLICATION IS FILED TO ADD NEW PLUMBING FIXTURES
B01168359-A1
01/05/2026
Signed off — Alteration
THIS APPLICATION IS FILED FOR NEW 8' HEIGHT TEMPORARY CONSTRUCTION FENCE
B01132761-I1
01/02/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
THIS PLUMBING APPLICATION IS FILED TO ADD NEW PLUMBING FIXTURES
B01168359-P9
12/23/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
THIS PLUMBING APPLICATION IS FILED TO ADD NEW PLUMBING FIXTURES
B01168359-P8
12/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/16/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
THIS PLUMBING APPLICATION IS FILED TO ADD NEW PLUMBING FIXTURES
B01168359-P7
12/15/2025
Permit issued — Plumbing
B01168359-S2-PL
12/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/07/2025
Objection resolved — Addressed
11/03/2025
Objection raised — Plumbing
10/22/2025
Objection raised — Scope
10/22/2025
Objection resolved — Addressed
10/21/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
THIS PLUMBING APPLICATION IS FILED TO ADD NEW PLUMBING FIXTURES
B01168359-P6
10/21/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
THIS PLUMBING APPLICATION IS FILED TO ADD NEW PLUMBING FIXTURES
B01168359-P5
Latest 60 of 139 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offRENEW PLUMBING CORP12/15/2025
DOB NOWConstruction FenceSigned-offJ&J DESIGNS INC09/04/2025
DOB NOWPlumbingSigned-offRENEW PLUMBING CORP07/31/2025
DOB NOWFoundationPermit IssuedJ&J DESIGNS INC04/16/2025
DOB NOWConstruction FenceSigned-offJ&J DESIGNS INC10/28/2024
1 project · most recent 04/03/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/03/2026Permit IssuedJ&J DESIGNS INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAMHZ2 4,800 BTU · Heat Pump Outdoor ×9
Cooper & Hunter CH-48AHU 4,800 BTU · Condensing Unit ×6
CH-RS48LCAHU 4,800 BTU · Electric Heater ×6
Ventilation
Honeywell VNT5200E1000/U 200 CFM · Erv ×18
1 project · most recent 04/03/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/03/2026Signed-offRENEW PLUMBING CORPGas, Storm, Water/Sanitary
2 projects · most recent 01/15/2026
General Wiring
FiledStatusContractorScope
01/15/2026CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
06/03/2025CancelledPOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 04/03/2026
Wood
FiledStatusContractorScope
04/03/2026Signed-offRENEW PLUMBING CORPWood
1 project · most recent 04/25/2025
Fence
FiledStatusContractorScope
04/25/2025——Fence
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
08/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/28/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/13/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/02/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
12/02/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/21/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/13/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
04/03/2026Fire-Resistant Penetrations and Jointssion hourizadehspecial
04/03/2026HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
04/03/2026HVAC-R and service water heating equipmentsion hourizadehenergy_progress
04/03/2026HVAC-R and service water heating system controlssion hourizadehenergy_progress
04/03/2026Energy Code Compliance Inspectionssion hourizadehprogress
04/03/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
04/03/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
04/03/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationsion hourizadehspecial
03/05/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
03/05/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationsion hourizadehspecial
03/05/2026Fire-Resistant Penetrations and Jointssion hourizadehspecial
03/05/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
03/05/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/05/2026Energy Code Compliance Inspectionssion hourizadehprogress
03/05/2026HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
03/05/2026HVAC-R and service water heating system controlssion hourizadehenergy_progress
03/05/2026HVAC-R and service water heating equipmentsion hourizadehenergy_progress
03/05/2026Fire-Resistant Penetrations and Jointssion hourizadehspecial
03/05/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationsion hourizadehspecial
03/05/2026HVAC-R and service water heating equipmentsion hourizadehenergy_progress
03/05/2026HVAC-R and service water heating system controlssion hourizadehenergy_progress
03/05/2026HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
03/05/2026Energy Code Compliance Inspectionssion hourizadehprogress
03/05/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
02/04/2026Fire-Resistant Penetrations and Jointssion hourizadehspecial
Latest 25 of 150.
▾Documents — 193 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/23/2026B01132761-I1Request digital key ↗
08/21/2026B01168372-I1Request digital key ↗
08/17/2026B01168359-P8Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION1
09/11/2025340920356Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
12/09/2025340920356Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/14/2025340920356Open ↗
▸Zoning, Tax Lot & Property Records18
▸DOB NOWZD1: DOB Zoning Diagram6
08/13/2026B01168359-A4Open ↗
08/13/2026B01168359-I1Open ↗
08/13/2026B01168359-P5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp6
08/13/2026B01168359-A4Open ↗
08/13/2026B01168359-P5Open ↗
08/13/2026B01168359-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/13/2026B01168359-I1Open ↗
08/13/2026B01168359-A4Open ↗
08/13/2026B01168359-P3Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications85
▸DOB NOWSpecial Inspector Seal & Signature35
09/29/2026B01168359-A3Open ↗
09/29/2026B01168359-A3Open ↗
09/29/2026B01168359-A3Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/29/2026B01168359-A3Open ↗
09/29/2026B01168359-A3Open ↗
09/25/2026B01168359-A2Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/21/2026B01168372-I1Open ↗
08/17/2026B01168359-A5Open ↗
08/17/2026B01168359-P5Open ↗
Showing 3 of 18 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/11/2025340920356Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/11/2025340920356Open ↗
▸Safety & Tenant Protection5
▸BISBPP: STREET TREES SITE PLAN1
09/11/2025340920356Open ↗
▸BISSTREET TREE CHECKLIST1
09/11/2025340920356Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B01168359-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01168359-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01168359-I1Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/17/2026B01168359-A5Open ↗
08/17/2026B01168359-A4Open ↗
08/17/2026B01168359-A1Open ↗
Showing 3 of 16 on file for this type
▸Inspections & Test Reports19
▸DOB NOWSOIL REPORT16
08/13/2026B01168359-P1Open ↗
08/13/2026B01168359-A4Open ↗
08/13/2026B01168359-A3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026B01168359-S2Open ↗
08/13/2026B01168359-S1Open ↗
08/13/2026B01168359-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
12/09/2025340920356Open ↗
12/09/2025340920356Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
12/09/2025340920356Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
09/11/2025340920356Open ↗
▸Other Documents25
▸DOB NOWSite Survey: Initial6
08/13/2026B01168359-P5Open ↗
08/13/2026B01168359-P3Open ↗
08/13/2026B01168359-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/13/2026B01168359-A4Open ↗
08/13/2026B01168359-P3Open ↗
08/13/2026B01168359-P5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification6
08/17/2026B01168359-P2Open ↗
08/17/2026B01168359-A4Open ↗
08/17/2026B01168359-P5Open ↗
Showing 3 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION4
12/09/2025340920356Open ↗
12/09/2025340920356Open ↗
12/09/2025340920356Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey2
08/17/2026B01168359-I1Open ↗
08/13/2026B01168359-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01168359-I1Open ↗