← Back
BuildNYC
Elevator cooperative
1349 LEXINGTON AVENUE
MANHATTAN · BIN 1048133
💬 Discuss this project
1922Year Built
10Stories
D4Building Class
C1-8XZoning
112,398 sfGross Floor Area
71Units
LL97 CoveredRent Stabilized1 Active Violation 2 likely answered ▸FISP: SWARMP
Elevator cooperative · Owner of record: 1349 Tenants · 14,596 sf lot · 7.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofAkam Associates, INC.Under Construction24p · 4 filings · 20 docs
Floor 10Unit 10A5p · 1 filing · 7 docs
Floor 9Unit 9F31p · 3 filings · 20 docs
Floor 8Unit 8CUnder Construction9p · 1 filing · 11 docs
Floor 7
Floor 6Unit 6D, Unit 6E, Unit 6AB6p · 3 filings · 18 docs
Floor 5Unit 5E, Unit 5F17p · 2 filings · 20 docs
Floor 4
Floor 3
Floor 2
Floor 1Unit 1D3p · 3 filings · 12 docs
CellarAkam Associates, LLC.31p · 4 filings · 20 docs
BasementAkam Associates, INC.1p · 1 filing · 11 docs
Site & exteriorAkam Associates, INC.Under Construction16p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1349 Tenants7203/22/2026
Argo Real Estate103/21/2026
13-19 Whit103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Agouti Construction Consulting403/21/2026
Kma Designs203/21/2026
Fadjol Kola103/21/2026
J Callahan Consulting1803/21/2026
Hlzae903/21/2026
Nexus Consulting NYC603/21/2026
Stone203/21/2026
Clarke Construction Consultants103/21/2026
PS Engineers203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spire Scaffolding & HoistScaffold903/21/2026
Praxisnyc BuildGeneral Contractor707/08/2026
Aggressive Heatingspecialty_contractor603/21/2026
Kings Group NYScaffold411/11/2026
Precise RenovationGeneral Contractor407/08/2026
Fadjol KolaGeneral Contractor303/21/2026
Cam Energy Heating & MechanicalPlumbing307/08/2026
Shine ConstructionGeneral Contractor203/21/2026
J. Christopher InteriorsGeneral Contractor203/21/2026
Tribute RestorationScaffold108/27/2026
Budget Plumbing & HeatingPlumbing107/08/2026
LCS Plumbing & ConsultingPlumbing107/08/2026
McManus Mechanical Maintenance P&HPlumbing107/08/2026
New Amsterdam Plumbing & HeatingPlumbing107/08/2026
Par Plumbing CoPlumbing107/08/2026
Accurate ElectricalElectrical103/21/2026
Pipe Solutions AdvisPlumbing107/08/2026
K & G Electric CoElectrical103/21/2026
QNCC Electrical ContractingElectrical103/21/2026
L.D.M. Electl ContractorsElectrical103/22/2026
Linphill Electrical ContractingElectrical103/22/2026
JBJ Concrete RenovationsGeneral Contractor108/21/2026
Quinnco of NYGeneral Contractor104/08/2026
StonecoreGeneral Contractor104/09/2026
Tribute Restorationspecialty_contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Outsource Special Inspection2827105/06/2026
Metric Consulting and Ins1803109/25/2025
Enthink Engineers6247107/22/2025
AK Consulting Services, I6198905/12/2025
Howard L Zimmerman Architects1712401/14/2025
A Degree of Freedom Structural925112/03/2024
Jack Green Associates422112/03/2024
DM Engineers6427612/22/2022
Section F Design3863205/26/2022
Mayta + Sebastian Architects5890103/17/2022
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
11/10/2026
Permit renewed — Sidewalk Shed
Renewed without changes
M01258732-S1-SH
10/07/2026
Permit renewed — Suspended Scaffold
Renewed without changes
M01271624-I1-SC
10/06/2026
Elevator Category 1 inspection report filed
08/26/2026
Permit renewed — Sidewalk Shed
Renewed without changes
M01258732-S1-SH
290 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedKings Group NY11/10/2026
DOB NOWSuspended ScaffoldPermit IssuedTribute Restoration10/07/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY08/26/2026
DOB NOWSupported ScaffoldPermit IssuedTribute Restoration08/26/2026
DOB NOWGeneral ConstructionPermit IssuedJBJ Concrete Renovations08/20/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY06/02/2026
DOB NOWGeneral ConstructionPermit IssuedTribute Restoration03/09/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY03/02/2026
DOB NOWSuspended ScaffoldPermit IssuedTribute Restoration10/02/2025
DOB NOWSuspended ScaffoldPermit IssuedTribute Restoration09/10/2025
DOB NOWGeneral ConstructionPermit IssuedFadjol Kola08/18/2025
DOB NOWPlumbingSigned-offCam Energy Heating & Mechanical07/29/2025
DOB NOWBoiler EquipmentSigned-offRichard Mortman03/05/2025
DOB NOWGeneral ConstructionSigned-offStonecore01/23/2025
DOB NOWPlumbingSigned-offPipe Solutions Advis01/23/2025
DOB NOWPlumbingSigned-offCam Energy Heating & Mechanical09/25/2024
DOB NOWBoiler EquipmentSigned-offAggressive Heating08/27/2024
DOB NOWBoiler EquipmentSigned-offAggressive Heating06/13/2024
DOB NOWMechanical SystemsPermit IssuedAggressive Heating06/13/2024
DOB NOWPlumbingSigned-offBudget Plumbing & Heating05/09/2024
DOB NOWGeneral ConstructionSigned-offJ Christopher Interiors05/03/2024
DOB NOWPlumbingPermit IssuedEdward Fitzsimmons01/05/2024
