← Back
Two family frame
135-02 87 AVENUE
QUEENS · BIN 4206362
💬 Discuss this project
1920Year Built
2.5Stories
B2Building Class
R4AZoning
2,358 sfGross Floor Area
2Units
5 Open Violations ▸FDNY Report ↗
Two family frame · 4,000 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BARRY J. BANK, P.E., CONSULTING ENG308/23/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOHNNY'S P&H CONTRAC INCPlumbing207/08/2026
ASSURED BUILDERS INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BARRY J. BANK, P.E.1868308/23/2023
Building Lifecycle
All (51)Filed (3)Permit Issued (3)Signed Off (3)Violation (14)Inspection (6)Objection (8)Special Inspection (14)
10/13/2023
Signed off — Alteration
Filed to propose replacement boiler in conjunction with legalization application.
Q08038100-I1
10/13/2023
Signed off — Alteration
Filed to propose replacement boiler in conjunction with legalization application.
Q08038100-S1
09/27/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/08/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/04/2023
Permit issued — Plumbing
Q08038100-S1-PL
08/23/2023
Filed — Alteration
Filed to propose replacement boiler in conjunction with legalization application.
Q08038100-S1
07/14/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/23/2023
Signed off — Alteration
Q08038096-I1
04/03/2023
Permit issued — General Construction
Q08038096-I1-GC
03/16/2023
Permit issued — Plumbing
Q08038100-I1-PL
01/11/2023
Objection raised — Accessibility
01/11/2023
Objection resolved — Addressed
12/07/2022
Objection raised — Admin
12/07/2022
Objection resolved — Addressed
12/07/2022
Objection raised — Cost
12/07/2022
Objection resolved — Addressed
12/07/2022
Objection raised — Accessibility
12/07/2022
Objection resolved — Addressed
12/06/2022
Filed — Alteration
Filed to propose replacement boiler in conjunction with legalization application.
Q08038100-I1
12/06/2022
Filed — Alteration
Q08038096-I1
12/05/2022
Special inspection requirement — Maintenance information
Barry Bank, P.E.
12/05/2022
Special inspection requirement — HVAC-R and service water heating system controls
Barry Bank, P.E.
12/05/2022
Special inspection requirement — Interior lighting power
Barry Bank, P.E.
12/05/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Barry Bank, P.E.
12/05/2022
Special inspection requirement — HVAC-R and service water heating equipment
Barry Bank, P.E.
12/02/2022
Special inspection requirement — Ventilation and air distribution system
Barry Bank, P.E.
11/10/2022
Special inspection requirement — Air barrier - visual inspection
Barry Bank, P.E.
11/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Barry Bank, P.E.
11/10/2022
Special inspection requirement — Fenestration areas
Barry Bank, P.E.
11/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Barry Bank, P.E.
11/10/2022
Special inspection requirement — Final
Barry Bank, P.E.
11/10/2022
Special inspection requirement — Energy Code Compliance Inspections
Barry Bank, P.E.
11/10/2022
Special inspection requirement — Fenestration air leakage
Barry Bank, P.E.
11/10/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Barry Bank, P.E.
09/21/2022
Violation issued (ECB, closed)
Construction
09/20/2022
Violation issued (ECB, closed)
Construction
04/02/2015
Violation issued (HPD, open)
B
04/02/2015
Violation issued (HPD, open)
B
04/02/2015
Violation issued (HPD, open)
B
06/30/2012
Violation issued (ECB, closed)
Construction
06/22/2012
Violation issued (ECB, closed)
Construction
06/22/2012
Violation issued (ECB, closed)
Construction
12/14/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/21/2011
Violation issued (ECB, closed)
Construction
06/20/2011
Violation issued (HPD, open)
I
06/02/2011
Violation issued (HPD, open)
C
05/05/2006
Violation issued (ECB, closed)
Construction
12/02/1993
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOHNNY NANHU09/04/2023
DOB NOWGeneral ConstructionSigned-offASSURED BUILDERS INC04/03/2023
DOB NOWPlumbingSigned-offJOHNNY NANHU03/16/2023
1 project · most recent 01/12/2023
General Wiring
FiledStatusContractorScope
01/12/2023CompleteC & A ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/08/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/14/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
12/05/2022Maintenance informationBarry Bank, P.E.energy_progress
12/05/2022HVAC-R and service water heating system controlsBarry Bank, P.E.energy_progress
12/05/2022Interior lighting powerBarry Bank, P.E.energy_progress
12/05/2022HVAC-R and service water piping design and insulationBarry Bank, P.E.energy_progress
12/05/2022HVAC-R and service water heating equipmentBarry Bank, P.E.energy_progress
12/02/2022Ventilation and air distribution systemBarry Bank, P.E.energy_progress
11/10/2022Air barrier - visual inspectionBarry Bank, P.E.energy_progress
11/10/2022Fire-Resistant Penetrations and JointsBarry Bank, P.E.special
11/10/2022Fenestration areasBarry Bank, P.E.energy_progress
11/10/2022Fire-Resistant Penetrations and JointsBarry Bank, P.E.special
11/10/2022FinalBarry Bank, P.E.progress
11/10/2022Energy Code Compliance InspectionsBarry Bank, P.E.progress
11/10/2022Fenestration air leakageBarry Bank, P.E.energy_progress
11/10/2022Fenestration and door U-factor and product ratingsBarry Bank, P.E.energy_progress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026Q08038100-I1Request digital key ↗
08/25/2026Q08038100-S1Request digital key ↗
08/15/2026Q08038096-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q08038096-I1Open ↗
08/13/2026Q08038100-I1Open ↗
08/13/2026Q08038100-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026Q08038096-I1Open ↗
08/28/2026Q08038096-I1Open ↗
08/23/2026Q08038100-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q08038096-I1Open ↗
08/23/2026Q08038100-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026Q08038096-I1Open ↗
08/13/2026Q08038100-I1Open ↗
08/13/2026Q08038100-S1Open ↗