DOB NOWBoiler EquipmentSigned-offAggressive Heating01/04/2024
DOB NOWMechanical SystemsPermit IssuedAggressive Heating01/04/2024
DOB NOWGeneral ConstructionPermit IssuedPrecise Renovation10/13/2023
DOB NOWMechanical SystemsPermit IssuedPrecise Renovation10/13/2023
DOB NOWMechanical SystemsPermit IssuedAggressive Heating08/09/2023
DOB NOWPlumbingSigned-offCam Energy Heating & Mechanical08/09/2023
DOB NOWBoiler EquipmentSigned-offAggressive Heating07/12/2023
DOB NOWGeneral ConstructionSigned-offShine Construction11/28/2022
DOB NOWMechanical SystemsSigned-offPraxisnyc Build06/21/2022
DOB NOWGeneral ConstructionSigned-offPraxisnyc Build04/21/2022
DOB NOWPlumbingSigned-offPar Plumbing Co03/24/2022
DOB NOWPlumbingSigned-offAttention to Detail P&H.I10/27/2021
DOB NOWGeneral ConstructionSigned-offPraxisnyc Build09/15/2021
DOB NOWPlumbingSigned-offMcManus Mechanical Maintenance P&H05/04/2020
DOB NOWSidewalk ShedSigned-offSpire Scaffolding & Hoist04/30/2020
DOB NOWSidewalk ShedSigned-offSpire Scaffolding & Hoist04/17/2019
DOB NOWSidewalk ShedSigned-offSpire Scaffolding & Hoist03/29/2019
BISOTISSUEDYarks NYC09/28/2021
+ 49 more permits on file
2 projects · most recent 05/12/2025
Air Conditioning Systems
FiledStatusContractorScope
05/12/2025Permit IssuedPrecise RenovationAir Conditioning Systems
10/09/2022——Air Conditioning Systems
2 projects · most recent 05/06/2026
Water/Sanitary Gas
FiledStatusContractorScope
05/06/2026——Water/Sanitary
05/12/2025Permit IssuedNew Amsterdam Plumbing & HeatingGas, Water/Sanitary
12 projects · most recent 08/16/2026
General Wiring Boiler Controls Lighting
FiledStatusContractorScope
08/16/2026Permit IssuedWCK ElectricGeneral Wiring
02/27/2026Permit IssuedHigh Quality Electric of NYC—
01/23/2026Permit IssuedTesta Electric CoBoiler Controls
12/17/2025CompleteL.D.M. Electl ContractorsGeneral Wiring
02/17/2025CompleteL.J.F. & Sons Electrical ContsGeneral Wiring
08/14/2024CompleteApn ElectricalGeneral Wiring
06/03/2022CompleteY.S. ElectricGeneral Wiring, Lighting
03/30/2022CompleteWMS Electrical Contng—
03/24/2022CompleteCresco ElectricalGeneral Wiring
05/01/2019CompleteAccurate Electrical—
03/26/2019Permit IssuedRichard Neu—
05/16/2018Permit IssuedLinphill Electrical ContractingGeneral Wiring
1 project · most recent 08/25/2026
Scaffold
FiledStatusContractorScope
08/25/2026Permit IssuedTribute RestorationScaffold
2 projects · most recent 02/27/2026
Tenant Protection Plan 72 Hour Suspended Scaffold
FiledStatusContractorScope
02/27/2026Permit IssuedKings Group NYTenant Protection Plan 72 Hour
09/09/2025Permit IssuedTribute RestorationSuspended Scaffold
1 project · most recent 09/09/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/09/2025Permit IssuedTribute RestorationSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
01/30/2026Fail-Final General Construction Non-Directive 14FailView ↗
12/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/12/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/10/2025No Access-Final Boiler Equipment InspectionNo AccessView ↗
02/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/13/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/01/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/27/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
08/25/2026Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
06/15/2026Lighting controlsRyan Minenergy_progress
06/15/2026Interior lighting powerRyan Minenergy_progress
06/15/2026Fire-Resistance Rated ConstructionRyan Minprogress
06/15/2026Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
05/04/2026FinalRyan Minprogress
10/06/2025Tenant Protection Plan Compliance—special
09/07/2025Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
08/25/2025Tenant Protection Plan Compliance—special
07/25/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
07/25/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
07/25/2025MasonrySAMI HAJJAR P.Especial
07/25/2025Post-installed AnchorsSAMI HAJJAR P.Especial
07/22/2025FinalEvan Petkanasprogress
06/27/2025Tenant Protection Plan Compliance—special
05/29/2025Fenestration air leakageMAHFUZAR RAHMANenergy_progress
05/29/2025Structural Stability – Alterations of existing buildingsMAHFUZAR RAHMANspecial
05/29/2025Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
05/29/2025FinalAaron McDonaldprogress
05/29/2025Energy Code Compliance InspectionsMAHFUZAR RAHMANprogress
05/29/2025Fenestration areasMAHFUZAR RAHMANenergy_progress
05/29/2025Lighting in dwelling unitsMAHFUZAR RAHMANenergy_progress
05/19/2025FinalAaron McDonaldprogress
05/19/2025Mechanical SystemsMAHFUZAR RAHMANspecial
04/18/2025Lighting in dwelling unitsjames ferranteenergy_progress
Latest 25 of 86.
633 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account